October 19, 2010
Keeler -Webb Associates
ATTN: Adam DeHart, LS
486 Gradle Drive
Carmel, IN. 46032
VIA E -MAIL: adehart@keelerwebb.com
RE: Korean Presbyterian Church Building Addition #2
Dear Mr. DeHart:
We have reviewed the construction plans submitted to the Hamilton County Surveyor's Office
on October 1, 2010, for this project and have the following continents:
1. The proposed project falls in the unincorporated area and MS4 jurisdiction of
Hamilton County.
2. The proposed project DOES NOT fall in a Carmel Wellhead Protection Zone.
3. The proposed project does not fall in a Hamilton County Regulated Drain Watershed.
4. The proposed project is small in size and will result in a small increase in the site
runoff, and the increase is adequately compensated by the large lake downstream on
the parcel to the east.
5. No Regulated Drain Permits will be needed from our office.
6. According to Bob Thompson's review, the site will disturb less then 1 acre and no
Rule 5 permit will be required for this project.
Should you have any questions, I can be reached at 317- 776 -8495.
Sincerely,
4
r, 014fir
Greg Hoyes, AC, CFM, CPESC
Plan Reviewer
CC: Christine Barton Holmes Carmel DOCS, John Thomas Carmel Engineering
Dave Barnes Cannel Engineering, Greg Ilko Crossroad Engineers, Dave Lucas HCHD
�`4 of
om a City of Carmel
DEPARTMENT OF COMMUNITY SERVICES
October 18, 2010
Mr. Adam DeHart
Keeler -Webb Associates
486 Gradle Dr
Carmel. IN 46032
RE: Korean Presbyterian Church !Adz addition
Dear Ms. DeHart:
The following letter represents comments for this project specifically addressing the area of alternative
transportation. I have reviewed the project submitted for the October 20, 2010, Technical Advisory Committee
meeting. and the comments from the alternative transportation review have been satisfactorily addressed.
We request that all responses to our comments be provided in writing. Failure to provide written responses may
result in delay of the review process.
It is critical that this office be made aware of all modification made on the plans being re- submitted, particularly if
any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans
indicating all revisions. Please notify us of any changes and specifically state any changes, including changes
resulting from Plan Commission, Special Studies or other committee meetings.
The Department of Community Services reserves the right to provide additional comments based on subsequent
reviews.
If you have questions, please contact me at 571 -2417.
Sincerely,
David Littlejohn
Alternative Transportation Coordinator
Department of Community Services
cc: Angie Conn, Department of Community Services
Engineering Department Review
Project. File
Page 1
ONE C1VIC SQUARE CARMEL, INDIANA 46032 317/571 -2417
Q7"
Ri{'t7 l� �S
CITY F r:`tI2IVIEL
JAMES BRAINARD, MAYOR
October 8, 2010
Mr. Adam DeHart, LS.
Keeler -Webb Associates
486 Gradle Drive
Cannel, Indiana 46032
RE: Korean Presbyterian Church
Dear Mr. DeHart:
This project, scheduled for the October 20, 2010 Technical Advisory Committee meeting, is located outside
the current corporate limits of the City of Carmel and therefore, outside of the Department of Engineering
jurisdiction.
Sincerely,
.4
Gary R. D 'ncan, P.E.
Assistant ity Engineer
Department of Engineering
cc: Angelina Conn, Department of Community Services
Greg Hoyes, Hamilton County Surveyor's Office
Greg llko, Crossroad Engineers, PC
Project File
S:IPROJREV 101KOREANPRESBYTERIANCHURCH
D:PAtrt:Mn:xr OE ENGINEERING
ONE CI\ IC Sc?t ARE. CAN \ILL, Ii\ 46032 001cle 317.571. l Fan 317.571.2.139
cngl two i112.6.:cumt..1 in.4cr,
Conn, Angelina V
From: Conn, Angelina V
Sent: Tuesday, October 05, 2010 2:30 PM
To: 'Adam DeHart'
Cc: 'Kerry Wagoner'; 'Stuart Shade'
Subject: Review comments for addendum to Docket No. 10070002 SUA: Korean Presbyterian Church
Adam
DOCS would like digital copies of the new plans and project narrative.
o We would also like you to provide us with 1 paper copy and 1 digital copy of the architectural building elevations (all
three sides) that also label colors and materials, for this 1,045 sq ft building addition.
Thank you,
Angie Conn, Planning Administrator
City of Carmel Planning Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr.
Carmel, IN 46032
0: 317 -571 -2417
F: 317- 571 -2426
E: aconn(acarmel.in.gov
W: www.carmel.in.00v /services /DOCS /DOCSDOPZ.htm
Please consider the environment before printing this e-mail
1
Conn, Angelina V
From: Conn, Angelina V
Sent: Monday, September 20, 2010 9:56 AM
To: 'Stuart Shade'
Cc: 'Kerry Wagoner' 'Adam_DeHart= Boone Rachel -M..
Subject: RE: Korean Presbyterian Chur_ch= ad.ditional_b_uilding addition
Attachments: TAC"iMembers 7- 9- 10.pdf
Stu
Since the building addition square footage is less than 10% of the approved square footage of the entire building, then
we can just review, approve this additional building addition administratively, and also just have you email /mail out
plans to the TAC members again to get review comments, if any, about this small building addition; the TAC members
contact list is attached. No BZA public hearing required.
Here is what the zoning ordinance states:
21.05 Expansion of Approved Special Uses or Special Exceptions.
An approved Special Use or Special Exception may be expanded up to ten percent (10 of the approved gross floor area
without obtaining further Special Use or Special Exception approval if the approved use or exception is continued in the
expansion, if the particular building height, bulk, setback, yard, parking, etc. requirements are adhered to and if the proper
permits for the expansion, such as an Improvement Location Permit, are obtained.
-Angie Conn, Planning Administrator
From: Conn, Angelina V
Sent: Monday, September 20, 2010 9:22 AM
To: 'Stuart Shade'
Cc: Kerry Wagoner; 'Adam DeHart'; Holmes, Christine B; Boone, Rachel M.
Subject: RE: Korean Presbyterian Church additional building addition
Thanks, Stu.
Also, Adam DeHart left me a voicemail message this morning that he wants to meet to discuss this tomorrow, Tuesday. I
am available any time at or after 10 am.
Thanks,
Angie Conn, Planning Administrator
City of Carmel Planning Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr.
Carmel, IN 46032
0: 317-571-2417
F: ,317-571-2426
E: aconn @carmel.in.gov
W: www.carmel.in.,ggy/services/DOCS/DOCSDOPZ.htm
Please consider the environment before printing this e -mail
From: Stuart Shade mailto:sshade @mitschdesign.com]
Sent: Monday, September 20, 2010 9:20 AM
To: Conn, Angelina V
Cc: Kerry Wagoner
Subject: Korean Presbyterian Church
1
Conn, Angelina V
From: Stuart Shade [sshade @mitschdesign.com]
Sent: Monday, September 20, 2010 9:20 AM
To: Conn, Angelina V
Cc: Kerry Wagoner
Subject: Korean Presbyterian Church
Attachments: Proposed Plan.pdf
Angie
The Korean Presbyterian Church decided a week ago that they were one room short for their programming. They have
asked us to begin the process of determining how this proposed 1000 sq ft addition can be added and legally permitted
through Carmel. Enclosed is the proposed plan to begin the process. Kerry Wagoner with Nazareth Building Services
will be contacting you regarding this e -mail.
Thanks
Stu Shade
Stu Shade
Director of Architecture
mitsch DESIGN \VISE certified
1 171 1 north meridian street I suite 200
carmel, indiana 46032
t. 317.573.2222 ext.6307
f. 317.573.2230
d.3172 18.6307
www.mitschdesign.com
1
KEELER -WEBB ASSOCIATES LETTER OF TRANSMITTAL
I„,:: Consulting Engineers Planners Surveyors
TELEPHONE (317) 574 -0140 www.keelerwebb.com
486 Gradle Drive
Carmel, Indiana 46032
DATE JOB NO.
8/12/2010 1006 -005
TO City of Carmel, DOCS ATTENTION
Connie Tingley
One Civic Square RE:
Korean Presbyterian Church
3 Floor 1020 East 101st Street
Carmel, IN 46032 Indianapolis, IN
WE ARE SENDING YOU Attached Under separate cover via Courier the following items:
Shop drawings Prints Plans Samples Specifications
Copy of letter Change order
COPIES DATE NO. DESCRIPTION •'T
9 8/12110 sets BZA Packets 4
a•.
RECEIVED
DOGS
THESE ARE TRANSMITTED as checked below:
For approval Approved as submitted Resubmit copies for approval
For your use Approved as noted Submit copies for distribution
As requested Returned for corrections El Return corrected prints
For review and comment FOR BIDS DUE
PRINTS RETURNED AFTER LOAN TO US
REMARKS
This submittal is for the Special Use Application filing for the above project to be reviewed by BZA on August
23, 2010.
Please forward any comments, questions or concerns on this project to my attention at any time.
COPY TO SIGNED: ADAM DeHART, LS
If enclosures are not as noted, kindly notify us at once.
KEELER-WEBB ASSOCIATES LETTER OF TRANSMITTAL
Consulting Engineers Planners •Surveyors
TELEPHONE (317) 574 -0140 FAX (317) 574 -1269
486 GRADLE DRIVE
CARMEL, INDIANA 46032,"`
x 4"o DATE JOB NO.
I C y Aa tk A 8/17/2010 1006 005
"I'
.1�� ATTENTION
TO City of Carmel, DOGS 1 41
Chr Barton Holmes
One Civic Square C RE:
Korean Presbyterian Church
3 Floor ,h` 1020 East 101st Street
Carmel, IN 46032 Indianapolis, IN
WE ARE SENDING YOU Attached Under separate cover via Delivery the following items:
Shop drawings Prints Plans Samples Specifications
Copy of letter Change order
COPIES DATE NO. DESCRIPTION
2 8/12/10 3 Cover Sheet, Site Plan and Landscaping Plan
THESE ARE TRANSMITTED as checked below:
For approval Approved as submitted Resubmit copies for approval
For your use Approved as noted Submit copies for distribution
As requested Returned for corrections Return corrected prints
For review and comment FOR BIDS DUE
PRINTS RETURNED AFTER LOAN TO US
REMARKS
This submittal is for the Special Use Application filing for the above project reviewed by TAC on July 21, 2010
and reflects the requested revisions by Alternative Transportation, Urban Forester, Fire Department and
Hamilton County SWPP.
Please forward any comments, questions or concerns on this project to my attention at any time.
COPY TO SIGNED: ADAM DeHART, LS
If enclosures are not as noted, kindly notify us at once.
Conn, Angelina V
From: Duncan, Gary R
Sent: Wednesday, August 04, 2010 4:18 PM
To: Conn, Angelina V
Cc: Barnes, David R; Redden, Nick; Holmes, Christine B
Subject: RE: Korean Presbyterian Church building addition 1020 East 101st Street
Follow Up Flag: Follow up
Due By: Friday, August 06, 2010 3:00 PM
Flag Status: Flagged
I see where this is now:)
I agree, this is tricky.
This is a tough call since we do not know the location of the future extension of 96th
Street. I expect that redevelopment of this entire area will dictate the location of the 96th
Street extension. We know the end points, and it will need to scoot on the south side of the
borrow pond; but everywhere else, it is undefined. The fact that the Monon goes under 465
would make it challenging to have the Monon go above the 96th Street extension. But how we
facilitate this crossing will have a bearing on where the transition back north to intersect
with Pennsylvania Parkway occurs. As I recall, there is a cell tower east of the Monon also
(to make the alignment more challenging).
I expect that there will be buildable lots along the 465 right -of -way, which would push the
future roadway right through the church property; maybe not impacting the building and
parking lot, but through the property.
Since we do not have a workable plan developed for the 96th Street extension...we really do
not have a basis for a request of r/w for the future secondary arterial. Also, there are
several routing options over several properties (not like we had -For that subdivision out in
West Clay that needed to provide the extension of Meetinghouse Road...they HAD to accommodate
the roadway to align the intersection).
With all that said, I would be happy with formalizing the 101st Street right -of -way if it is
indeed not apparent that this is r /w. I am surprised that there is a street (Cornell Avenue)
off of the "road A 25 -foot half on the north side of the centerline and any quitclaims that
are necessary to vacate the church's interest in this land that has been used as a roadway
-For some time now. I will check with Streets if they maintain this "road
Gary
Original Message
From: Conn, Angelina V
Sent: Wednesday, August 04, 2010 11:14 AM
To: Duncan, Gary R
Cc: Barnes, David R; Redden, Nick; Holmes, Christine B
Subject: RE: Korean Presbyterian Church building addition 1020 East 101st Street
Gary right now it looks to be a "residential street minor" with the 'actual platted road
right of way (50 -ft wide) stopping right at the church parcel's west boundary and then it is
just a paved over sewer easement, and not really a platted street. The thoroughfare plan map
shows a future secondary parkway in the approximate location...this one is tricky! What do
you think?
1
Conn, Angelina V
From: Duncan, Gary R
Sent: Tuesday, August 03, 2010 4:49 PM
To: Conn, Angelina V
Cc: Barnes, David R; Redden, Nick
Subject: FW: Korean Presbyterian Church building addition 1020 East 101st Street
Angie,
I believe this is outside of Engineering jurisdiction, but know that we still have planning
and zoning jurisdiction. Please let us know if you need input from us on the questions raised
my Adam below. Would be happy to help.
Thanks so much,
Gary
Original Message
From: Adam DeHart [mailto:adehart @keelerwebb.com]
Sent: Friday, July 09, 2010 11:07 AM
To: Duncan, Gary R
Subject: RE: Korean Presbyterian Church building addition 1020 East 101st Street
You will be receiving a TAC submittal later this morning /afternoon.
Adam
Original Message
From: Duncan, Gary R [mailto:gduncan @carmel.in.gov]
Sent: Friday, July 09, 2010 10:56 AM
To: Adam DeHart
Subject: RE: Korean Presbyterian Church building addition 1020 East 101st Street
Adam...I gave to admit I have no idea where this is...what is the address?
Is it in the city or homeplace?
Adam DeHart <adehartOakeelerwebb.com> wrote:
My confusion was trying to find section 2.09 in the Thoroughfare Plan.
Apparently section 2.09 is in the zoning ordinance.
See the attached.
The Korean church property does not appear to match up with the irregular line for the
proposed secondary arterial south of 101st street. What is Carmel going to want from the
church for the Special Use approval?
Additionally, there is no dedicated right -of -way to the City of Carmel for the portion of
101st Street along the south side of the church property.
1
Construction /Stormwater Pollution Prevention Plan
Technical Review and Comment (Form 1)
Project Name: 'Korean Presbyterian Church Addition County: 'Hamilton
Plan Submittal Date: 1 7/9/10 1 1 Hydrologic Unit Code:
Project Location Description: 11020 E 101st Street Carmel In
Latitude Longitude of point of discharge:
Civil Township: 'Clay 'Quarter: sw ISection: I 12 ITownship:I 17n IRange:1 3e
a Project Owner Name: I
Contact:
Address:
City: I I State: 1 I Zip: I
Phone: 1 I FAX: I I E -Mail: I
a Plan Preparer Name: 'Adam Dehart
Affiliation: I Keller -Webb
Address: 1486 Gradle Dr
City: 'Carmel I State: I IN I Zip: 146032
Phone: I 574 -0140 I FAX: I 574 -1269 I E -Mail: Iadehart(a�kellerwebb.com
Review Date:107 /16/10
Principal Plan Reviewer: 'Robert Thompson, RLA
Agency: Hamilton County Surveyor's Office
pG Address: 1 Hamilton County Sq. #188
I City: 'Noblesville 'State: IIN I Zip: 146060
a Phone: I 776 -8495 I FAX: I 776 -9628 I E -Mail: Irobert. tompson(a_hamiltoncountv.in.aov
Assisted By: I
Id PLAN IS ADEQUATE: A comprehensive plan review has been completed and it has been determined that the
plan satisfies the minimum requirements and intent of 327 IAC 15 -5.
0 Please refer to additional information included on the following page(s). 4
Do Not Submit Notice of Intent (NOI): This project will not need a Rule 5 Permit as it disturbs 1 ac ofsoil.
Erosion and Sediment control still must be implemented
A preliminary plan review has been completed; a comprehensive review will not be completed within the 28 -day
review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and
revisions to the plan may be required at that time to address deficiencies.
Please refer to additional information included on the following page(s).
Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NOI. A copy of the NOI must also be sent to the HCSO.
PLAN IS DEFICIENT: Significant deficiencies were identified during the plan review.
Please refer to additional information included on the following page(s). 4
DO NOT file a Notice of Intent for this project.
DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re-
submitted, and notification has been received that the minimum requirements have been satisfied.
Plan Revisions Deficient Items should be mailed or delivered to the Principal Plan Reviewer identified
in the Plan Review Section above.
Hamilton County Surveyor 7/16/2010 1
Construction /Stormwater Pollution Prevention Plan Technical Review and Comment (Form 1)
Project Name: Korean Presbyterian Church Addition
Date Reviewed: 07/09/10
The technical review and comments are intended to evaluate the completeness of the Construction /Stormwater Pollution
Prevention Plan for the project. The Plan submitted was not reviewed for the adequacy of the engineering design. All
measures included in the plan, as well as those recommended in the comments should be evaluated as to their feasibility
by a quaked individual with structural measures designed by a qualified engineer. The Plan has not been reviewed
for other local, state, or federal permits that may be required to proceed with this project. Additional information,
including design calculations may be requested to further evaluate the Plan.
All proposed stormwater pollution prevention measures and those referenced in this review must meet the design criteria
and standards set forth in the "Indiana Stormwater Quality Manual" from the Indiana Department of Natural
Resources, Division of Soil Conservation as well as the Hamilton County Stormwater Design Manual.
Please direct questions and /or comments regarding this plan review to:
Robert Thompson, RLA
Please refer to the address and contact information identified in the Plan Review Section on page 1.
Assessment of Construction Plan Elements (Section A)
The Construction Plan Elements are adequately represented to complete a plan review:
0 Yes No
The items checked below are deficient and require submittal to meet the requirements of the rule.
A A
1 Index showing locations of required Plan Elements
2 11 by 17 inch plat showing building lot
numbers /boundaries and road layout /names
Narrative describing the nature and purpose of the
3 4 Vicinity map showing project location
project
5 Legal Description of the Project Site 6 Location of all lots and proposed site
(Include Latitude and Longitude NOI Requirement) improvements (roads, utilities, structures, etc.)
Notation of any State or Federal water quality
7 Hydrologic unit code (14 Digit) 8
permits
Specific points where stormwater discharge will leave Location and name of all wetlands, lakes and
9 the site 10 water courses on and adjacent to the site
Identification of potential discharges to ground
11 Identification of all receiving waters 12 water (abandoned wells, sinkholes, etc.)
Pre construction and post construction estimate of
13 100 year floodplains, floodways, and floodway fringes 14
Peak Discharge (10 Year storm event)
Locations and approximate boundaries of all
15 Adjacent landuse, including upstream watershed 16 disturbed areas (Construction Limits)
Soils map including soil descriptions and
17 Identification of existing vegetative cover 18 limitations
Locations, size and dimensions of proposed stormwater Plans for any off -site construction activities
19 systems (e.g. pipes, swales and channels) L.1 20 associated with this project (sewer /water tie -ins)
21 Locations of proposed soil stockpiles and/or 22 Existing site topography at an interval appropriate
borrow /disposal areas to indicate drainage patterns
El 23 Proposed final topography at an interval appropriate to 24 Name, contact info, and qualifications of the
indicate drainage patterns individual in charge of SWPPP inplementation*
Note #24 is required.
Hamilton County Surveyor 7/16/2010 2
Construction /Stormwater Pollution Prevention Plan Technical Review and Comment (Form 1)
Project Name: Korean Presbyterian Church Addition
Date Reviewed: 07/09/10
Assessment of Stormwater Pollution Prevention Plan (Sections B C)
Stormwater Pollution Prevention Plan Construction Component (Section B)
The construction component of the Stormwater Pollution Prevention Plan includes stormwater quality
measures to address erosion, sedimentation, and other pollutants associated with land disturbance and
construction activities. Proper implementation of the plan and inspections of the construction site are
ci> necessary to minimize the discharge of pollutants. The Project Site Owner should be aware that
unforeseen construction activities and weather conditions may affect the performance of a practice or the
E effectiveness of the plan. The plan must be aflexible document, with provisions to modify or substitute
d q z co
B practices as necessary.
0 1 Description of potential pollutant sources associated with construction activities
2 Sequence describing stormwater quality measure implementation relative to land disturbing
activities
IT 3 Stable construction entrance locations and specifications (at all points of ingress and egress)
O 4 Sediment control measures for sheet flow areas
0 5 Sediment control measures for concentrated flow areas
0 6 Storm sewer inlet protection measure locations and specifications
0 7 Runoff control measures (e.g. diversions, rock check dams, slope drains, etc
0 8 Storm water outlet protection specifications
0 9 Grade stabilization structure locations and specifications
0 10 Location, dimensions, specifications, and construction details of each stormwater quality measure
O 0 11 Temporary surface stabilization methods appropriate for each season (include sequencing)
O 0 12 Permanent surface stabilization specifications (include sequencing)
O 0 13 Material handling and spill prevention plan
O 14 Monitoring and maintenance guidelines for each proposed stormwater quality measure
0 15 Erosion sediment control specifications for individual building lots
Stormwater Pollution Prevention Plan Post Construction Component (Section C)
v The post construction component of the Stormwater Pollution Prevention Plan includes the
u implementation of stormwater quality measures to address pollutants that will be associated with the
ea final landuse. Post construction stormwater quality measures should be functional upon completion of
Q the project. Long term functionality of the measures are critical to their performance and should be
cia
d C C monitored and maintained. See the Hamilton County Stormwater Design Manual for guidance.
O 1 Description of pollutants and their sources associated with the proposed land use
O 2 Sequence describing stormwater quality measure implementation
O 3 Description of proposed post construction stormwater quality measures
(Include a written description of how these measures will reduce discharge of pollutants)
O 4 Location, dimensions, specifications, and construction details of each stormwater quality measure
O 5 Description of maintenance guidelines for post construction stormwater quality measures
Hamilton County Surveyor 7/16/2010 3
Construction/Stormwater Pollution Prevention Plan Technical Review and Comment
Project Name: Korean Presbyterian Church Addition
Date Reviewed: 07/09/10
1. Sheet C4 -EC Notes: This project is under the County Stormwater and IDDE ordinance not Carmel's- please revise.
Add our contact info for Stormwater on cover- not John Thomas
2. Concrete washout must be lined for all projects in Hamilton county and is mandated by EPA please revise detail on
sheet C$
3, This project is in unincorporated Hamilton County
1, 4 4
1,
a
ry
w
f 'n
t~t y
f f
These comments reflect only the SWPPP ando d not add plan reyie agenc
Hamilton County Surveyor 7/16/2010 4