Loading...
HomeMy WebLinkAbout2003 C1.8 Erosion Control Planill INTERDESIGN TOTAL DEVELOPMENT ARCHITECTURAL 141 East Ohio Street Indianapolis, Indiana 46204 =bone 317.263.9655 Fax 317.263.96/ www.interdesign.corn The Int•rDesign Group, Inc. doing business as INTERDESIGN. All rights reserved for original documents and as -built documents as modified by construction contractor(s). Reproduction or reuse must be preceded by written permission of The InterDesign Group, Inc. 0 e n .71 °S z 4 o$v C o1 44 o n E N �n 0 0 o gds a' G u U o -J Uc 2 Ln r!) to 0 0 0 1) r7 V) 0 0 0 (0 CJ 0 0 r7 K 0 0 0 0 0 0 788.70 789.30 J 800.40 02.00 787.20 801.96 802.30 PROPOSED YOUTH FACILITY MAIN LEVEL FF ELEV 802.00 ENTRY LEVEL FF ELEV 798.0 25 LF OF 4' PVC 789.00 797.9 789.1 797.60 832. 7999.3 798.85 Annual Ryegrass TEMPORARY SEEDING DATES: �OCT DEC fl Kind of Seed 1000 SFT Acre Remarks Wheat or Rye 3.5 LBS 2 9U. Cover Seed 1' to 1 1J2" Deep Spring Oots 2.3 LBS 3 BU. Cover Seed to 1" Deep Annual Ryegross 1 LB 40 LBS Cover Seed tq 1/4" Deep Irrigation needed during this period. `o control erosion at times other than in the shaded arecs, use mulch. ALTERNATE 1 792 c4 INV. 784.00 TOPSOIL STOCKPILE AREA SEE SHEET C1.7 FOR CONTINUATION MEG TEMPORARY CONSTRUCTION ENTRANCE STR. ST -1 TC 799.75 MEG MEG MEG kip 6? IQ MEG t MEG 4. 1 1 rgaining wall e MEG` N. N NL -800 4 4 MEG i ALTERNATE A3 EROSION CONTROL NOTES: HOLEY MOLEY SAYS DON'T DIG BLIND 'IT'S THE LAW' CA! 2 WORKING DAvS BEFORE YOU DIG 1- 800 382 -5544 CALL TOLL FREE PER INDIANA STATE LAW IS-69 -1991. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING WORK. INSTALLATION SEQUENCE 1. INSTALL TEMPORARY CONSTRUCTION ENTRANCE, SILT FENCE. 2. STRIP TOPSOIL AND STORE AS INDICATED ON PLANS. 3. ROUGH GRADE SITE 4. TEMPORARY SEEDING. 5. INSTALL UTILITIES AND STORM SEWERS. 6. INSTALL INLET PROTECTION. 7. BUILDING CONSTRUCTION. 8. FINAL GRADING AND PAVING. 9. INSTALL EROSION CONTROL BLANKETS. 10. PERMANENT SEEDING AND SODDING PER SHEET SD- 1. 11. REMOVE TEMPORARY EROSION CONTROL MEASURES AFTER EXPOSED SOIL IS STABILIZED BY PEF%IANENT SEEDING. BASE COURSE AGGREGATE 6' MIN.- GEOTEXTILE FABRIC TO STABILIZE FOUNDATION 1,.T. n 15 1. NO LAND CLEARING OR GRADING SHALL BEGIN UNTIL ALL EROSION CONTROL MEASURES HAVE BEEN INSTALLED 2. ALL EXPOSED AREAS SHALL BE SEEDED AS SPECIFIED WITHIN 30 DAYS OF FINAL GRADING. 3. SHOULD CONSTRUCTION STOP FOR LONGER 11 -AN 15 DAYS, THE SITE SHALL BE SEEDED AS SPECIFIED. 4. MAINTAIN EROSION CONTROL MEASURES AFTER EACH RAIN AND AT LEAST ONCE A WEEK. 5. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SOL SEDIMENT FROM LEAVING THE SITE. 6. CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL ORDINANCES THAT APPLY. 7. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED IF DEEMED NECESSARY BY ONSITE INSPECTION. 8. LAND OtSTURBING ACTIVITIES SHAM. NOT COMMENCE UNTIL APPROVAL TO DO SO HAS BEEN RECEIVED BY GOVERNING AUTHORITIES. 9. IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED BY WEATHER OR NIGHTFALL, THE PIPE ENDS SHALL BE COVERED WITH FILTER FABRIC. 10. ALL EXISTING STRUCTURES, FENCING, TREES, AND ETC., WITHIN CONSTRUCTION AREA SHALL BE REMOVED AND DISPOSED OF OFFSPE 11. CONTRACTOR SHALL BE RESPONSIBLE TO TARE WHATEVER MEANS NECESSARY TO ESTABLISH PERMANENT SOIL STABIUZATION. 1 30 60 832.50 MEG l 0 ficn L _J LEGEND NOTES 1. FOR DEMOLITION PLANS, SEE SHEETS C1.1 AND C1.2 2. FOR SITE LAYOUT PLANS, SEE SHEETS C1.3 AND C1.4 3. FOR GRADING PLANS, SEE SHEETS 0.5 AND C1.6 4. FOR SITE UTILITY PLANS, SEE SHEETS C1.9 AND C1.10 5. FOR SANITARY SEWER PLAN PROFILE, SEE SHEET C1.11 6. FOR SITE DETAILS, SEE SHEET C1.12 7. FOR LANDSCAPE PLAN, SEE SHEET SD -1 GRADING LEGEND PROPOSED SPOT ELEVATION Tau INDICATES MATCH EXISTING GRADE C.Oo CLEANOUT (SEE DETAIL 8/C1.12) MANHOLE (SEE DETAIL 11/C1.12) INLET (SEE DETAIL 12/C1.12) CONCRETE END SECTION (SEE DETAIL 13/C1.12) SANITARY LIFT STATION (SEE DETAIL 1/C1.13) GREASE INTERCEPTOR (SEE DETAIL 10/C1.12) EROSION CONTROL LEGEND INLET SILT CONTROL (SEE DETAIL 16/C1.12) GRADING LIMITS O TEMPORARY SEEDING OD :11 :1 MINIM MIN TEMP. CONST. ENTRANCE (SEE DETAIL, THIS SHEET) EROSION CONTROL BLANKET (SEE DETAIL 18/C1.12) RIP -RAP STRAW BALI DAM (SEE DETAIL 15/C1.12) TEMP. GRAVEL CONST. ENTRANCE S&B Construction Additions to NORTHVIEW CHRISTIAN LIFE 5535 East 131st St Carme 46033 Mark Bevis cn Drawn By JCT Checked By DBH Date 14 MARCH 200 Project Number 2008 TNT A KEY PLAN EROSION CONTROL PLAN C1.8