HomeMy WebLinkAboutConstruction Plans - Pollution Prevention Plan C103POLLUTION PREVENTION SCHEDULE
POLLUTION PREVENTION MEASURE
MAINTENANCE
INSTALLATION SEQUENCE
STONE ENTRANCE
PRIOR TO CLEARING AND GRADING
AS NEEDED
SILT FENCE
PRIOR TO CLEARING AND GRADING
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
EXISTING INLET PROTECTION
PRIOR TO CLEARING AND GRADING
WEEKLY, Al- ILK STORM EVENTS AND AS NEEDED
TREE PROTECTION
PRIOR TO CLEARING AND GRADING
WEEKLY, AFi LK STORM EVENTS AND AS NEEDED
TEMPORARY DIVERSIONS
ALONG WITH ROUGH GRADING
WEEKLY, AF ILK STORM EVENTS AND AS NEEDED
TEMPORARY SEEDING
AFTER ROUGH GRADING
WATER AS NEEDED
PERMANENT SEEDING
AFTER FINISH GRADING
WATER AS NEEDED
EROSION CONTROL MATTING
AFTER FINISH GRADING
WEEKLY, AF ILK STORM EVENTS AND AS NEEDED
STRAW BALES
AF ILK FINISH GRADING
WEEKLY, Al- ILK STORM EVENTS AND AS NEEDED
INLET PROTECTION
AFTER EACH INLET IS PLACED
WEEKLY, AF ILR STORM EVENTS AND AS NEEDED
SEED, SOD LANDSCAPE AROUND
AFTER FINISHED GRADING AROUND FINISHED UNITS
WATER AS NEEDED
UNITS FINISHED
REMOVAL OF STRAW BALES
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
N/A
REMOVAL OF INLET PROTECTION
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
N/A
REMOVAL OF SILT FENCE
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
N/A
EXIST.
HYDRANT
SEE CHART FOR UAIN1ENANCE REQUIREMENTS
SILT FENCE MAINTENANCE REQUIREMENTS
1. INSTALL SILT FENCING.
1.11•01111111 1•11111111•111 WWI= MINIM.
0 0 0 0 0 0
2. CONSTRUCT GRAVEL ENTRANCE.
LEGEND
TEMPORARY
PER
1
v1AN
TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS
EROSION CONTROL BLANKE
CONSTRUCTION LIMITS
SILTATI0N
r
L
E
T HYDROSEEDING
FENCE
YDR0SEEDING
INLET SEDIIv ENT DROTECTION
(SILT FENCE PRIOR TO PLACEMENT OF PA\'EME
(SAND BAGS AFTER PLACEMENT OF P, \,\%EME N
POLLUTION PREVENTION MEASURES MAINTENANCE REQUIREMENTS
1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES
INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY_
3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT
ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE.
4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE
AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
1. INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH STORM EVENT AND IMMEDIATELY
REPAIR ANY EROSION AND PIPING HOLES.
2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE -HALF THE DESIGN DEPTH.
3. REPLACE SPILLWAY GRAVEL FACING IF CLOGGED.
4. INSPECT VEGETATION, AND RE -SEED IF NECESSARY.
5. CHECK THE SPILLWAY DEPTH PERIODICALLY TO ENSURE A MINIMUM OF 1.5 FT. DEPTH
FROM THE LOWEST POINT OF THE SETTLED EMBANKMENT TO HIGHEST POINT OF THE
SPILLWAY CREST, AND FILL ANY LOW AREAS TO MAINTAIN DESIGN ELEVATION.
6. PROMPTLY REPLACE ANY DISPLACED RIPRAP, BEING CAREFUL THAT NO STONES IN THE
SPILLWAY ARE ABOVE DESIGN GRADE.
7. AFTER ALL DISTURBED AREAS HAVE BEEN STABILIZED, REMOVE THE STRUCTURE AND
SEDIMENT, SMOOTH THE SITE TO BLEND WITH ADJOINING AREAS, AND STABILIZE.
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS
1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM
EVENTS OR HEAVY USE.
2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL.
3. TOPDRESS WITH CLEAN STONE AS NEEDED.
4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS
BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS
CONVEYED INTO A SEDIMENT TRAP OR BASIN.
5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY.
POLLUTION PREVENTION MEASURES CONSTRUCTION SEQUENCE
3. INSTALL INLET PROTECTION FOR EXISTING INLETS.
4. INSTALL STORM SEWER PIPES AND INLETS.
5. INSTALL INLET PROTECTION FOR NEW INLETS.
6. GRADE SITE
7. INSTALL GRAVEL BASE FOR PARKING LOT AS SOON AS POSSIBLE.
8. COMPLETE BUILDING CONSTRUCTION AND UTILITY CONNECTIONS.
9. INSTALL PERMANENT EROSION CONTROL (PERMENANT SEED, LANDSCAPING).
10. REMOVE PERIMETER EROSION CONTROL METHODS AFTER PERMENANT
SEEDING IS ESTABLISHED.
1
ASST_ M
a r
SCALE'
POLLUTION PREVENTION SEQUENCE (CONSTRUCTION COMPONENT)
PHASE I:
1. CAI..L. THE INDIANA UNDERGROUND PLANT PROTECTION YSTEM N
"HOLEY MOLEY") AT 1 -800- 382 -5544 TO CHECK THE LOCATION OF
ANY EXISTING UTILITIES. THEY SHOULD BE NOTIFIED TWO 'WORKING DAYS
BEFORE CONS' oRUCTION TAKES PLACE.
2. PRIOR TO STA.RTING ANY CLEARING OR EARTHMOVING, EVALUATE,
MA, AND PROTECT L AND ROOT /`pi ZONES, I ,E
V f TREES 4. L...� ;`"t i 'i L_ i J, t,,.` IV i U A.7 LAS TO s�
PRESERVED, OR EXISTING VEGETATION SUITABLE FOR USE AS FILTER
STRIPS IN PERIMETER. AREAS.
3. CONSTRUCT TEMPORARY GRAVEL CONSTRUCTION ENTRANCE.
4. INSTALL PERIMETER SILT FENCE WHERE SHOWN.
5. DO NOT LEAVE LARGE AREAS UNPROTECTED FOR MORE ITHAN 7
DAYS. ADJOINING AREAS PLANNED FOR DEVELOPMENT SHOULD BE LEFT
UNDISTURBED ZONES. AS LONG AS P OSSIBL E TO SERVE AS NATURAL BUFFER
PHASE 0:
1. BEGIN LAND CLEARING FOLLOWED IMMED!ATEL Y BY GRADI F F
A�i
EXCESS TOP SOIL TO BE REMOVED FROM SITE (NO STOCK PILE ARE/S).
2. BRING SITE TO GRADE QUICKLY AND TEMPORARY SEED GENERAL LOT
AREAS.
3. INSTALL STORM SEWERS, SANITARY SEWERS WITH ROAD RED WORK.
4. INSTALL ALL. II L; l PRO i L.. F d t;.; THE ST` Rivi
FUNCTIONAL AND GRADE SWALES WITH ROCK DAMS.
DO NOT LEAVE LARGF ',,PEAS UNPROTECTED FOR 1•1OR Tr v-,1 7 D. 3
BUTTON UP PHASE:
1. FINAL GRADIN G
CONTROL. BLANKETS.
2. PAVE STREETS AND
T`MF SEED WITH
I
ARE INSTALLED.
3. SEED ALL G HEIR rF
NORTH
F HOOT VEGE +ATiON.
NOTE:
FOR ADDITIONAL POLLUTION PREVENTION
NOTES DETAILS, REFER TO
SHEETS C801 AND C802
r
WARNING
THIS SHEET TO BE USED FOR POLLUTION PREVENTION
PURPOSES ONLY. FOR ANY OTHER INFORMATION SEE
SITE, GRADING, AND UTILITY PLANS.
30'
HOLEY MOLEY SAYS
DON'T
D!G
BUNDn
AN PEI \MAkiE 11
TS THE LAW'
CALL 2 WORKING DiL,6 BEFORE 'IOU DIG
1-800-382-5544
r.EF t r sr V
AND PERMANENT SEED AFTER
CALL TOLL FREE
PER INDIANA STrrr TAW
IT IS AGAINST THE L AW IC EXCAVAIF
�JIT ry T 1.i;�TI� Thy ND :,flp( mr
LOCATION SERVICE WC (2) VORKING
DAYS BEFORE COMMENCING w^PK
1NSP EC L._. .L F ONCE. WEEK AND AGAIN
EVERY )2" RAIN EVENT. REPAIR OR REPLACE MEASURES A
THIS SEQUENCE IS SUBJECT TO REVISIONS BASED ON THE
CONTRACTOR'S STANDARD OPERATING PROCEDURES OR WE
C,ONDi =IONS WHICH MAY NECESSITATE MEASURES THAT ARE NOT
SCHEDULED.
3R
I} ITIF.S
SEE SHEET 0801 FOR POLL U LION PREVENTION PLAN SUMMA;`; AHD
"RULE 5" DATA
THE CITY ENGINEER HAS THE RIGHT TO RE' U!RE
ADDITIONAL EROSION CONTROL MEASURES IN THE
FIELD AS CONDITIONS WARRANT.
1
NOTE:
ALL EROSION CONTL PRACTICES SHALL BE IN
ACCORDANCE WITH THE IDNR "INDIANA HANDBOOK
FOR EROSION CONTROL IN DEVELOPING ARLAS" DATED
OCTOBER 1 992 AND THE SCS "FIELD OFF l C T
TECHNICAL GUIDE
EI
THIS DRA':`iNG AND THE IDEAS ;r1E:SIGNS AND
CONCEPTS CONTAINED HEREIN ARE THE EXCLU`..
IN i E1._E CTt a:L PROPERTY OF THE SCHNEIDER
CORPORATION, AND ARE NOT TO BE USED OR
PEPRODUCED, IN WHOLE OR IN PART WiTHOUT
I-t:WRITTEN toNSENT {iF THE SCHNEIDER
CORPORATION.
SHIFT TITLE:
SHEET NO.:
YRIGH T"D BY THE SCHNEIDER CORP. (20C}^`
TL F
r III Office
6845
500
Te e "io 317 277 r.
)e dercorr
A �r
L.iVil `i
r+1
DRAWN BY:
SCE
^vLte nInni
G S
3 Li
Home Builder Services
Interior Design
and Surveying
Landscape Architecture
Transportation Engineering
DATE: I PROJECT NO.:
i
POLLUTION PREY TIO P.
DRAWING FILES
91 _``.i \N' t; ;s\CI01--C1L'14.dwg
Xrefs: P: \4k \4912 \001 \dwgs\4912001 L.dwg
P 112 \dwgs \4912002_,eros.dwg
P:\410 \dwgs \4912002BS.dwg
E,... \dwgs\ TOPO.dwg
x �9
r
CHECKEC BY:
d mzxp
cD