HomeMy WebLinkAboutConstruction Plans - Pollution Prevention Plan C103POLLUTION PREVENTION SCHEDULE POLLUTION PREVENTION MEASURE MAINTENANCE INSTALLATION SEQUENCE STONE ENTRANCE PRIOR TO CLEARING AND GRADING AS NEEDED SILT FENCE PRIOR TO CLEARING AND GRADING WEEKLY, AFTER STORM EVENTS AND AS NEEDED EXISTING INLET PROTECTION PRIOR TO CLEARING AND GRADING WEEKLY, Al- ILK STORM EVENTS AND AS NEEDED TREE PROTECTION PRIOR TO CLEARING AND GRADING WEEKLY, AFi LK STORM EVENTS AND AS NEEDED TEMPORARY DIVERSIONS ALONG WITH ROUGH GRADING WEEKLY, AF ILK STORM EVENTS AND AS NEEDED TEMPORARY SEEDING AFTER ROUGH GRADING WATER AS NEEDED PERMANENT SEEDING AFTER FINISH GRADING WATER AS NEEDED EROSION CONTROL MATTING AFTER FINISH GRADING WEEKLY, AF ILK STORM EVENTS AND AS NEEDED STRAW BALES AF ILK FINISH GRADING WEEKLY, Al- ILK STORM EVENTS AND AS NEEDED INLET PROTECTION AFTER EACH INLET IS PLACED WEEKLY, AF ILR STORM EVENTS AND AS NEEDED SEED, SOD LANDSCAPE AROUND AFTER FINISHED GRADING AROUND FINISHED UNITS WATER AS NEEDED UNITS FINISHED REMOVAL OF STRAW BALES AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED N/A REMOVAL OF INLET PROTECTION AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED N/A REMOVAL OF SILT FENCE AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED N/A EXIST. HYDRANT SEE CHART FOR UAIN1ENANCE REQUIREMENTS SILT FENCE MAINTENANCE REQUIREMENTS 1. INSTALL SILT FENCING. 1.11•01111111 1•11111111•111 WWI= MINIM. 0 0 0 0 0 0 2. CONSTRUCT GRAVEL ENTRANCE. LEGEND TEMPORARY PER 1 v1AN TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS EROSION CONTROL BLANKE CONSTRUCTION LIMITS SILTATI0N r L E T HYDROSEEDING FENCE YDR0SEEDING INLET SEDIIv ENT DROTECTION (SILT FENCE PRIOR TO PLACEMENT OF PA\'EME (SAND BAGS AFTER PLACEMENT OF P, \,\%EME N POLLUTION PREVENTION MEASURES MAINTENANCE REQUIREMENTS 1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. 2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY_ 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. 4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. 5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE. 1. INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH STORM EVENT AND IMMEDIATELY REPAIR ANY EROSION AND PIPING HOLES. 2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE -HALF THE DESIGN DEPTH. 3. REPLACE SPILLWAY GRAVEL FACING IF CLOGGED. 4. INSPECT VEGETATION, AND RE -SEED IF NECESSARY. 5. CHECK THE SPILLWAY DEPTH PERIODICALLY TO ENSURE A MINIMUM OF 1.5 FT. DEPTH FROM THE LOWEST POINT OF THE SETTLED EMBANKMENT TO HIGHEST POINT OF THE SPILLWAY CREST, AND FILL ANY LOW AREAS TO MAINTAIN DESIGN ELEVATION. 6. PROMPTLY REPLACE ANY DISPLACED RIPRAP, BEING CAREFUL THAT NO STONES IN THE SPILLWAY ARE ABOVE DESIGN GRADE. 7. AFTER ALL DISTURBED AREAS HAVE BEEN STABILIZED, REMOVE THE STRUCTURE AND SEDIMENT, SMOOTH THE SITE TO BLEND WITH ADJOINING AREAS, AND STABILIZE. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS 1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM EVENTS OR HEAVY USE. 2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. 3. TOPDRESS WITH CLEAN STONE AS NEEDED. 4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED IF THE WATER IS CONVEYED INTO A SEDIMENT TRAP OR BASIN. 5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY. POLLUTION PREVENTION MEASURES CONSTRUCTION SEQUENCE 3. INSTALL INLET PROTECTION FOR EXISTING INLETS. 4. INSTALL STORM SEWER PIPES AND INLETS. 5. INSTALL INLET PROTECTION FOR NEW INLETS. 6. GRADE SITE 7. INSTALL GRAVEL BASE FOR PARKING LOT AS SOON AS POSSIBLE. 8. COMPLETE BUILDING CONSTRUCTION AND UTILITY CONNECTIONS. 9. INSTALL PERMANENT EROSION CONTROL (PERMENANT SEED, LANDSCAPING). 10. REMOVE PERIMETER EROSION CONTROL METHODS AFTER PERMENANT SEEDING IS ESTABLISHED. 1 ASST_ M a r SCALE' POLLUTION PREVENTION SEQUENCE (CONSTRUCTION COMPONENT) PHASE I: 1. CAI..L. THE INDIANA UNDERGROUND PLANT PROTECTION YSTEM N "HOLEY MOLEY") AT 1 -800- 382 -5544 TO CHECK THE LOCATION OF ANY EXISTING UTILITIES. THEY SHOULD BE NOTIFIED TWO 'WORKING DAYS BEFORE CONS' oRUCTION TAKES PLACE. 2. PRIOR TO STA.RTING ANY CLEARING OR EARTHMOVING, EVALUATE, MA, AND PROTECT L AND ROOT /`pi ZONES, I ,E V f TREES 4. L...� ;`"t i 'i L_ i J, t,,.` IV i U A.7 LAS TO s� PRESERVED, OR EXISTING VEGETATION SUITABLE FOR USE AS FILTER STRIPS IN PERIMETER. AREAS. 3. CONSTRUCT TEMPORARY GRAVEL CONSTRUCTION ENTRANCE. 4. INSTALL PERIMETER SILT FENCE WHERE SHOWN. 5. DO NOT LEAVE LARGE AREAS UNPROTECTED FOR MORE ITHAN 7 DAYS. ADJOINING AREAS PLANNED FOR DEVELOPMENT SHOULD BE LEFT UNDISTURBED ZONES. AS LONG AS P OSSIBL E TO SERVE AS NATURAL BUFFER PHASE 0: 1. BEGIN LAND CLEARING FOLLOWED IMMED!ATEL Y BY GRADI F F A�i EXCESS TOP SOIL TO BE REMOVED FROM SITE (NO STOCK PILE ARE/S). 2. BRING SITE TO GRADE QUICKLY AND TEMPORARY SEED GENERAL LOT AREAS. 3. INSTALL STORM SEWERS, SANITARY SEWERS WITH ROAD RED WORK. 4. INSTALL ALL. II L; l PRO i L.. F d t;.; THE ST` Rivi FUNCTIONAL AND GRADE SWALES WITH ROCK DAMS. DO NOT LEAVE LARGF ',,PEAS UNPROTECTED FOR 1•1OR Tr v-,1 7 D. 3 BUTTON UP PHASE: 1. FINAL GRADIN G CONTROL. BLANKETS. 2. PAVE STREETS AND T`MF SEED WITH I ARE INSTALLED. 3. SEED ALL G HEIR rF NORTH F HOOT VEGE +ATiON. NOTE: FOR ADDITIONAL POLLUTION PREVENTION NOTES DETAILS, REFER TO SHEETS C801 AND C802 r WARNING THIS SHEET TO BE USED FOR POLLUTION PREVENTION PURPOSES ONLY. FOR ANY OTHER INFORMATION SEE SITE, GRADING, AND UTILITY PLANS. 30' HOLEY MOLEY SAYS DON'T D!G BUNDn AN PEI \MAkiE 11 TS THE LAW' CALL 2 WORKING DiL,6 BEFORE 'IOU DIG 1-800-382-5544 r.EF t r sr V AND PERMANENT SEED AFTER CALL TOLL FREE PER INDIANA STrrr TAW IT IS AGAINST THE L AW IC EXCAVAIF �JIT ry T 1.i;�TI� Thy ND :,flp( mr LOCATION SERVICE WC (2) VORKING DAYS BEFORE COMMENCING w^PK 1NSP EC L._. .L F ONCE. WEEK AND AGAIN EVERY )2" RAIN EVENT. REPAIR OR REPLACE MEASURES A THIS SEQUENCE IS SUBJECT TO REVISIONS BASED ON THE CONTRACTOR'S STANDARD OPERATING PROCEDURES OR WE C,ONDi =IONS WHICH MAY NECESSITATE MEASURES THAT ARE NOT SCHEDULED. 3R I} ITIF.S SEE SHEET 0801 FOR POLL U LION PREVENTION PLAN SUMMA;`; AHD "RULE 5" DATA THE CITY ENGINEER HAS THE RIGHT TO RE' U!RE ADDITIONAL EROSION CONTROL MEASURES IN THE FIELD AS CONDITIONS WARRANT. 1 NOTE: ALL EROSION CONTL PRACTICES SHALL BE IN ACCORDANCE WITH THE IDNR "INDIANA HANDBOOK FOR EROSION CONTROL IN DEVELOPING ARLAS" DATED OCTOBER 1 992 AND THE SCS "FIELD OFF l C T TECHNICAL GUIDE EI THIS DRA':`iNG AND THE IDEAS ;r1E:SIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLU`.. IN i E1._E CTt a:L PROPERTY OF THE SCHNEIDER CORPORATION, AND ARE NOT TO BE USED OR PEPRODUCED, IN WHOLE OR IN PART WiTHOUT I-t:WRITTEN toNSENT {iF THE SCHNEIDER CORPORATION. SHIFT TITLE: SHEET NO.: YRIGH T"D BY THE SCHNEIDER CORP. (20C}^` TL F r III Office 6845 500 Te e "io 317 277 r. )e dercorr A �r L.iVil `i r+1 DRAWN BY: SCE ^vLte nInni G S 3 Li Home Builder Services Interior Design and Surveying Landscape Architecture Transportation Engineering DATE: I PROJECT NO.: i POLLUTION PREY TIO P. DRAWING FILES 91 _``.i \N' t; ;s\CI01--C1L'14.dwg Xrefs: P: \4k \4912 \001 \dwgs\4912001 L.dwg P 112 \dwgs \4912002_,eros.dwg P:\410 \dwgs \4912002BS.dwg E,... \dwgs\ TOPO.dwg x �9 r CHECKEC BY: d mzxp cD