Loading...
HomeMy WebLinkAboutConstruction DetailsGRADE 10" 8 INSTALL RETRACTABLE TOP EXPANSION JOINT PRIOR FENCE POST FENCE POST SHOULD BE BURIED :1' BELOW GROUND SURFACE. TO POURING CONCRETE; REMOVE AND INSTALL SEALANT AFTER COMPLETION I FACE OF CURB 5' 03 3' 24" PROVIDE EXPANSION JOINT WHEREVER CONCRETE SLAB MEETS A VERTI CO \CRET- ROLL CJRB 8c GJTTER CONTRACTION JOINTS 8' -O" O.C.. OR AS SHOWN ON PLAN. C -A a A. SILT FENCE MATERIAL SILT FENCE DETAIL NOT -TO -SCALE 4 1/2" 17 1/2" 6 1/2" LOW POINT PAVEMENT COMPACTED AGGREGATE COMPACTED SUBGRADE 6 8 GROUND SURFACE SILT FENCE MATERIAL SHOULD BE BURIED 6" BELOW GROUND SURFACE, BROOM FINISH POOL DEC SECTION NOT -TO -SCALE (BY POOL CONTRACTOR) REINFORCE CURB CORNERS W/ TWO CONT. #4 BARS WITH 4" LEGS. NOT REQUIRED ON RADIUS CURVES SEALANT PREMOLDED EXPANSION JOINT FILLER COLORED TO MATCH CONCRETE AFTER CONSTRUCTION; CUT BACK 1/4" AIR ENTRAINED CONCRETE w/ FIBER MESH REINF. PREMOLDED EXPANSION JOINT FILLER COLORED TO MATCH CONCRETE; AFTER CONSTRUCTION CUT BACK 1/4" 4" COMPACTED GRANULAR FILL COMPACTED SUBGRADE OR BACKFILL 2 -WOOD STAKES 15 -20" IN GROUND (PER BALE) 4" CONC. WALK w/ 6 "X6" 10/10 WWM ON 4" COMP. GRAN. FILL 4" CONC. SIDEWALK w/ 6 "X6" 10/10 WWM 4" COMPACTED GRANULAR FILL COMPACTED FILL ANGLE FIRST STAKE TOWARD PREVIOUSLY 441 ID BALE 401 .f/ SAW CUT 3' 0" w (2) CONT. #4 BARS UIK. Uh tiKUUM PLAN VIEW NOT -TO -SCALE \j/ III ��I —II� SECTION "A" NOT -TO -SCALE -I 11= III= III I_ -111= III I -III III- I III I 1 I I SECTION B NOT -TO -SCALE NOT -TO -SCALE .I. NOT -TO -SCALE STRAW BALE DAM DETAIL 6 CURB/ SIDEWALK DETAIL NOT -TO -SCALE SEALED EXPANSION JOINT (TYPICAL) 4' 0" SEALED EXPANSION JOINT RAMP DETAIL r f d 1 1 /2" SAW -CUT GROOVES w SLOPED 4" CONC. RAMP w/ 6 "X6" 10/10 WWM 4" CONC. WALK w/ 6 "X6" 10/10 WWM 4" COMPACTED GRANULAR FILL COMPACTED FILL CHINK GAPS W /STRAW SECTION EROSION CONTROL NOTES 1. PROVIDE EROSION AND SEDIMENT CONTROL AS INDICATED ON DRAWINGS OR AS REQUIRED TO THE STANDARDS, SPECIFICATIONS, PROCEDURES OF THE LOCAL, CITY AND COUNTY AGENCIES, WHICHEVER HAS JURISDICTION. 2. SOIL EROSION CONTROL DEVICES AND PRACTICES WILL BE ESTABLISHED IMMEDIATELY BEFORE ANY CLEARING, GRADING, EXCAVATION, FILLING, OR OTHERWISE DISTRUBING OF NATURAL TERRAIN, AND IMMEDIATELY AS REQUIRED AROUND ALL NEW CONSTRUCTION. THE CONTRACTOR SHALL PRESERVE NATURAL VEGETATION AS MUCH AS POSSIBLE. 3. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL REMAIN IN PLACE DURING THE ENTIRE CONSTRUCTION PHASE. ONLY THOSE CONTROLS AND DEVICES THAT ARE TEMPORARY IN NATURE SHALL BE MOVED OR MODIFIED TO ALLOW PROGRESS OF CONSTUCTION. DAILY INSPECTIONS SHALL BE MADE BY THE CONTRACTOR FOR EFFECTIVENESS OF EROAION AND SEDIMENTATION CONTROL MEASURES, AND ANY NECESSARY REPAIRS SHALL BE PERFORMED WITHOUT DELAY. THE G. C. SHALL BE TOTALLY RESPONSIBLE FOR THE CARE, MAINTENANCE, REPAIR AND RECONSTRUCTION OF ALL DEVICES, CONTROLS AND ERODED AREAS. 4. LAND ALTERATION WHICH STRIPS OR DISTURBS THE EXISTING VEGETATION SHALL BE DONE IN A WAY THAT WILL MINIMIZE EROSION. THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM. THE AREA SHALL BE STABILIZED IMMEDIATELY FOLLOWING GRADING WITH TEMPORARY SEEDING AND HYDROMULCH. SEED SHALL BE "R" MIX AS SPECIFIED IN INDIANA STATE HIGHWAY SPECIFICATIONS AND SHALL BE APPLIED AT THE RATE OF 5 LBS /1000 S. F. VEGETATION OR STRUCTURAL EROSION CONTROL DEVICES SHALL BE INSTALLED AS SOON AS POSSIBLE. 5. STRAW BALES AND /OR SILT FENCING PROTECTION SHALL BE USED AS INDICATED ON THE LANDSCAPE PLANTING PLAN. IF LOCAL ORDINANCE REQUIRE THEIR OWN DETAILS OF EROSION CONTROL /SEDIMENT DEVICES, IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE THE LOCAL REQUIRED METHODS. 6. ALL MUD AND DIRT TRACKED OR SPILLED ON SITE PAVED AREAS, OR ON EXISTING PUBLIC OR PRIVATE ROADS, STREETS, OR DRIVES MOST BE REMOVED QUICKLY AND PROMPTLY. S /30578 /LEGAL /EROSION CONTROL February 28, 2000 0 w c w 0 L J w CL F z BACK OF CURB GRADED LAWNS TOP SOIL NOT -TO -SCALE NOT -TO -SCALE AUTO PARKING SECTION 4' -0" MIN. MIN. 4 PREPARED SUBGRADE TYPICAL SIDEWALK SECTION z O w cn rz w z 1- 6' -0" BETWEEN TRANSVERSE JOINTS 1- z O w w z 48' -0" BETWEEN EXPANSION JOINTS (MAX.) s _e 1 -4" MIN. CONCRETE SIDEWALK NOT -TO -SCALE 1 TOD SOIL III III III III III III 1 I �I 11= j II I 1 I 1 1II— ��I Ti IT I TI 1 Tr II 1 77111=7 MIN. 4" BACKFILL THE SPACE BEHIND THE CURB SHALL BE FILLED WITH SUITABLE MATERIAL TO THE REQUIRED ELEVATION AND COMPACTED IN LAYERS NOT TO EXCEED 6" IN DEPTH. 0 w c w 0 —J LL _1 W E z SUBGRADE UNDER ALL CURB SIDEWALK, AND DRIVES SHALL BE COMPACTED IN ACCORDANCE WITH SECTION 207.02 OF THE STANDARD SPECIFICATIONS. %%%IiI11IrItg�� STOEPp, `37 No. 19358 3 STATE OF HOT ASPHALTIC SURFACE TACK COAT HOT ASPHALTIC BINDER COURSE PRIME COAT COMPACTED #53 CRUSHED STONE FILL COMPACTED #2 CRUSHED STONE FILL COMPACTED SUBGRADE PROPERTY LINE oo r 0 0 C U w W Jz 0 U V) X SHEET NO. OF JOB NO. 22687 m 0- w 1- Q 0 z 0 z Z W 0 z 5 SHEETS