HomeMy WebLinkAbout2003 C1.10 Site Utility PlanINTERDESIGN
OTAL
Mark Revision
A l
DEVELOPMENT
ARCHITECTURAL
141 East Ohio Street
Indianapolis, Indiana 46204
-1one 317.263.9655 Fax 317.263.9644
www.interdesign.com
the IInterDesiga Group, Inc.
doing business as INTERDESIGN. All
rights reserved for original documents
and as -built documents as modified by
construction contractor(s). Reproduction
or reuse must be preceded by written
permission of The InterDesign Group, Inc
g. NUF
NI 0, 05 FE R ea 49
No.
910023
STATE OF
ONA
a
O a_
O
V3 V3
i
Q c
U o
Drawn
Date
Project
By JCT Checked By DBH
14 MARCH 2O03
Number 200208
NORTH
!NT A
%ate
w
WIT
(UNIT C
B
PLAN
rJ
RN TA
KEY
SITE UTILITY
PLAN
C 1 10
INTERDESIGN
OTAL
I.
A l
DEVELOPMENT
ARCHITECTURAL
141 East Ohio Street
Indianapolis, Indiana 46204
-1one 317.263.9655 Fax 317.263.9644
www.interdesign.com
the IInterDesiga Group, Inc.
doing business as INTERDESIGN. All
rights reserved for original documents
and as -built documents as modified by
construction contractor(s). Reproduction
or reuse must be preceded by written
permission of The InterDesign Group, Inc
Q 8
A v°
Z a �co
W i
Z f
eH °R'R'
Z a W'
0 o 2
u e z
a
O a_
O
V3 V3
i
Q c
U o
2
0 a
sE
c) a
X
X
X
X
n
a
m
f
4
2
X
X
X
n
E
24" INV 785.00
N 9005.6848
"E 5538.9509
PROVIDE ELECTRICAL CONDUITS
PER ELECTRICAL PLANS
E
30 LF OF 24"
RCP
24 INV 784.851
N 9005.6848
E 5581.2009
CONTRACTOR TO PROVIDE TAPPING
SLEEVE 6" GATE VALVE
CONTACT CARMEL WATER
CONTACT INDIANA GAS
FOR GAS SERVICE LOCATION
Cr 4
X
c.
I J J l J 1 1\ LL I
1
2
P1
m
UTILITY CONTINUATION DETAIL
SCALE: 1" 30'
SEE STRUCTURAL DWGS.
SEE WATER CONNECTION DETAIL
45' HALF R/W
CONTACT !P&L FOR
ELECTRICAL SERVICE
LOCATION
STR. NO. SA -2
TC 801.50
E INV 795.50
5 INV 797.50
SW INV 797.50
N 9189.2568
E 5715.7458
UFT STATION
STR. NO. SA -1
TC 802.00
N INV 798.00
S INV 798.25
N 9171.3489
E 5715.3296
GREASE INTERCEPTOR
NEENAH R- 1915 -C
TRANSFORMER
INV 799.00
25 IS OF 6" PVC AND CLEANOUT REVD.
(SEE PLUMBING PLANS FOR CONTINUATION)
INV. 784.00
C.
C.O..' C.0
INV 799.00
5 LF OF 6" PVC AND CLEANOUT REQ'D.
(SEE PLUMBING PLANS FOR CONTINUATION)
PROPOSED YOUTH FACILITY
MAIN LEVEL FF ELEV 802.00
ENTRY LEVEL FF ELEV 798.0
INV 797.95
7 LF OF 6" PVC AND CLEANOUT REQ'D.
INV 798.65
32 LF OF 6" PVC AND CLEANOUT REQ'D.
INV 799.00
16 LF OF 6" PVC AND CLEANOUT REQ'D.
SEE PLUMBING PLANS FOR CONTINUATION)
INV 799.00
35 LF' 6" PVC AND CLEANOUT'REQ'D.
E PhUMBINL, PLANS FOR CONTI
16 LF OF 12" RCP 0 2.00%
12" INV 796.68
N 9159.1238
E 5846.6513
25 LF OF 4" PVC
STR. ST -1
TC 832.16
INV 797.00
N 9174.4832
E 5862.5037
INLET TYPE "A"
NEENAH R- 4215 -C
CD
630 IF OF 7" PVCFORCEMAN
w
RECONNECT TO EXISITNG
FIRE DEPT. CONNECTION
RECONNECT TO EXISTING
FIRE HYDRANT
ma
C0
RECONNECT TO EXISITNG
GAS SERVICE
ET
CONTACT AMERITECH
FOR TELEPHONE
SERVICE LOCATION
z
O
1-
act
z
z
qT
UTILITY NOTES:
1. IT IS THE CONTRACTORS RESPONSIBILITY TO NOTIFY ALL UTILITY COMPANIES AND
DEPARTMENTS 72 HOURS BEFORE COMMENCING CONSTRUCTION ACTT/TOES TO
VERIFY ANY UTILJDES THAT MAY BE PRESENT ON SITE ALL VERIFICATIONS,
LOCATIONS, SIZE AND DEPTHS SHALL BE MADE BY THE APPROPRIATE UTILITY
COMPANIES OR DEPARTMENTS. WHEN EXCAVATING AROUND OR OVER EXISTING
UDUTIES, THE CONTRACTOR MUST NOTIFY THE UDLTTY COMPANY OR
DEPARTMENT SO A REPRESENTATIVE OF THE UDLIIY CAN BE PRESENT DURING
THE EXCAVATION TO INSTRUCT AND OBSERVE DURING THE EXCAVATION.
2. R IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSPECT EACH DAY AND
REMOVE ALL MUD, DIRT, GRAVEL AND LOOSE MATERIALS TRACKED, DUMPED,
SPILLED OR WIND BLOWN FROM THE SITE ONTO OTHER SITES, RIGHT OF WAYS,
PUBLIC OR PRNATE, STREETS OR ROADS, DRNEWAYS, YARDS OR SIDEWALKS.
THE CONTRACTOR MUST CLEAN OR PICK UP DAILY IF NECESSARY. 1HE
CONTRACTOR SHALL REDUCE THE AIRBORNE DUST DURING THE ENTIRE
CONSTRUCTION SCHEDULE WATER MAY BE USED AS A REDUCER.
3. ALL SEWER SYSTEM LINES, STRUCTURES AND APPURTENANCES SHALL BE
CONSTRUCTED ACCORDING TO STATE, CRY, AND /OR LOCAL SANITARY SEWER
SPECIFICATIONS, CODES AND REGULATIONS, USING THE LATEST EDITION.
4. CONSTRUCTION SHALL NOT BEGIN UNTIL All APPLICABLE PERMITS ARE
OBTAINED.
5. ROOF DRAINS, FOUNDATION DRAWS, AND OTHER CLEAN WATER DISCHARGE ARE
NOT PERMITTED INTO THE SANITARY SEWER FACILITY.
6. ALL FIELD 11118 ENCOUNTERED DURING THE CONSTRUCTION SHALL BE
REROUTED AND REPLACED.
7. ALL SIDE SLOPES GREATER THAN 3:1 WILL BE SODDED OR STABIUZED WITH
EROSION CONTROL BLANKET.
B. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL HAVE TEMPORARY SEEDING
AND MULCHING INSTALLED AS SOON AS POSSIBLE.
9. WHERE WATER LINES AND SANITARY SEWERS CROSS AND THE WATER LINE
CANNOT BE PLACED ABOVE OR BELOW THE SEWER WITH A MINIMUM OF 18'
VERTICAL CLEARANCE, THE SEWER MUST BE CONSTRUCTED OF WATER WORKS
GRADE DUCTILE IRON PIPE WITH MECHANICAL JOINTS OR PLASTIC (SDR 26)
SEWER PIPE NTH GASKETED, SEWER PIPE WITH GASKETED, COMPRESSION -TYPE
JOINTS.
10. WHERE WATER LINES AND SANITARY SEWER ONES RUN PARALLEL AND A
MINIMUM SEPARATION DISTANCE OF 10' -O' CANNOT BE 'ANTONIO, THE SEWER
MUST BE CONSTRUCTED OF WATER WORKS GRADE DUCTILE IRON SEWER PIPE
WITH GASKETED, COMPRESSION -TYPE JOINTS.
11. ALL PIPE LENGTHS SHOWN ON DRAWINGS ARE FOR IiYDRAUUC CALCULATION
PURPOSES ONLY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO
DETERMINE THE EXACT LENGTHS REQUIRED FOR ACTUAL INSTALLATION.
12. THE UTILITIES INDICATED ON THESE PLANS AND ON THE SURVEY MAY NOT BE A
COMPLETE INVENTORY OF ALL THE EXISTING UTILMES PRESENT ON AND
MOUND THIS SITE. THE LOCATION AND SIZE Of THESE UFIUTIES MAYBE
APPROXIMATE. THIS INFORMATION WAS GATHERED OR SUPPLED BY OTHERS AND
USED BY THE A/E AND MAY NOT BE ACTUAL. THE A/E SHALL NOT BE HELD
UABLE FOR ANY INCORRECT OR MISLEADING UTILITY INFORMATION INDICATED,
IMPUED OR NOT INDICATED ON THESE PLANS.
13. THE CONTRACTOR SHALL CONSULT ARCHITECTURAL, PLUMBING AND ELECTRICAL
PUNS FOR: INVERT ELEVATIONS AND EXACT LOCATION OF DOWNSPOUTS, WATER
LINES, TRANSFORMERS PAD OR P011, ETC.
14. ALL PAVEMENT PATCHING DUE TO UTILITY INSTALLATION, CONSTRUCTION OF
CURBS, ETC., OR DAMAGE TO EXISTING PAVEMENTS DURING CONSTRUCTION
SFwJ_ BE PATCHED WITH A PAVEMENT SECTION WHICH MEETS OR EXCEEDS THE
DUSTING SECTION BY THE CONTRACTOR DOING THE WORK.
15. THE CONTRACTOR SHALL RECOGNIZE RESPECTNE WORK AND SHALL BE
RESPONSIBLE FOR VERIFYING LOCATION, SIZE, AND ELEVATION OF THE EX'S
UTIL1ES, STRUCTURES, PIPES, PAVEMENTS, ETC. AS RELATED TO THEIR WORK.
NOTIFY WE OF ANY CONFLICT AND /OR DISCREPANCIES IN THE CONSTRUCTION
DOCUMENTS, PRIOR TO THE START OF CONSTRUCTION.
16. ALL EXISTING MANHOLES AND CATCH BASIN GRATES, WATER OR GAS VALVES
SHALL BE ADJUSTED TO NEW FINISH GRADE ELEVATION
17. All CONSTRUCTION METHODS, MATERIALS, STRUCTURES AND APPURTENANCES
MUST CONFORM TO CURRENT STMDMDS AND SPECIFICATIONS OF THE
FEDERAL, STATE, COUNTY, CITY OR LOCAL REQUIREMENTS, WHICHEVER HAS
JURISDICTION.
18. ALL WORK WITHIN RIGHT OF WAY SHALL BE IN ACCORDANCE APPROPRIATE
REGULATORY AGENCY.
19. IF ALTERNATE MATERIALS, STRUCTURES OR APPURTENANCES ARE TO BE
SUPPLIED IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY
THE A/E AND SUBMIT SHOP DRAWINGS MD COST DFFERENTW..S PRIOR TO
CONSTRUCTION.
20. TRENCHES FOR ALL UTILITIES SHALL BE BACKFILLED COMPLETELY WITH
APPROVED ENGINEERED GRANULAR MATERIAL SUITABLE TO THE A /E. SEE THE
APPROPRIATE DETAILS AND SPECIFICATIONS FOR THE APPROVED MATERIALS.
21. CONTRACTOR TO PROVIDE 2'1(2'X8' THICK CONCRETE APRON AT ALL CLEANOUTS
OUTSIDE OF BUILDING.
22. UTILITY CONTRACTOR WILL BE RESPONSIBLE FOR ALL TAP AND TIE ON FEES
REQUIRED, AS WELL AS COST OF UNDERGROUND SERVICE CONNECTIONS TO THE
BUILDING.
23. ELECTRICAL SERVICE TO PAD MOUNTED TRANSFORMER SHALL BE RUN
UNDERGROUND FROM PROPERTY LINE TO TRANSFORMER LOCATION, ASSOCIATED
COST BY UpoTY CONTRACTOR.
WATER CONNECTION DETAIL
SCALE: 1" 10'
AO 3" DOMESTIC WATER LINE
6" FIRE LINE
6" WATER MAIN
POST INOICATOR VALVE
OE GAS METER
O WALL- MOUNTED SIAMESE FIRE DEPARTMENT CONNECTION,
DUAL 11/2" METERS W/ RPZ INSIDE
l
5
NOTES
30
LEGEND
HOLEY MOLEY SAYS
DON'T
DIG
BLIND
urns s THE LAW
CALL 2 WORK NG DAYS BEFORE YOU JIG
1- 800 382 -5544
UTILITY LEGEND
JC
CALL TOLL FREE
PER INDIANA STATE LAW 15 -69 -1991.
IT IS AGAINST THE LAW TO EXCAVATE
WITHOUT NOTIFYING THE UNDERGROUND
LOCATION SERVICE TWO (2) WORKING
DAYS BEFORE COMMENCING WORK.
1. FOR DEMOUTION PLANS, SEE SHEETS C1.1 AND C1.2
2. FOR SITE LAYOUT PLANS, SEE SHEETS C1.3 AND C1.4
3. FOR GRADING PLANS, SEE SHEETS C1.5 AND C1.6
4. FOR EROSION CONTROL PLANS, SEE SHEETS C1.7 AND C1.8
5. FOR SANITARY SEWER PLAN PROFILE,
SEE SHEET C1.11
6. FOR SITE DETAILS, SEE SHEETS C1.12 AND C1.13
C.O. CLEANOUT (SEE DETAIL B/C1.12)
MANHOLE (SEE DETAIL 11/C1.12)
INLET (SEE DETAIL 12/C1.12)
Cr CONCRETE END SECTION (SEE DETAIL 13/C1.12)
O SANITARY LIFT STATION (SEE DETAIL 1/C1.13)
Ea] GREASE INTERCEPTOR (SEE DETAIL 10/C1.12)
D4 VALVE
4 FIRE HYDRANT W/ VALVE ASSEMBLY (SEE DETAIL 9/C1.12)
GAS METER
-6 'let- PROPOSED WATER UNE
PROPOSED GAS UNE
E PROPOSED ELECTRIC LINE
i
S8f3
Construction
Additions
to
NORTHVIEW
CHRISTIAN
LIFE
5535 East 131st St.
Carmel, IN. 46033