HomeMy WebLinkAboutCorrespondenceCOPIES DATE NO. DESCRIPTION 1 Carmel, IN 3 Secondary Plat mylars DATE 9/9/2008 JOB NO 0407 009 ATTENTION Angela Conn Re: Carmel Drive Executive Office Park 755 765 West Carmel Drive Carmel, IN KEELER -WEBB ASSOCIATES LETTER OF TRANSMITTAL Consulting Engineers— Planners— Surveyors 486 Gradle Drive Carmel, Indiana 46032 (317) 574-0140 TO City of Carmel Depart. Of Community Services One Civic Square Carmel, IN 46032 WE ARE SENDING YOU Attached Under separate Delivery the following items: Shop drawings Prints Plans Samples Specifications El Copy of letter El Change order THESE ARE TRANSMITTED as checked below: CI For approval Approved as submitted Resubmit copies for approval For your use Approved as noted Submit copies for distribution As requested Returned for corrections Return corrected prints For review and comment FOR BIDS DUE PRINTS RETURNED AFTER LOAN TO US REMARKS Please contact me to obtain Carmel DOCS approval and submittal to Carmel BPW for approval and signatures. I understand that this is old and unusual. COPY TO SIGNED: Adam DeHart If enclosures are not as noted, kindly notify us at once. March 25, 2008 Mr. Frank Cosmas, President FCC Development Corp. 13590 -B North Meridian Street, Suite 100 Carmel, IN 46032 1 111 111 III CI EL JAMES BRAINARD, MAYOR RE: Friday, March 14, 2008 Meeting/Carmel Engineering and DOCS Dear Mr. Cosmas: Please accept these comments as our understanding of the issues discussed during our meeting on Friday, March 14, 2008 in the Department of Community Services conference room. Carmel Drive Executive Park/City Center Drive and Carmel Drive Landscaping concerns Scott Brewer and Darren Mindham will contact the current owner regarding landscaping concerns. The final Certificate of Occupancy will not be issued until these concerns are resolved. Carmel Drive Sidewalk Issue We are requesting that you contact Mr. Steve Ponsler, the apparent current owner of the west parcel and /or the current owner of the east parcel (whom we do not know), and request that the 125' unconstructed segment of sidewalk from the relocated Carmel Drive entrance east to the portion of sidewalk completed with the City's Carmel Drive, Phase II construction, be completed immediately.' If a commitment is not received for the construction of this segment of concrete sidewalk, the City will construct the sidewalk and bill the appropriate entity. In either case, a final Certificate of Occupancy will not be issued for the building until the issue is resolved. Upon completion of this segment of sidewalk, we will approve the release of your Performance Bond through our Board of Public Works and Safety with a recommendation to waive the 3 -year Maintenance Requirement and with the understanding that the remainder of the required Carmel Drive sidewalk, from the relocated curb cut west to connect with an existing sidewalk, will be bonded and constructed when the west parcel is developed. Since the City, as part of the City Center Drive Phase II road project, relocated the Carmel Drive curb cut at the Developer's request, it is the City's opinion that this is an equitable solution to a bonding issue that has been around since 1999. Secondary Plat It is our understanding that the Secondary Plat for this development has never been approved. Since it has not been approved or recorded, the subsequent Secondary Replat dividing the property into two parcels is not valid. It was determined that you and the current owners of these parcels will contact Keeler -Webb to produce a corrected and current Secondary Plat and arrange for appropriate approvals and recording. Main Guilford Plaza /Guilford Road and West Main Street Landscaping Issues Determination was made that you, your landscaper and Scott Brewer /Darren Mindham will meet on site within two weeks to resolve the landscaping issues associated with this project. We have since been DEPARTMENT OF ENGINEERING ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439 EMAIL engineering @carmel.in.gov Mr. Frank Cosmas March 25, 2008 Page 2 notified by Darren Mindham via email on March 20, that Darren has passed the final landscape inspection. Right of Way Improvements The issue is that the Right of Way Improvements were not constructed per approved plans'. Deficiencies include portions of required curb construction that were not constructed and those curbs that were constructed were extruded type curbing, which are not allowed in the right of way. We indicated our desire to schedule a meeting with yourself and Joe Piel, one of the owners, to discuss the deficiencies associated with the construction and a resolution of same. 'Per approved plans for Main Street Plaza by Insight Engineering, approval date of August 6, 2004 Park Place Centre /Adams Street and Carmel Drive The current owner of the divided north Park Place Centre parcel, Mr. Steve Ponsler, graciously agreed to construct, and has constructed, a 5 -foot wide concrete sidewalk from the north side of the existing Adams Street curb cut to the north property line, connecting with the existing sidewalk. Since the Boardwalk Shops Developer of the divided south parcel has posted Performance Guarantees for the remainder of the Concrete Sidewalk and Asphalt Path construction which was originally a requirement of Park Place Centre', we will entertain the release of your Performance Bond upon receipt of a written request to do so. However, there is a requirement to post a 3 -year Maintenance Guarantee for the sidewalk constructed by Mr. Posner. The official release of the Performance bond is contingent upon our receipt of a 3 -year Maintenance Guarantee in the amount of $509.00 The original Performance Bond will not be returned until the Maintenance Guarantee is received. We requested your assistance and asked that you please contact Mr. Posner and arrange to have this 3 -year Maintenance Guarantee posted. There is also an outstanding Performance Bond posted for the Adams Street curb cut. We will also entertain a request to release your Performance Bond for this item and recommend that the 3 -year Maintenance Requirement be waived. The original Engineer's Estimate from Mr. Adam DeHart of Keeler -Webb was as follows: Adams Street Concrete Sidewalks 881 LF $9.875/LF $8,700.00 Carmel Drive Asphalt Path 285 LF $19.574/LF $5,630.00 $14,330.00 Total 'The new concrete Sidewalk constructed was approximately 515 LF $9.875/LF $5,086.00 original Performance Guarantee value 10% Maintenance Requirement $509.00 3-year Maintenance amount. Meridian North Medical Office Building/136 Street and Illinois Street Right of Way Improvements Discussions included the options of either the actual construction of the improvements by the Developer at current construction costs or, in lieu of construction, the Developer making a contribution to the City's Non Reverting Thoroughfare Fund in the amount of the value of the improvements as determined by the Developer's Engineer" during the initial approval process of the project. We agreed that the City would deduct the cost of damages to the irrigation system (Turf Busters Inc. 7/14/2007 Invoice #6579 $1,450), resulting from the City's road project, from the final contributed amount. If the contribution to the Non Reverting Thoroughfare Fund is made, we will release the Performance Guarantees posted for the improvements and waive the 3 -year Maintenance Requirement. Otherwise, the actual construction will be required to be completed as soon as possible. A 3 -year Maintenance Guarantee would be required after completion of the construction of the required Right of Way Improvements per your letter of commitment dated and recorded. "The original Engineer's Estimate from Mr. Adam DeHart of Keeler -Webb was as follows: Decel Lane $3,285.00 Asphalt Path $2,608.00 $5,893.00 Total Mr. Frank Cosmas March 25, 2008 Page 3 Property Transfer Additionally, The City of Carmel would like to complete the negotiated land swap as required in order to facilitate the City's construction of the roundabout at 136 Street and Illinois St. /Oak Ridge Rd. In the terms or our understanding the City agreed to deed to you a strip of land immediately adjacent to the West property line of your property in exchange for the you granting Buckeye Wood River Pipeline an easement across the northwest corner or your parcel to encompass the relocation of their existing pipeline out of the path of the road project. The City also agreed to support your request to amend the Secondary Plat in order to vacate the Ingress /Egress Easement which existed across your parcel to lesson restriction on your parcel. This verbal agreement has existed for quite some time and the City now needs to formalize these understandings. Our intent in scheduling this meeting was to outline all of the remaining issues associated with your projects within the City of Carmel, to include the various City personnel involved in these issues and to attempt to provide guidance in the timely resolution of these issues. It is our desire, and hopefully it is your desire, to resolve these issues as soon as possible. Thank you for your attendance and your patience. We will be anticipating your response. Dick Hill, Engineering Administrator Department of Engineering Cc: Mike Hollibaugh, Director Department of Community Services Michael T. McBride, City Engineer ngie onn, Department of Community Services) Sco Brewer, Department of Community Services Darren Mindham, Department of Community Services Rachel Boone, Department of Community Services S: \DH ILL \LETTERSO8 \FCOSMAS31408M E ETI NG