Loading...
HomeMy WebLinkAboutDrainage Details C6DRAM. WALL T or G WEIGHT A B C D E DIAM. +1' R -I R -2 SKIRT 12 2 1 1/2, 530 4 ,24 48'4, 12 24 13 10 1/16 9 31/2 15 2 1 4 2 140 6 21 46 13 30 16 12 11 31/2 18 2 1 /2 2 990 9 21 46 13 36 19 151/2 12 4 21 2 2 1 /4 1280" 9 35 38 13 42 22 16 13 4 24 3 2,1/2 1520 9 .43'2 30 13 48 25 16 11/16 14 4 1 /2 NOT TO SCALE NOT TO SCALE ALL SILT FENCES ARE TO BE PLACED AT TOE OF SLOPE 4 PERIMETER OF GRADING AREA NOT TO SCALE ECTt EXCAVATE 4' x 4' TRENCH UPSLOPE ALONG POSTS $IL.YFEN CE DETAIL PLAN VIEW C DRAINAGE STRUCTURE FLAN VIEW TYPICAL 2` x 2' WOODEN STAKE ELEVATiON O U! BALE SEDIMENT TRAP FENCE POSTS. GROOVEt! END ON OUTLET, TONGUE END ON INLET STAPLE !WIRE FENCING TO FENCE POSTS (SACK FILL 4 COMPACT EXCAVATED SOIL INTO TRENCH) t"\i NOTES: I. SEDIMENT SHALL: _BE REMOVED. AND TRAP RESTORED TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO 1/2 THE DESIGN DEPTH OF THE TRAP. 1 00000000 00000700 00000000 00000000 00000000 00000000 00000000 00000000 A 6 WIRE MESH REINFORCEMENT (3) STAKES PER BALE STAW BALES SHALL BE fIt TALLED WHEN THE CATCH BASIN 1S INSTALLED AND SHALL REMAP UNT1. PERMAN- ENT DACE 19 INSTALLED. CONTRACTOR SHALL. INSPECT DAMS DALY TO INSURE SENT IS NOT ENTERING STORM STRUCTURES, WATERWAYS, OR SEWERS. TYP, STRAW BALE GRADE ATTACH FILTER FABRIC TO WIRE, FENCE 4 EXTEND IT INTO TRENCH NdEENA 4 1!. 40i Olt EQUAL AVEMENT f� NOTE1 USE AT ALL EXISTING INLETS AND AT ALL OTHER INLETS AS NEEDED 'DURING CONSTRUCTION. RIP -RAP TO SE PLACED ON SIDE SLOPES SECTION A- A 51 -TALL COMPLY WITH ALL APPLICABLE PORTIONS OF A.S.T.M. C16. 1 1/2 R. HORIZONTAL FLARE 1/32' PER I TAPER EA. SIDE NOTES: EXISTING- ROADWAY (ASPHALT) L 1' 2 1/2' CRUSHED STONE, NOT LESS THAN FULL WIDTH OF INGRESS AND EGRESS. 2. WHEN NECESSARY, UMEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO pUBLIC RIGHT -OF -WAY. IT .SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT TRAP. 3. THE ENTRANCE SHALL BE MAINTAINED N A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO EXISTING ROADWAY, ALL SEDIMENT SPILLED, TRACKED, OR DROPPED ONTO PU3LIC RIGHT OF -WAY MUST BE REMOVED IMMEDIATELY. STABILIZED CONSTRUCTION ENTRANCE NOT TO SCALE emu cro emu. N C:T AREAS REOUIRING EROSION CONTROL BLANKETS WEEKLY TO INSURE SEEDING TAKES HOLD. ALL, AREAS THAT NEED TO SE RED SHALL. BE DONE AS QUICKLY AS PRACTICAL CRASS SEED SHALL RE WAS AS NECESSARY TO PROMOTE GROWTH. NOT TO SCALE j v SCALE: 1/2' SCALE: 1/2' USE A COMMON ROW OF STAPLES ON ADJOINING BLANKETS 1..25 O.D. +12 Trff y 15 OD. +1' STAPLE PAT TERN DETAIL PROVIDE TRANSITION BETWEEN STABILIZED CONSTRUCTION ENTRANCE AND EXISTING ROADWAY 50' MIN. MINIMUM OF 6' TOPSOIL OVER EXCAVATION TO ENSURE GROUNDCOVER GROWTH USE 4 STAPLES ACROSS AT THE START O EACH ROLL AND CONTINUE TO STAPLE THROUGHOUT THE LENGTH OF THE ROLL. (100) STAPLES MINIMUM PER ROLL. CfiRUSI -fED .6Tl E' OR APP OVER EQUAL, CLASS I BEDDING MATERIAL HAND TAMPED OR WALKED INTO PLACE NOTE: ALL BEDDING 4 INITIAL BACKFILL SHALL BE INSTALLED IN 6" 12' BALANCED LIFTS PLASTIC PIPE 1'ENC;4 DETAIL (MORE *W< s FROM MINIMUM OF 6' TOPSOIL OVER EXCAVATION TO ENSURE GROUNDCOVER GROWTH 'B' BORROW OR EQUAL GRANULAR MATERIAL COMPACTED TO 95 STANDARD PROCTOR DENSITY "8 CRUSHED STONE OR APPROVED EQUAL CLASS I BEDDING MATERIAL HAND TAMPED OR WALKED INTO PLACE NOTE: ALL BEDDING 4 INITIAL BACKFILL SHALL BE INSTALLED IN b' 12' BALANCED LIFTS PLASTIC PIPE TRENCH DETAIL 0 1111 OF PAVEMENT) A MINIMUM 9' OF CLEARANCE SHALL BE PROVIDED ON EACH SIDE OF THE INSTALLED PIPE A MINIMUM 9' OF CLEARANCE SHALL BE PROVIDED ON EACH SIDE OF THE INSTALLED PIPE 2:1 SLOPE OR LESS ON ALL SIDES NOT TO SCALE NOT TO SCALE NOTE: USE 'INDEPENDENT 'CONCRETE PIPE CORP. CATC4EA5fN TYPE `Al E'3 BARS 4 QC. EACH WAY NLET TYPE A OR EQUAL. V C� A K\, \A\/ \f ,y \`4 iti�i \�!r;\i\ iii\ \X\1 f N r i� FREST IC TO O!F!CE OET,4!L NOT TO SCALE 1.25 O.D. +12 NOT TO SCALE MINIMUM TOPSOIL OVER EXCAVATION TO ENSURE GROUNDCOVER GROWTH IF REQUIRED 1 15' ORROIr OR EQUAL' CSRANULAR MATERIAL COMPACTED TO 95 'STANDARD PROCTOR DENSITY 'EV SORROW OR EQUAL GRANULAR MATERIAL COMPACTED TO 95 STANDARD PROCTOR DENSITY NOTE: PE TO SE SET AT INVERT ELEVATION OF 12' PE AND GROUTED SOLID WITH NON 51 -IRINK GROUT NOTE: CRETE PIPE TRENCH DETAIL nuir s oFPAN/Er/94*) ate% j r 1101 4.0 4 4(\ I25 OD, +1' DEPTH BEDDING MATERIAL BELOLU PIPE INSIDE DIAMETER (d) MIN. 21' t SMALLER 3' 30' 60' 4' 66' 4 LARGER 6' MINIMUM 01` 6' TOPSOIL OVER EXCAVATION 'TO ENSURE GROUNtCOVE F'. GROWTH IF REQUIRED conrcFZErE PIPE MEN REGULAR BACKFILL BORROW OR EQUAL GRANULAR MATERIAL COMPACTED TO 95 t STANDARD PROCTOR DENSITY DEPTH OF E. 1N6 MATERIAL !BELOW PIPE INSIDE DIAMETER (d) MIN. 21' 4 SMALLER 3' 30' 60' 4' 66' 4 LARGER 6" ALL BEDDING x INITIAL BACKFILL SHALL 5E INSTALLED IN 6' 12' BALANCED LIFTS A MINIMUM •9' OF CLEARANCE SHALL BE PROVIDED ON EACH SIDE OF THE INSTALLED PIPE NOTE: ALL. IBEDD1NCx s twitALBACKFILL SHALL BE .INSTALLED IN 6' 12' BALANCED LIFTS A MINIMUM 9* OF CLEARANCE 51-IALL BE PROVIDED ON EACH SIDE OF THE INSTALLED PIPE ST0531 INLET 6ED IMENr WRAP INVERT T. O. C. NEENAH IRON GUTTER INLET FRAME AND GATE