HomeMy WebLinkAboutL105S Erosion Control Plan Southz
c
15
L104
EDGE 3R TP
STR Y'9
it? 891.95
CPLASTI
NN
V 8949
10
2 3
c7(
CO
Arr 1
'oft
587
90.01'
RkEY BOS
217/53
\�C
.'add
o\ \X t
4
STR. .25
i.E. 687.97
E
1 00. 74
5
END BECTON
E. 887.
FLARED EN ''-TON
STR. 2'
I.E. 887.76
FLARED END SEC
8g�
BsJ
i
_4e(
8
t N
i
8
883
887
asib
c\\
/8 "REBAR FOUND
12.5'DEED GAP
DRY DETENTION
BASIN
Q100 ELEV 887.50
Q10 ELEV. 886.60
MAINTAIN/XSTING ROCK DAM
SCALE f" 50'
893
EROSION CONTROL PLAN -SOUTH
SEEDING NOTES:
1. ANY SEEDED AREAS THAT FAIL TO GERMINATE SHALL BE RESEEDED. THE CONTRACTOR
I5 RESPONSIBLE FOR PERIODICALLY NSPECTNG THE TEMPORARY SEEDED AREAS FOR
EROSION AND TO PROMPTLY RESEED THE AREA.
2_ FERTIUZE FALL SEEDED MEAT OR RYE MEDIC WITH 50Ibs /AC NITROGEN
N FEBRUARY OR MARCH.
3. MULCH WOW CELLULOSE FIBER MAY BE USED MERE APPLICATION IS MADE BY
HYDRAULIC MULCHING AT THE RATE OF ONE TON PER ACRE STRAW NADI MAY BE USED
AND APPLIED UIFORMLY IN A CQiTNUOUS BLANKET AT THE RATE OF 2 TONS PER ACRE
WITHIN 24 HOURS AFTER SEEDING.
4. SEDIMENT CONTROL FABRIC FABRIC SHALL BE NCR -WOVEN CONSTRUCTION IMPOSED
OF PCOPROPYLDIE AND SHALL BE ULTRANOLET STABILIZED.
5. IF TEMPORARY SEEDING IS ESTABLISHED PRIOR TO PERMANENT SEEDING, THE MULCH
MAY BE ELIMINATED (APT N BARE AREAS.
6. IF GRADING OCCURS DURING DECEMBER, JANUARY CR FEBRUARY, NO SEEDING SHALL
TAKE PLACE UNTIL SPRING PLANING 111E ALL SEDIMENT FILTERS MC TRAPS SHALL BE
IN PUCE PRIOR TO BULK EARTI*MOMNG OR QEARING.
7. ALL AREAS NOT RECEIVING PAVED SURFACES SHALL BE SEEDED 0114 PERMANENT
SEED MIX1LRE AS SOON AS GRADE tS ESTABUSC. RESEEDING MAY BE WOWED
AFTER UTILITY COMPANIES HAW COMPLETED ALL INSTALLATIONS
NS
8. ALL LOTS /OUTLOTS OR AREAS OF SITE MERE GRADING HAS OCCURRED, AND MERE NO
CONSTRUCTION IS EXPECTED TO OCCUR WTNN 60 DAYS. SHALL BE FILLED WITH ADDITIONAL
ADDITIONAL 3' OF TOPSOIL AND SEEDED USINC THE TEMPORARY SEEDING PROCESS
9. DURING DRY *LATHER KEEP LAMS WATERED WITH SPRINKLERS CR OTHER APPROVED
METHODS RESEED ANY AREAS NOT GERMINATING OR DAMAGED AT INTERVALS AS MAY BE
REQUIRED AOWHONG TO SEASONAL CONDITION. WATER GRASS MC EXECUTE NECESSARY
NEEDING UM ACCEPTABLE AND FULL STAND OF TURF HAS BEEN ESTABLISHED. UPON
ACCEPTANCE BY THE OWNER, NE OWNER SHALL ASSUME MAINTENANCE OF THE LAM
AREAS.
to ALL DATES SHOWN ARE NOMINAL AND MAY BE VARIED RN CONCURRENCE OF THE
LANDSCAPE ARCHITECT OR THE LOCAL SOIL CONSERVATIONIST.
5011 FRO9ON CONTRA g01iNCF:
THE FGJLLOIWG IS A UST N SEQUENCE OF CONSTRUCTION ACTIVITIES TO CONTROL SOIL
EROSION:
1. CONTRACTOR SHALL INSTALL SEDIMENT TRAPS AND STRAW BALE FILTERS AS PART OF
NITIAL PHASE OF ANY WORT( TO ENSURE MAXIMUM SILT RETENTION (14-91E 2. MASS GRADE TIE SITE; SEES OF SWAMIS, MOUNDS AND PONDS TO BE SEEDED AND
MULCHED IMMEDIATELY UPON COMPLETION. TEMPORARY SEEDING SHALL BE REQUIRED FOR
ALL SWALES AND DISRNBED AREAS THAT CANNOT BE ANAL-SEEDED WTHN A TIME PERIOD
NAT WILL PREVENT SLOPE EROSION. FOR TEMPORARY SIDING, RC CONTRACTOR SHALL
UTIUEE A FAST (ROWING SEED CF EITHER OATS, ANNUAL RYEGRASS, *FEAT OR RYE
DEPENDING ON TIME OF YEAR DISTURBED AREAS SHALL BE KEPT TO A MINIMUM AT ALL
RYES.
3. CONTRACTOR SHALL CONTROL DEBRIS ACCUMULATION ON ALL STREETS 91RROUNONG
PROJECT BY INSTALLING STONE SURFACE AT Ali LOCATIONS *ERE CONSTRUCTION TRNRC
LEAVES THE SITE DUST SHALL BE KEPT TO A MINIMUM BY UTIJZNG SPRNNONG, CALCIUM
CHLORIDE, VEGETATIVE COVER SPRAY-ON ADHESIVES OR OTHER APPROVED METHODS.
4. MAINTAIN ALL FILTERS AHD TRAPS DURING CONSTRUCTION TO PREVENT ANY BLOCKAGES
FROM ACCUMULATED SEDIMENT. ADDITIONAL SEEDING AND STRAW BALES MAY BE REQUIRED
5. CONTRACTOR SHALL INSTALL At SANITARY SEWERS, STORM SEWERS, SUBSURFACE
DRAINS ANO WATER MANS- DRAINAGE BARRIORS PER THIS SHEET SHALL BE *STALLED AT ALL
6. ALL PROPOSED SWEET AREAS SHALL PE PAVED AS SOON AS POSSIBLE A ILN
SJBCRADE IS PREPARED_
7. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED AS SPECIFIED.
8. CONTRACTOR SHALL MAINTAIN ALL TEMPORARY EROSION CONTROL MEASURES
THROUGHOUT NE CONSTRUCTION PHASE OF THIS ERUCT. REMOVE ALL TEMPORARY
EROSION MD SEDIMENT CONTRAS ONLY WHEN THERE G A SUFFICIENT GROWTH OF GROUND
COVER TO PREVENT FURTHER EROSION.
ERa9cN CONTROL BLANKET:
1. THE BLANKET SHALL BE OF CONSISTENT THICKNESS NTH THE STRAW EVENLY DISTRIBUTED
OVER THE ENTIRE AREA OF THE MAT. THE BLANKET SHALL BE COVERED ON THE TOP 9DE
NTH POLYPROPYLENE NETTING HATING AN APPROXIMATE 5/8' x 5/r MESH, AND ON THE
BOTTOM NTH A POLYPROPYLENE NETTING WITH AN APPROXIMATE 1/4' X 1/4' MESH. THE
BLANKET SHALL BE SEWN TOGETHER MN COTTON THREAD.
2. STRAW EROSON CONTROL BLANKET (CR LOW VELOXTY CHANNEL UNING) SHALL BE SC150
(ALL STRAW) AS MANUFACTURED BY NORTH AMERICAN GREEN, OR EQUIVALENT.
EROSION CONTROL BLANKET OR CHANNEL URIC SHALL HAVE THE FOLLOWING PROPERTIES
A MATERIAL CONTENT:
STRAW 70% (.35 LB /SQ. YD.)
COCONUT FIBER 302 (.15 L8 /5U. YD.)
NETTING ONE SIDE UGHTWUGHT PHOTO DEGRADABLE
(1 L8 /1000 SO. FT. APPROX WT.)
CIE 9DE HEAVY*OGHT PHOTO DEGRADABLE
(3 LB /1000 SQ. FT. APPROX. WT.)
THREAD COTTON
8- PHYSICAL SPECIFICATIONS (ROLL):
ROTH
LENGTH
*EIGHT
AREA
SITE PREPARATION:
1. SMOOTH GRADE AND COMPACT ALL AREAS TO BE COVERED NTH MAT
2. REMOVE ALL ROCS, OIRT CODS, GRASS CLAPS, TRASH AND OTHER DEBPo:
THAT WILL LIFT MAT FROM GROUND SURFACE.
ANCHOR TRENCHES
1. THE MAT MUST BE ANCHORED AT THE UPSTREAM AND DOWNSTREAM ENDS OF THE
PROTECTED AREA AND INTERMITTENTLY N BET*IDN.
2 EXCAVATE END TRENCHES TO A YNIMUW OF 12' DEEP AND 6' NOE BEFORE PLADNG MAT
3. DIG INTERMITTENT CFECR SLOTS 6' DEEP BY 6" NDE TRANSVERSE TO MAT AT
APPROXIMATELY 25' INTERVALS
SEEDING.
1. STD AND FERTILIZER SHAD. BE SPREAD BEFORE MAT INSTALLATION_ RIFE TYPE,
FERTILIZER TYPE MC RATE OF APPLICATION STALL COMPLY WITH SLIDING
SPECIFICATIONS
NAT PI ACFMFNT
1. UNROLL MAT FUT SIDE AGAINST THE GROUND. UNROLL MAT IN DIRECTION PARALLEL
VAN ERECTION OF WATER FLOW.
2 MAT SHOULD LAY FLIT. DO NOT PULL MAT TAUT OVER GROUND- PUWNC TAUT WAY
CAUSE MAT TO BRIDGE DEPRESSIONS N THE SURFACE AND ALLOW EROSON UNDERNEATH
TO OCCUR
3. BEGINNING AT UP OR DOWNSTREAM END BURY TRANSVERSE TERMINAL END OF MAT TO
SECURE AND PREVENT EROSON FLOW UNDERNEATH.
4. FOLD ANO SECURE MAT SMUGLY INTO ALL TRANSVERSE CHECK SLOTS
5. BACKFILL AND COMPACT TRENCHES AND CHECK SLOTS AFTER STAKING THE MAT IN
BOTTOM OF TRENCH SEE GROUND FASTENING.
6. BURY FINAL TER 1NAL END AS PRESCRIBED ABOVE
7. MAT END OF OVERLAP ROLL ENDS WATER BY 3' (MN.) NTH UP -SLOPE MAT ON TOP TO PREVENT UPUFT CF
FLOW
8. OVERLAP ADJACENT EDGES OF MAT BY r (MN.) AND STAKE SEE GROUND FASTENNG.
GROUND FASIFTMNG:
1 METAL PINS OR WOW STAKES ARE RECOMMENCED FOR ANCHORING MAT TO 114E GROUND
SURFACE METAL PINS SHOULD BE 3/16* DIAMETER STEEL NTH 1 -1/2 DIAMETER STEEL
WASHER SECURED AT HEAD OF FIN. WOW STAKES SHOULD BE 1'x1 NOMINAL STOCK CUT
IN A TMANQJLAR SHAPE. STAKES SHOULD BE 9' TO 18' LONG DEPEDNG CN SOIL DENSITY.
LONGER ANCHORS ARE REQUIRED FOR LOOSE SOILS.
2. NOTE THAT GROUND FASTENERS DIFFERENT FROM THOSE MENTIONED HERE MAY FUNCTION
NADEUUATELY. CARE MUST BE TAKEN TO ASSURE THAT FASTENERS HOLD MAT SECURELY
AT THE SURFACE AND HAVE SUFFICIENT GROUND PENETRATION TO RESIST PULLOUT
3. STAKE MAT TO GROUND ON 3 TO 5 FOOT CENTERS ADO EXTRA STAKES AT
DEPRESSIONS IN GRIND SURFACE WHERE MAT BRIDGES OVER TO ASSURE GROUND
CONFORMITY.
4. DRIVE MOOD STAKES TO WTHNN 1 OF GROUND SURFACE DO NOT DRIVE FLUSH TO
SURFACE STEEL OR PLASTIC PINS SHOULD BE DRIVEN FLUSH TO SURFACE
5. P4 ALL TRANSVERSE TERMINAL TRENDIES AND CHECK SLOTS, STAKE EACH MAT AT ITS
(ENTER AND AT OVERLAPPED EDGES ECFORE BAC(FI LPIG AND COMPACTING.
6. STARE OVERLAPS LONGITUDINALLY AT 1 INTERVALS.
SEEDING SCOT CF WORM(:
1. A TEMPORARY SEEDING MIXTURE SHAT BE USED N THE AREAS MERE STRPPING OR
FILLS HAVE BEEN GRADED AND SHAH ALSO BE USED FOR SILT AND EROSON PROTECTION.
AFTER GRADING, ALL CONSTRUCTION AREAS ARE TO BE SEEDED. SODDING CR MATING SHALL
BE USED CR ALL WALES OVER 25 SLOPE AND EMBANKMENTS IN EXCESS CF 4:1 SLOPE
2. ALL SEEDING SHALL USE HYDRO- SEEDING PROCESS.
3. PERMANENT SEEDING:
DAZES SHALL W *ITHN THE FOLLOWING DATES
A SPRING: APRIL 1 TO MAY 15
B. FALL SEP 1 TO OCT 15 (BLUEGRASS SEP 1 TO OCT 1)
TEMPORARY BELONG WXTIIRES
MEAT/RYE 15(Ilbs /AC
SPRING OATS 10abs /AC
ANNUAL RYE 4Obs /AC
G11M MRIFT 40bs /AC
SmANGRASS 351bs /AC
6.5 FOOT (211)
83.5 FOOT (25.4M)
30 LBS 105 (13.6 KG)
60 S0. YDS. (50112)
1 -1 1/2 DEPTH
1' DEPTH
I/4• DEPTH
1' -2 DEPTH
1 -2 DEPTH
(SEE SPECIFICATIONS FOR PERMANENT SEEDING MIXTURE AND NOTES)
W. ERAL NOTES
SEPT 15 TO OCT 30
MAR 1 TO APR 15
MAR 1 TO MAY 1 /AUG 1 TO SEP 1
MAY 1 TO JUI 1
MAY 1 TO JUL 30
1. INSTALL APPROPRIATE EROSION CONTROL MEASURES
BEFORE AND DURING EARTHWORK OPERATIONS TO
PREVENT SEDIMENT DISCHARGE OFFSITE
2. INSPECT, CLEAN, AND MAINTAIN SEDIMENT AND EROSION
CONTROL MEASURES THROUGHOUT DURATION OF PROJECT.
3. MAINTAIN STREET AND DRIVES FREE OF DEBRIS AND SOIL
4. SILT FENCES SHALL BE INSTALLED BEFORE CONSTRUCTION
COMMENCES, AC MAINTAINED FOR THE DURATION OF
CONSTRUCTION ACTIVITY, AND UNTIL ALL PERMANENT
EROSION CONTROL MEASURES PRE IN PLACE AND GRASS
IS GROWING IN A VIGOROUS MANNER.
5. FINISH GRADE, SEED AND MULCH ALL DISTRUBED AREAS
WHICH ARE NOT TO RECEIVE PAVEMENT, STRUCTURES,
AND /OR LANDSCAPE MATERIAL
6. SEE SPECIFICATIONS FOR TEMPORARY SEEDING
REQUIREMENTS.
*c Guire 440
O a ■M. n
o
J O B
Master Planning
Architecture
Landscape Architecture
Engineering
Interior Design
8450 Westfield Boulevard
Suite 200
Indianapolis, Indiana 46240
317.842.0000
Fax 317.722.0930
www.omscorp.net
6765 North State Road 37
P.O. Box 2149
Bloomington, Indiana 47402
812.876.2020
Fax 812.876.2047
CERTIFIED
Fa
0 0
CERTIFIED
REVISIONS
z
Lin
>Lgas)
r�_ L
V J
L_ L
r
V
Capri& 2002
Copyright L, ks a ODIi *CURE SHOOK CORPORATION
Copy* racdi[ead t• work, SMi deign,
plans at Aawkgs, and sped'nrNns Aid/too: l
wok s the oweral Hum as wd as the aragemnt
and c,npu0on ai specs and darts 1, the det®s
RegeorActon wltaa written pennon is wSted
PROJECT: 02051
DATE: DECEMBER 5, 2002
DRAWN BY:
CHECKED BY:
DESIGNED BY:
L105S
Z
0
Z
GBM
BWR
GBM
EROSION CONTROL PLAN