HomeMy WebLinkAboutL105N Erosion Control Plan North9
END
CH
ARD,
,P. s,_
PER RECORDS
io
0
Q
let
SIR. t19C
RIM 892.81
z z
STN. iN9B A
RIM 893.X6
0
1 4N1/=695 06
s ®.a
ps trc •w
sc__ W.
Pi! I I
fig Eta
+M.
1
1
a cs
IN NN
feta w
r
aaaao
N
N StRWIIC A/ ate 880..1
CRAWL r am
r .s r y T..
\895
9 3
8a
89• 9
STR
SIR. 9
RIM 893.8C
STR
a f
0 ---FT
e9
5
.1420 RIe6li
TIMBERS
saz w
go.01'
OI
Z€
9g
Y
yc
STR 925
I.E. 887.97
ELA
1 1
I W
I
i1oa
\i/\ //a
5
I.E. 887.
FLARED EN
S1R
I.E. 887.76
FLARED END SECT!
C CFA
&s:c1\\\
889
.E.E 899.19
l l
e9
z z
1
r
89
yP 5
1
r`
SCALE: 1" 50'
GR
p
z
EROSION CONTROL PLAN -NORTH
8
1
SEEDING NOTES
1. ANY SEEDED AREAS THAT FAIL TO GERMINATE SHALL BE RESEEDED. THE CONTRACTOR
IS RESPONSIBLE FOR PERK/DIMLY INSPECTING If TEMPORARY SEEDED AREAS FOR
EROSION ANO TO PROMPTLY RESTED THE AREA
2. FERTIUEF FALL SEEDED WHEAT OR RYE SEEDINGS NTH 5C1bs /AC NITROGEN
N FEBRUARY OR MARCH_
3- MULCH NOM CELLULOSE FIBER MAY BE USED WHERE APPUCATKN IS MADE BY
HYDRAUUC MULCHING AT THE RATE OF ONE TON PER ACRE. STRAW MULCH MAY BE USED
AND APPLIED UNFORMLY IN A CONTINUOUS BLANKET AT THE RATE OF 2 TONS PER ACRE
NTHP 24 HOURS AFTER SEEDING
SEDIMENT CONTR0. FABRIC FABRIC SHALL BE NON -WOVEN CONSTRUCTION COMPOSED
OF POLYPROPYLENE AND SHALL BE ULTRAVIOLET STABILIZED.
5. IF TEMPORARY SEEDING I5 ESTABLISHED PRIOR TO PERMANENT SEEDING, THE MULCH
MAY BE EUMNATED EXCEPT IN BARE AREAS
6. F GRADING OCCURS DURING DECEMBER, JANUARY OR FEBRUARY, NO SEEDING SHALL
TAKE PLACE UNTIL SPRING PUNTING THE ALL SEDIMENT FILTERS AND TRAPS SHALL BE
N PLACE PRIOR TO BILK EARTHMONNG OR CLEARING.
7. ALL AREAS NOT RECEIVING PAVED SURFACES SHALL BE SEEDED KITH PERMANENT
SEED MIXTURE AS SOON AS GRADE IS ESTABU9ED. RESEEDING MAY BE REQUIRED
AFTER UTILITY COMPARES HAVE CC/FLUTED ALL INSTALLATIONS.
8. ALL LOTS /OUTLOTS CR AREAS OF SITE *ERE GRADING HAS OCCURRED, AND WHERE NO
CONSTRUCTION 6 EXPECTED TO OCCUR NTH IN 60 DAYS, SHALL BE FILLED NTH ADDITIONAL
ADDITIONAL r OF TOPSOIL MC SEEDED USING NE TEMPORARY SEEDING PROCESS
9. DURING DRY WEATHER IMP LANES WATERED NTH SPRINKLERS OR OTHER APPROVED
METHODS. RESEED ANY AREAS NOT GERMINATING OR DAMAGED AT INTERVALS AS MAY BE
REQUIRED ACCORDING TO SEASONAL CONDITION. WATER GRASS AND EXECUTE NECESSARY
NEEDING UNTIL ACCEPTABLE AND FULL STAND OF TURF HAS BEEN ESTABUS ED. UPON
ACCEPTANCE BY THE DINNER, THE OWNER SHALL ASSUME MAINTENANCE OF THE LA*
AREAS.
4.
10. ALL DATES S100 ARE NOMINAL AND MAY BE VARIED WITH CONCURRENCE OF THE
LANDSCAPE ARCHITECT CR THE LOCAL SOIL CONSTRVARON!ST
SCL EROSION CONTROL SEOUENCE:
THE FOLLONNG IS A UST IN SEQUENCE OF CONSTRUCTION ACTIADES TO CONTROL SOIL
EROSION:
1. CONTRACTOR SHALL INSTALL SEDIMENT TRAPS MC STRAW BARE FILTERS AS PART OF
INITIAL PHASE OF ANY WORK TO ENSURE MATOIAIM SILT RETENTION ON -STE.
2 MASS GRADE THE SEE; SEES OF SHALES, MOUNDS AND PONDS TO BE SEEDED AND
MULCHED IMMEDIATELY UPON COMPLETION_ TEMPORARY SEEDING SHALL BE REQUIRED FOR
ALL SWALES AND DISTURBED AREAS THAT CANNOT BE FINAL- SEEDED WITHIN A TIME PERIOD
THAT NU_ PREVENT SLOPE EROSION. FOR TEMPORARY SEEDING, TIE CONTRACTOR SHALL
UDUZE A FAST GRDWNG SEED OF OTHER OATS, ANNUAL MORASS, WHEAT OR RYE
DEPENDING ON TIME OF YEAR DISTURBED AREAS SH a BE KEPT TO A LINIUUM AT ALL
TINES.
3 CONTRACTOR SHALL CONTROL DEBRIS ACCUMULATION ON ALL STREETS SURROUNDING
PROJECT BY NSTAWNG STONE SURFACE AT ALL LOCATIOJS WHERE CONSTRUCTION TRAFFIC
LEAVES THE STE. DUST SH41 BE KEPT TO A MNIANM BY UTIUZING SPRINKLING, CALOUM
CHLORIDE, VEGETATIVE COVER, SPRAY -ON ADHESIVES CR OTHER APPROVED METHODS.
4. MAINTAIN All FILTERS AND TRAPS DUNG CONSTRUCTION TO PREVENT ANY BLOCKAGES
FROM ACCUMULATED SEDIMENT. ADDITIONAL SEEDING AND STRAW BALES MAY BE REQUIRED
5. CONTRACTOR SHALL INSTALL ALL SANITARY SEWERS, STORM SEWERS. SUBSURFACE
DRAINS AND WATER MARC DRAINAGE BARRIORS PER THIS SHEET 9141 BE INSTALLED AT ALL
6. ALL PROPOSED $IREEf AREAS SHALL BE PAVED AS SOON AS POSSIBLE AFTER
9UBGRADE IS PREPARED.
7. ALL DISTURBED AREAS SHALL BE SEEDED M40 MULCHED AS SPECIFIED.
8. CONTRACTOR SHALL MMNTAN ALL TEMPORARY EROSION CONTROL MEASURES
THROUGHOUT TT( CONSTRUCTION PHASE OF THIS PROECT. REMOVE ALL TEMPORARY
EROSION AND SEDIMENT CONTROLS ONLY WHEN THERE IS A SUFFICIENT GROWTH OF GROUND
COVER TO PREVENT FURTHER EROSON.
EROSION CONTRC BLANKET:
1. THE BLANKET SHALL BE OF CONSISTENT THICKNESS EH THE STRAW EVENLY DISTRIBUTED
OVER THE ENTIRE AREA OF THE MAT. THE BLANKET SHALL BE COVERED ON THE TOP SIDE
MTH POLYPROPYLENE NETTING HAVING M4 APPROXIMATE 5/8 X 5/8" MESH, AND ON THE
BOTTOM NTH A POLYPROPYLENE NETTING NTH AN APPROXIMATE 1/4' X 1/( MESH. THE
BLANKET STALL BE SEWN TOGETHER NTH COTTON THREAD.
2 STRAW EROSION CONTROL BLANKET (OR LOW VELOCITY CHANNEL LINING) SHALL BE SC150
(ALL STRAW) AS MANUFACTURED BY NORTH AMERICAN GREEN, OR EQUIVALENT.
EROSION CONTROL BLANKET OR CHANNEL LING SHALL HAVE THE FOLLONNG PROPERTIES:
A MATERIAL CONTENT:
STRAW 70% (.35 LB/SQ. YD.)
COCONUT FIBER 301g (.15 LB/SQ. 1D.)
NETTING OIE SUE UGHTN]GHT PHOTO DEGRADABLE
0 LB /1000 SR FT. APPROX. WT.)
ONE SUE HEAVYWEIGHT PHOTO DEGRADABLE
(3 L8/1000 SQ. FT. APPROX. WT.)
THREAD COTTON
B. PHYSICAL SPEQFICAT1ONS (ROIL)
MOTH 6.5 FOOT (2M)
LENGTH 83.5 FOOT (25.414)
30 LBS 10S (13.6 KG)
60 SQ YDS. (50142)
NIGHT
AREA
STE PREPARATION:
1. SMOOTH GRADE AND COMPACT ALL AREAS TO BE COVERED NTH MAT.
2. REMOVE ALL ROCKS, DIRT CLODS, GRASS CLUMPS, TRASH MC OTHER DEBRIS
THAT WIl LIFT MAT FROM GROUNC SURFACE
ANCHOR TRENCHES
1. THE MAT MUST BE ANCHORED AT THE JPSTREAM AND DOWNSTREAM ENDS DF THE
PROTECTED AREA AND NIERYTTENTLY N BETWEEN.
2 EXCAVATE END TRENCHES TO A MINIMUM OF 1Y DEEP AND Ii NEE BEFORE PLAONG MAT
3. DIG INTERMITTENT CHECK SLOTS 6' DEEP BY 6" VIDE TRANSVERSE TO MAT AT
APPROXYATELY 25' INTERVALS.
SEEDING:
1 SEED AND FERTILIZER SHALL BE SPREAD BEFORE MAT INSTALLATION. SEED TICE,
FERRUZER TYPE AND RATE OF APPUCATIDN SHALL COMPLY Wm SEEDING
SPECFICADONS.
MAT PI ACFMFNT:
1. UNROLL MAT FLAT SIDE AGAINST THE GROUND. UNROLL MAT N DIRECTION PARALLEL
NTH IIAECTION OF WATER FLOW.
2 MAT SHOULD LAY FLAT. DO NOT PULL MAT TAUT OVER GROUND. PULLING TAUT MAY
CAUSE MAT TO BRIDGE DEPRESSORS IN THE SURFACE AND ALLOW EROSION UNDERNEATH
TO OCCUR.
3. BEGINNING AT UP OR DONNSINLAM END BURY TRANSVERSE TERMINAL END OF MAT TO
SECURE AND PREVENT EROSION FLOW UNDERNEATH.
4. FOLD AND SECURE MAT SNUGLY INTO ALL TRANSVERSE CHECK SLOTS.
5. BACKF LL AND COMPACT TRENCHES AO CHECK SLOTS AFTER STAKNG THE MAT IN
BOTTOM OF TRENCH SEE (ROUND FASTENING
6 BURY FINAL TERMINAL END AS PRESCRIBED ABOVE
7. OVERLAP ROLL ENDS BY 3' (MN.) NTH UP SLOPE MAT CPI TOP TO PREVENT UPLIFT OF
MAT END OF WATER FLOW.
8.
OVERLAP ADJACENT EDGES OF MAT BY 3 (MN.) AND STAKE SEE GROUND FASTENING.
GROUND FASTENING
1. METAL PINS OR 'MOOD STAKES ARE REC0E&IENDED FOR ANCHORING MAT TO THE GROUND
SURFACE. METAL PINS SHOULD BE 3 /16' DIAMETER STEEL NTH 1 -1/2' DIAMETER STEEL
WASHER SECURED AT HEAD OF PILL NOM STAKES SHOULD BE 1'x3' NOMINAL STOCK CUT
IN A TRIANGULAR SHAPE STAKES SHOULD BE 9' 10 113 LONG DEPENDING ON SOIL DENSITY.
LONGER ANCHORS ARE REQUIRED FOR LOOSE SOILS
2. NOTE THAT GROUND FASTENERS DIFFERENT FROM THOSE MENTIONED HERE MAY FUNCTION
INADEQUATELY CARE MUST BE TAKEN TO ASSURE THAT FASTENERS HOD MAT SEOJELY
AT THE SURFACE AND HAVE SUFFICIENT (ROUND PENETRATION TO RESIST PULLOUT.
3. STARE MAT TO GROUND ON 3 10 5 FOOT CENltj4. ADD EXTRA STAKES AT
DEPRESSIONS N GROUND SURFACE INHERE MAT BRIDGES OVER TO ASSURE GROUND
CONFORMIY-
4. DRIVE 11000 STAKES TO NI THIN 3' OF GROUND SURFACE DO NOT DRIVE FLUSH TO
SURFACE STEEL OR PI ASTIC PPS SHOULD BE DRIVEN FLUSH TO SIJRFACE.
5. N ALL TRANSVERSE TERMINAL TRENCHES AND CHECK SLOTS, STAKE EACH MAT AT ITS
CENTER ANO AT O'b€MJPPED EDGES BEFORE BACKFIL LNG AND COMPACTING.
6. STAKE OVERLAPS LONQTUDPALY AT S INTERVALS.
1. A TEMPORARY SEEDING MIXTURE SHALT BE USED IN THE AREAS *ERE STRIPPING OR
FILLS HAW BEEN GRADED AND SHALL ALSO BE USED FOR SILT AND EROSION PROTECT13
AFTER GRADNG, ALL CONSTRUCTION AREAS ARE TO BE SEEDED. SODDING OR MATTING 91A.__
BE USED ON ALL SWALES OVER 2Z SLOPE AND DABANOEENTS IN EXCESS OF 4:1 SLOPE.
2
3
WTf$NG SCOPE OF WORK:
ALL SEEDING SHALL USE HYDRO-SEEDING PROCESS.
PERMANENT SEEDING:
DATES SHALL BE WITHIN THE FaLOWNG DATES:
A SPRING APRIL 1 10 MAY 15
B. FALL SEP 1 TO OCT 15 (BLUEGRASS SEP 1 TO OCT 1)
TE SEEDING MIXDM&
YMEAT/RYE 15011:Ls /AC
SPRING OATS 1001bs /AC
ANNUAL RYE 401bs /AC
GERMAN MILLET 40bs /AC
SUDANCRASS 35Ibs /AC
1 -1 1/2' DEPTH
1' DEPTH
1/4' DEPTH
1"-T DEPTH
1 -2' DEPTH
(SEE SPECIFICATIONS FOR PERMANENT SEEDING MIXTURE AND NOTES.)
GENERAL NOTES
SEPT 15 TO OCT 30
MAR 1 TO APR 15
MAR 1 TO MAY 1 /MUG 1 TO SEP 1
MAY 1 TO JUN 1
MAY 1 TO JUL 30
1. INSTALL APPROPRIATE EROSION CONTROL MEASURES
BEFORE AND DURING EARTHWORK OPERATIONS TO
PREVENT SEDIMENT DISCHARGE OFFSITE.
2. INSPECT, CLEAN, AND MAINTAIN SEDIMENT AND EROSION
CONTROL MEASURES THROUGHOUT DURATION OF PROJECT.
3. MAINTAIN STREET AND DRIVES FREE OF DEBRIS AND SOIL
4. SILT FENCES SHALL BE INSTALLED BEFORE CONSTRUCTION
COMMENCES, AND MAINTAINED FOR THE DURATION OF
CONSTRUCTION ACTIVITY, AND UNTIL ALL PERMANENT
EROSION CONTROL MEASURES ARE IN PLACE AND GRASS
IS GROWING IN A VIGOROUS MANNER.
5. FINISH GRADE, SEED AND MULCH ALL DISTRUBED AREAS
WHICH ARE NOT TO RECEIVE PAVEMENT, STRUCTURES,
AND /OR LANDSCAPE MATERIAL
6. SEE SPECIFICATIONS FOR TEMPORARY SEEDING
REQUIREMENTS.
Master Planning
Architecture
Landscape Architecture
Engineering
Interior Design
8450 Westfield Boulevard
Suite 200
Indianapolis, Indiana 46240
317.842.0000
Fax 317.722.0930
www.omscorp.net
6765 North State Road 37
P.O. Box 2149
Bloomington, Indiana 47402
812.876.2020
Fax 812.876.2047
CERTIFIED
4 F
0 0
s
CERTIFIED
REVISIONS
V
z
cn Lie)
z
r iEL
(r)
--D
c4.
u
(en
z
DRAWN BY:
CHECKED BY:
DESIGNED BY:
L105N
Z
0
Capyeght 2002
by THE ODIE McQ.RE 6 9400( CORPORATION
Copy*IN smda Rash al wai bilking Wie
a rs a dnwsgs, and specifications ArditeGad
wank s the overall Tam as wd as the araslemmt
and mraosam of Wass ad denaa. i the design.
Rep-Dance without. written prn®on is prdsLaed
PROJECT: 02051
DATE: DECEMBER 5, 2002
GBM
BWR
GBM
EROSION CONTROL PLAN