HomeMy WebLinkAboutApplication Babbitt, Pamela A
From: Butler, Angelina V
Sent: Tuesday, August 03, 2004 1:52 PM
To: Babbitt, Pamela A
Cc: Morrissey, Phyllis G; Pattyn, Dawn E; Tingley, Connie S; Hollibaugh, Mike P; Keeling,
Adrienne M; Kendall, Jeff A; Brewer, Scott I; Hancock, Ramona B; Dobosiewicz, Jon C;
Pohlman, Jesse M; Brennan, Kevin S
Subject: Docket No. Assignment: (SP- replat) Carmel Science Tech Park, Blk 6 #04080006 SP)
Pam,
Please print and fax this e -mail to the petitioner identified below and update the file. I have issued the necessary
Docket Number for (SP- replat) Carmel Science Tech Park, blk 6. It will be the following:
Docket No. 04080006 SP $250.00 100* 2 lots 450.00
Total Fee: $450.00
Docket No. 04080006 SP: Carmel Science Tech Park, Blk 6 Replat
The applicant seeks to divide 1 block, creating 2 lots.
The site is located at the northwest corner of 122nd St. and Carmel Dr.
The site is zoned M- 3/Manufacturing.
Filed by Adam DeHart of Keeler -Webb Associates for Carmel Drive Executive Office Park, LLC.
Petitioner, please note the following:
1. This Item will not be on an agenda of the Technical Advisory Committee.
2. Mailed and Published Public Notice does not need to occur.
3. Proof of Notice is not needed.
4. The Filing Fee must be paid before signing of the plat by the Director.
5. This Item will be reviewed administratively.
PETITIONER: refer to your instruction sheet for more detail.
Petitioner: please complete the following:
1.) Please add docket numbers to the plat: 3 86 PP, 33 98 SP, and 04080006 SP.
2.) Add owner name, address, and phone number to the plat.
3.) Add surveyors signature, seal, and date tot he plat.
4.) Provide a copy of construction plans, if possible.
5. Please change lot numbers to 1 A and 2A.
6. Include the section, township and range numbers in the legal description.
7.) Please submit a revised Secondary Plat with the above mentioned changes. Once these changes have been made and
all comments addressed, please produce a Mylar copy (with owner's signature) for signature by this Department. Two
paper copies of the plat must be filed with the Mylar prior to our signature, and three paper copies and a Mylar of the
recorded plat must be submitted following recording. Our approval of the secondary plat (signature) will be forthcoming
upon revision of the plans according to the items listed above.
Please contact Mr. DeHart at 574 -0140 (Fax: 574 -1269) with this information. Once the file is updated please
return it to Jon's office.
b
Thank you, 8 3
Angie
1
l /4 ke
APPLICATION FOR SECONDARY PLAT OR (REPLAT) Do 4°19i YI
Fee: $750.00, plus $100.00 per lot ($250.00 plus $100.00 per lot)
DATE: 7/30/04
DOCKET {)LI O i k1 j
The undersigned agrees that any construction, reconstruction, enlargement, relocation or alteration of structure, or
any change in the use of land or structures requested by this application will comply with, and conform to, all applicable laws
of the State of Indiana, and the Zoning Ordinance of Carmel, Indiana 1980, adopted under the authority of Acts of 1979,
Public Law 178, Sec. 1, et. seq. General Assembly of the State of Indiana, and all Acts amendatory thereto.
Name of Applicant: Carmel Drive Executive Office Park, LLC (317)846 -5800
Phone
Address of Applicant: Post Office Box 757, Carmel, IN 46082 Fax (317)848 -8838
Name of Owner: Frank Cosmas
Name of Subdivision:
Legal Description (To be typewritten on separate sheet and attached).
Area (in acres): 6.987 Number of Lots: 2
Length in miles of new streets to be dedicated to public use: 0
Surveyor certifying plat: Keeler —Webb Associates
Surveyor's address and phone 4'6 Cradle Drive, Carmel, Indiana 46032
Signature of Applicant: r (Print) Adam DeHart
TITLE: Proj ect alter
STATE OF INDIANA
SS:
County of
Before me, the undersigned, a Notary Public for M 0 rt (Y, County, State of Indiana, personally appear d and
acknowledge the execution of the foregoing instrument this 30 day of 91 Qt-, 20 0
ClAAA-e. COI
My Commission Expires:
o7 Notary Public I'Vl r V
5.1.10 Application for Secondary Plat: Two (2) copies, or more if necessary, of the secondary piat and the
construction plans, together with supporting documents, shall be submitted to the Building Commissioner with ibis application
and the application fee as indicated in Section 29.6 of the Zoning Ordinance.
dditional plans to be distributed to necessary authorities by applicant.
FEE: 5 Received By:
SECONDARY PLAT CHECK LIST
D: \docstemp \Secondary Plat.doc Revised 01/05/04
Carmel Drive Executive Office Park, LLC
Name of Applicant:
Name of Subdivision:
Cannel Science and Technology Park
Date of Submission: Reviewed by:
Date of Preliminary Plat Approval:
A. MYLAR AND TWO COPIES OF PLAT TO ILLUSTRATE:
J 1. Name of subdivision
2. Words "Secondary Plat"
3. Date of submission or latest revision
4. Plat drawn 50' 1" scale with north arrow
5. Names, addresses, phone numbers: Owner, subdivider, surveyor
6. Registered surveyor's signature, seal and date
�7. Accurate tract boundary lines: Show dimensions, angles, bearings
1 8. Source of title of ownership and legal description
9. Streets and rights -of -way (existing and proposed)
a. Locations
b. Names
c. Widths
10. Complete curve notes
1 11. Dimensions of land to be dedicated or reserved
12. Monuments and markers (location, type, material, size)
13. Easements (location, widths, use)
14. Building setback lines
15. Legends and notes
16. Registered land surveyor's certificate
17. Certification of dedication of streets and public property
—7- 18. Certificate of approval by Commission (opening page)
19. Certificate of acceptance by Board of Works or County Commissioners
20. Restrictions or covenants
a. Fences in detention /retention areas
b. Lighting dusk to dawn lights
c. Maintenance of common areas
V/ 21. Subdivider Agreement Form
B. SECONDARY SUPPORTING DATA TO BE PROVIDED.
1. Letters of approval submitted by the following:
a. Hamilton County Surveyor
b. Hamilton County Highway Department
c. Hamilton County Soil Water Conservation District
d. Carmel City Engineer
e. Fire Chief Carmel Fire Department
f. Carmel City Utilities Department
D: \docstemp \Secondary Plat.doc Revised 01/05/04
2. Certification of Notification
a. Police and Sheriff
b. Water and sanitary sewer utilities
c. Electric, gas, phone utilities
d. Carmel /Clay Schools
e. Hamilton Health Department (if septic)
f. Carmel Board of Public Works
3. Report describing water system, sanitary sewer system and storm drainage system.
4. Statement from State Highway Department, County Highway Department or City Street
Department (rights -of -way, road improvements, roadside drainage, entrances, culvert pipes,
condition of existing roadway and its suitability to handle proposed traffic must be specified).
5. Soils map and report from Hamilton County Soil Water Conservation District showing soil
limitations based upon intended usage.
6. Letter from the Carmel Board of Public Works or other appropriate authorities stating that
said authority has capacity for sewer /water hookups.
C. TWO COPIES OF CONSTRUCTION PLANS TO INCLUDE:
1. Professional engineer's or registered land surveyor's signature, seal and date
2. Proposed method of sewage disposal
3. Proposed water supply method
4. Proposed fire hydrant system
5. Proposed method of drainage including detention /retention both onsite and offsite.
6. Proposed street lighting and signage plan
7. Proposed landscaping and screening plan, if required
8. Proposed parking plan (cluster)
9. Plans, profiles, cross sections and specifications
10. Proposed cut and fill map
1D. FINANCIAL PERFORMANCE AND MAINTENANCE GUARANTEES
1. Written statement of commitment
D: \docstemp \Secondary Plat.doc Revised 01/05/04
CITY OF CARMEL CLAY TOWNSHIP SUBDIVISION CONTROL ORDINANCE
9.6 Subdivider Agreement Forms.
9.6.1 The following agreement shall be included as a submittal with the final plat approval application:
AGREEMENT
The developer shall be responsible for any drainage problems, including standing water, flooding and erosion control,
which arise or become evident at any time during the 3 year maintenance period after the release of the subdivision bond,
and which is attributable to a deficiency in subdivision drainage design or construction of drainage improvements. This
shall include all pipes, structures, swales, ditches and ponds which are pertinent features to the proper drainage of the
subdivision.
This responsibility of the developer shall not, however, include problems which are created subsequent to the completion
of the subdivision improvements by the improper grading by individual builders or structures and improper grading
installed or accomplished by individual homeowners.
It is the intent of this agreement that the developer shall specifically provide such sub surface drains, or storm sewers or
ditches, as are required to properly rectify any drainage problem or sub surface water problem which was not
contemplated in the original approved subdivision design, including, but not restricted to, disposal of sub surface water
from footing drains of individual lots.
ROAD IMPROVEMENTS: The typical agreement for existing contiguous Hamilton County Roads which are
substandard, with Hamilton County is:
The developer will put in 12 -inch stone base to the required width of the road, and grade the shoulders to a minimum of 6
feet width and construct proper side ditches, or, provide storm sewer and curbs. This will be the black top grade during
construction of subdivision. Then the county will come in and cut our 3 inches and put in 3 inches binder asphalt after
which the developer will be responsible for 1 inch of asphalt topping. This is being done as joint projects between
county and developer. An agreement shall be executed, in writing, between the developer and Hamilton county
specifically detailing the exact work to be accomplished by the developer and that to be accomplished by the County, and
shall also state the road or roads or portions thereof which are included. If the subdivision is contemplated to be annexed
to the City of Carmel, then the agreement shall include the City of Carmel Board of Public Works as a signatory, which
shall be for the purpose of the City of Carmel agreeing to accept the maintenance and operation, the improved road
facili on completion of said improvements and completion of annexation.
Developer Date 44 /4
29(
Witness
Chapter 9: Plat Certificates, Deed of Dedication
9 -7
as adopted per Z -160
Summer 2002 v I