HomeMy WebLinkAboutTAC Submittal - A2.1n ,.';a we;` t i "AeglEk ^�.oiRAN ft] NI
/.J_i� J: iy .i_i -_l A I1�yR�l_�.Jt- .1._.3.'1.
.7771:77111W
11
Douro
TUBULAR RAIL. LOW +3"
2t0- ACCESS LADDER WITH
ROOF OVER RAIL EXTENSION.
TUBULAR RAIL LOW
ACCESS LADDER WITH
ROOF OVER RAIL EXTENSION.
711111•11111,11111111111111111M1
1 -A5.2
1 -A2.1
TYP.
1 -A5.4
GUTTER
I'7
1 -A5.2
GUTTER
ROOF PLAN
1 -A2.1
TYP.
N
U)
37
GUTTERI
1/16" 1' 0"
AiL
2 -A5.1
SIM
1 -A5.4
GUTTER
2-A5.1
SIM
1 -A2.1
1 -A5.2
GUTTER I
1 A2.1 AA
1W.
i -A
N
GUTTER a
N
N
U)
GUTTER
DOWNSPOUT
SCREEN WALL
4 -A5.6
CHAINLINK FENCE
SCREEN WALL
SIDE OF WALL
OVERFLOW DRAIN
1 -A5.8
SIM
SINGLE PLY MEMBRANE
ROOFING OVER TAPERED
ROOF INSULATION.
(THIS AREA ONLY)
LEGEND
}O'{
INDICATES ROOF DRAIN WITH ROOF SUMP. REFER TO
DETAIL 7 -A2.2
o VS INDICATES VENT STACK. REFER TO SHEET A2.2
FOR SHINGLE (8 -A2.2) AND LOW SLOPED ROOF (9 -A2.2)
REFER TO PLUMBING DRAWINGS
FOR EXACT LOCATIONS AND SIZE.
INDICATES MECHANICAL UNITS REFER TO MECHANICAL
DRAWINGS FOR EXACT SIZE AND LOCATION.
INDICATES DIRECTION OF ROOF SLOPE.
INDICATES TAPERED INSULATION.
+2" INDICATES THICKNESS OF TAPERED INSULATION
INCLUDING DECK BOARD AND RECOVERY BOARD.
❑❑EO INDICATES ROOF PAVERS WITH PROTECTION SHEET BELOW.
NOTES
1. ROOF CONTRACTOR IS RESPONSIBLE FOR PROVIDING OPENINGS IN
ROOFING. ALL CONTRACTORS ARE RESPONSIBLE FOR COORDINATING
THEIR OPENING LOCATIONS AND SIZES WITH ROOFING CONTRACTOR.
2. COORDINATE LOCATION OF GUTTERS WITH EXTERIOR
ELEVATIONS SHEETS A3.1 -A3.3.
3. COORDINATE DOWNSPOUT LOCATIONS W/ STORM DRAINAGE CATCH
BASIN LOCATIONS. REFER TO SITE DRAWINGS
STRAP
4 —GUTTER
PLAN
PREFINISHED ALUMINUM
FASCIA
1 DOWNSPOUT
EDGE OF
ROOF
CLOSED END
DOWNSPOUT
I DOWNSPOUT
ALIGN W/ STORM DRAINAGE
I CATCH BASIN. SEE SITE DRAWINGS.
ELEVATION
DOWNSPOUT
8/ SOFFIT
EL 110' -S
1 DETAIL GUTTER /DOWNSPOUT
SCALE: 1 1/2' ®1•-d'
J
CI 0
Oo i0
N o
WI W
Z :CC J
J F" W
W U 2
-I Li, J Cr
W
Ow U
U cc
Q
U
U
C.) 4 4:g
c
czt W
4-4
O
z
0
U
0
5
N
a
COLLEGE WOOD ELEMENTARY
201101.02