Loading...
HomeMy WebLinkAboutSite Development PlanEARTHWORK: EXCAVATION 2. REMOVAL OF TREES 3. PROTECTION OF TREES 4. REMOVAL OF TOPSOIL A. 5. UTILITIES 1848.01 84 LEGEND EXISTING CONTOUR EXISTING SANITARY SEWER EXISTING STORM SEWER PROPOSED GRADE PROPOSED CONTOUR PROPOSED SANITARY SEWER PROPOSED STORM SEWER PROPOSED SWALE PROPOSED 4' SIDEWALK PROPOSED 6" S.S.D. UNDER CURB A. Excavated material that is suitable may be used for fills. All unsuitable material and all surplus excavated material not required shall be removed from the site. B. Provide and place any additional fill material from offsite as may be necessary to produce the grades required on plans. Fill obtained from offsite shall be of quality as specified for fills herein and the source approved by the Developer. It will be the responsibility of the Contractor for any costs for fill needed. A. All trees and stumps from area to be occupied by a road surface area. Trees and stumps shall not be buried on site. A. The Contractor shall, at the direction of the Developer, endeavor to save and protect trees of value and worth which do not impair construction of improvements as designed. B. In the event cut or fill exceeds 0.5 foot over the root area, the Developer shall be consulted with respect of protective measure to be taken, if any, to preserve such trees. All topsoil shall be removed from all areas to be excavated or filled. Topsoil should be stored at a location where it will not interfere with construction operations. The topsoil shall be free of debris and stones. A. Rules and regulation governing the respective utility shall be observed in executing all work under this section. B. It shall be the responsibility of the Contractor to determine the location of existing underground utilities 2 working days prior to commencing work. For utility locations to be marked call Toll Free 1- 800 382 -5544 within Indiana or 1- 800 428 -5200 outside Indiana. 6. SITE GRADING A. Do all cutting, filling, compacting of fills and rough grading required to bring entire project area to subgrade as shown on the drawing. B. The tolerance for paved areas shall not exceed 0.05 feet above established subgrade. All other areas shall not exceed 0.05 feet plus or minus the established grade. Provide roundings at top and bottom of banks and other breaks in grade. C. The Engineer shall be notified when the Contractor has reached the tolerance as stated above, so that field measurements and spot elevations can be verified by the Engineer. The Contractor shall not remove his equipment from the site until the Engineer has verified that the job meets the above tolerance, FORM \EARTHWRK NOTE: DECORATIVE SIGNS, SPRINKLER SYSTEMS, TREES, LANDSCAPING MOUNDS, LIGHT POLES, OR OTHER SUCH AMENITIES ARE NOT PERMITTED IN THE RIGHT OF WAY. "HOLEY MOLEY" SAYS: 1 -800- 382 -5544 CALL TOLL FREE 1 800 428 -5200 FOR CALLS OUTSIDE OF INDIANA CAUTION 00 11111111o. 19 I.:. 58 TE O �Q L E- %mm111111wo SCALE: 1"= 20' LOCATION OF ALL EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PLAN ARE BASED UPON ABOVE GROUND EVIDENCE. (including, but not limited to, manholes, inlets, valves, marks made upon the ground by others.) AND ARE SPECULATIVE IN NATURE. THERE MAY ALSO BE OTHER EXISITING UNDERGROUND UTILIITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE EXACT LOCATIONS OF SAID EXISTING UNDERGROUND UTILITIES SHOULD BE VERIFIED BY THE CONTRACTOR PRIOR TO ANY AND ALL CONSTRUCTION. z a_ W J m LA_ Li W w II W 1— 0 W U rr) LL z 0 z w Z W z 0 z J LLJ CC U SHEET NO. 3 OF 5 SHEETS JOB NO. 41848