Loading...
HomeMy WebLinkAbout188771 08/18/2010 CITY OF CARMEL, INDIANA VENDOR: 068025 Page 1 of 1 ONE CIVIC SQUARE CROSSROAD ENGINEERS, PC CHECK AMOUNT: $119,464.85 CARMEL, INDIANA 46032 3417 S SHERMAN DR BEECH GROVE IN 46107 CHECK NUMBER: 188771 CHECK DATE: 8/1812010 DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION 206 4340100 27437 10215 3,095.00 ASA #11 -ON CALL REVIE 1205 4462862 10341 1,629.00 HAZEL DELL ROAD IMPRO 1205 R4462862 21816 10341 1,629.00 CONST INSP -HAZEL DELL 206 4340100 21824 10450 13,500.00 HAVERSTICE DRAINAGE I 206 4340100 21791 10456 6,056.40 HAVERSTICK DRAINAGE P 206 R4340100 21791 10456 693.60 HAVERSTICK DRAINAGE P 206 4340100 27437 10461 8,264.88 ASA #11 -ON CALL REVIE .1205 R4462862 21816 10465 59,532.86 CONST INSP -HAZEL DELL 202 4340100 21808 10466 25,393.36 HAZEL DELL ARPA PROJE 2200 4340100 21793A 10468 1,595.00 ON CALL CONSULTING 202 R4340100 15034 1047 442.50 ADDL 64 /MISC PROJECT 2200 4350900 21786 10533 891.25 126 AUMAN ENG /ROW A Cross Road Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 317 780 -1555 City of Carmel Invoice number 10465 Michael McBride, City Engineer Date 08/05/2010 1 Civic Square Page number 1 Carmel, IN 46032 Project: HAZEL DELL PARKWAY IMPROVEMENTS For services performed June 26 through July 30, 2010 PROMPT PAYMENT OF INVOICE IS APPRECIATED!! These services were provided in accordance with our contract #03.03.10.03 approved March 3, 2010 and Additional Services 9 PO #21816 Local Inspection Professional Fees Billed Hours Rate Amount Director 28.50 125.00 3,562.50 Resident Project Engineer 259.00 95.00 24,605.00 Assistant Project Inspector 491.50 60.00 29,490.00 Reimbursables Billed Units Rate Amount Miles 3,907.00 0.48 1,875.36 Phase subtotal 59,532.86 total 59,532.86 Invoice total 59,532.86 Tk C City of Carmel Invoice number: 10465 Invoice date: 08/0512010 Cross Road Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 317 -780 -1555 City of Carmel Invoice number 10461 Michael McBride, City Engineer Date 08105/2010 1 Civic Square Page number 1 of 4 Carmel, IN 46032 Project: CITY OF CARMEL ON CALL PLAN REVIEW For services performed June 26 through July 30, 2010 PROMPT PAYMENT OF INVOICE IS APPRECIATED!! These services were provided in accordance with our contract #0319.97.02 dated March 19, 1997 including the Additional Services Amendment #11 P.O. #27437: General Plan Review Professional Fees Billed Hours Rate Amount Senior Project Manager 7.00 115.00 805.00 Phase subtotal 805.00 total 805.00 Indiana Spine Group Professional Fees Billed Hours Rate Amount Senior Project Manager 0.50 115.00 57.50 Project Engineer 10.50 85.00 892.50 Phase subtotal 950.00 total 950.00 Inglenook Subdivision Professional Fees Billed Hours Rate Amount Senior Project Manager 6.00 115.00 690.00 Project Engineer 27.00 85.00 2,295.00 Reimbursables Billed Units Rate Amount City of Carmel Invoice number: 10461 Invoice date: 08/05/2010 City of Carmel Invoice number 10461 Date 08/05/2010 Page number 2 of 4 Project: CITY OF CARMEL ON CALL PLAN REVIEW (Continued) Inglenook Subdivision Reimbursables Billed Units Rate Amount Miles 156.00 0.48 74.88 Phase subtotal 3,059.88 total 3,059.88 Livingstone Cottages Professional Fees Billed Hours Rate Amount Senior Project Manager 0.50 115.00 57.50 Project Engineer 4.00 85.00 340.00 Phase subtotal 397.50 total 397.50 Midwest ISO Expansion 2010 Professional Fees Billed Hours Rate Amount Senior Project Manager 0.50 115.00 57.50 Project Engineer 6.00 85.00 510.00 Phase subtotal 567.50 total 567.50 Coxhall Mansion and Parking Lot Professional Fees Billed Hours Rate Amount Senior Project Manager 1.00 115.00 115.00 Project Engineer 7.50 85.00 637.50 Phase subtotal 752.50 total 752.50 Turkey Hill Minit Market Professional Fees City of Carmel Invoice number: 10461 Invoice date: 08/05/2010 City of Carmel Invoice number 10461 Date 08/05/2010 Page number 3 of 4 Project: CITY OF CARMEL ON CALL PLAN REVIEW (Continued) Turkey Hill Minit Market Professional Fees Billed Hours Rate Amount Senior Project Manager 2.00 115.00 230.00 Project Engineer 9.00 85.00 765.00 Phase subtotal 995.00 total 995.00 Village at Mount Carmel Section 11 Professional Fees Billed Hours Rate Amount Project Engineer 1.00 85.00 85.00 Phase subtotal 85.00 total 85.00 116th Centre Apartments Professional Fees Billed Hours Rate Amount Senior Project Manager 0.50 115.00 57.50 Project Engineer 6.50 85.00 552.50 Phase subtotal 610.00 total 610.00 Matthew 25 Center Professional Fees Billed Hours Rate Amount Project Engineer 0.50 85.00 42.50 Phase subtotal 42.50 total 42.50 Invoice total 8,264.88 City of Carmel Invoice number: 10461 Invoice date: 08/05/2010 City of Carmel Invoice number 10461 Date 08105/2010 Page number 4 of 4 Project: CITY OF CARMEL ON CALL PLAN REVIEW Thank u! 4 Ch Ch rl P. President City of Carmel Invoice number: 10461 Invoice date: 08105/2010 m s'; ms W1,7 Cross Road Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 317 -780 -1 555 City of Carmel Invoice number 10215 Michael McBride, City Engineer Date 05/0512010 1 Civic Square Page number 1 of 3 Carmel, IN 46032 Project: CITY OF CARMEL ON CALL PLAN REVIEW For services performed March 27 through April 30, 2010 PROMPT PAYME O F INV I APPRECIATED!! These services were provided in accordance with our contract approved March 19, 1997 including Additional Services #104, Supplemental P.O. #15048 Turkey Hill Minit Market Professional Fees Billed Hours Rate Amount Project Engineer 5.50 85.00 467.50 Phase subtotal 467.50 total 467.50 General Plan Review Professional Fees Billed Hours Rate Amount Senior Project Manager 2.00 115.00 230.00 Phase subtotal 230.00 total 230.00 Hazel Dell Christian Church Children's Ministry Expansion Professional Fees Billed Hours Rate Amount Project Engineer 0.50 85.00 42.50 Phase subtotal 42.50 total 42.50 ITT Building Expansion Professional Fees City of Carmel Invoice number: 10215 Invoice date: 05/0512010 City of Carmel Invoice number 10215 Date 05/05/2010 Page number 2 of 3 Project: CITY OF CARMEL ON CALL PLAN REVIEW (Continued) ITT Building Expansion Professional Fees Billed Hours Rate Amount Project Engineer 1.00 85.00 85.00 Phase subtotal 85.00 total 85.00 Inglenook Subdivision Professional Fees Billed Hours Rate Amount Senior Project Manager 1.00 115.00 115.00 Project Engineer 9.00 85.00 765.00 Phase subtotal 880.00 total 880.00 Midwest ISO Expansion 2010 Professional Fees Billed Hours Rate Amount Project Engineer 5.00 85.00 425.00 Phase subtotal 425.00 total 425.00 Dreyer Reinbolt Racing Expansion Professional Fees Billed Hours Rate Amount Project Engineer 3.00 85.00 255.00 Phase subtotal 255.00 total 255.00 Coxhall Mansion and Parking Lot Professional Fees Billed Hours Rate Amount Senior Project Manager 1.00 115.00 115.00 Project Engineer 7.00 85.00 595.00 City of Carmel Invoice number: 10215 Invoice date: 05/05/2010 City of Carmel Invoice number 10215 Date 05/05/2010 Page number 3 of 3 Project: CITY OF CARMEL ON CALL PLAN REVIEW (Continued) Phase subtotal 710.00 total 710.00 Invoice total 3,095.00 Tha u! Chip h s, P. President f City of Carmel Invoice number: 10215 Invoice date: 05/05/2010 PO CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 317 -780 -1555 City of Carmel Invoice number 10456 Gary Duncan Date 08/05/2010 One Civic Square Page number 1 of 2 Carmel, IN 46032 Project: HAVERSTICK DRAINAGE IMPROVEMENTS �0R3, 10 20 Zeko 1 For services performed June 26 through July 30, 2010 p� PR PAYMENT O F INV I APPRE 2D11 These services were provided in accordance with our contract #03.03.10.03 approved March 3, 2010 and Additional Services #3: P.O. #21791 Haverstick Coachman Survey Amount Contract Amount 5,500.00 Percent Complete 100.00 Total Billed 5,500.00 Current Billed 0.00 Haverstick Coachman Design Permitting Amount Contract Amount 12,500.00 Percent Complete 80.00 Total Billed 10,000.00 Current Billed 3,750.00 Haverstick Coachman Bidding Amount Contract Amount 2,000.00 Percent Complete 0.00 Total Billed 0.00 Current Billed 0.00 Haverstick Coachman Construction Administration Amount Contract Amount 4,000.00 Percent Complete 0.00 Total Billed 0.00 Current Billed 0.00 Lexington Lane Survey Amount Contract Amount 2,000.00 Percent Complete 100.00 Total Billed 2,000.00 Current Billed 0.00 Lexington Lane Design Permitting Amount Contract Amount 5,000.00 Percent Complete 80.00 Total Billed 4,000.00 Current Billed 1,500.00 City of Carmel Invoice number: 10456 Invoice date: 08/05/2010 City of Carmel Invoice number 10456 Date 08/05/2010 Page number 2 of 2 Project: HAVERSTICK DRAINAGE IMPROVEMENTS Lexington Lane Bidding Amount Contract Amount 1,000.00 Percent Complete 0.00 Total Billed 0.00 Current Billed 0.00 .Lexington Lane Construction Adminstration Amount Contract Amount 2,500.00 Percent Complete 0.00 Total Billed 0.00 Current Billed 0.00 106th St at 106th Place Survey Amount Contract Amount 2,000.00 Percent Complete 100.00 Total Billed 2,000.00 Current Billed 0.00 106th St at 106th Place Design Permitting Amount Contract Amount 5,000.00 Percent Complete 80.00 Total Billed 4,000.00 Current Billed 1,500.00 106th St at 106th Place Bidding Amount Contract Amount 1,000.00 Percent Complete 0.00 Total Billed 0.00 Current Billed 0.00 106th St at 106th Place Construction Administration Amount Contract Amount 2,500.00 Percent Complete 0.00 Total Billed 0.00 Current Billed 0.00 Total 6,750.00 Invoice total 6,750.00 Than u! c C� Carl President City of Carmel Invoice number: 10456 Invoice date: 08/05/2010 t n t CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 317- 780 -1555 City of Carmel Invoice number 10450 Gary Duncan Date 08/05/2010 One Civic Square Page number 1 of 2 Carmel, IN 46032 Project: HAVERSTICK DRAINAGE IMPROVEMENTS O le For services performed June 26 through July 30, 2010 PROMPT PAYMENT OF INVOICE IS APPRECIATED!! These services were provided in accordance with our contract #0319.97.02 dated March 19, 1997 including the Additional Services Amendment #10 P.O. #21824: Lakeshore Drive East Lakeview Drive Survey Amount Contract Amount 2,000.00 Percent Complete 100.00 Total Billed 2,000.00 Current Billed 2,000.00 Lakeshore Drive East Lakeview Drive Design/Permitting Amount Contract Amount 5,000.00 Percent Complete 50.00 Total Billed 2,500.00 Current Billed 2,500.00 Lakeshore Drive East Lakeview Drive Bidding Amount Contract Amount 1,000.00 Percent Complete 0.00 Total Billed 0.00 Current Billed 0.00 Lakeshore Drive East Lakeview Drive Construction Admin. Amount Contract Amount 2,500.00 Percent Complete 0.00 Total Billed 0.00 Current Billed 0.00 Stratford Place N. of 106th Street Survey Amount Contract Amount 2,000.00 Percent Complete 100.00 Total Billed 2,000.00 Current Billed 2,000.00 Stratford Place N. of 106th Street Design/Permitting Amount Contract Amount 5,000.00 Percent Complete 50.00 Total Billed 2,500.00 Current Billed 2,500.00 Stratford Place N. of 106th Street Bidding Amount Contract Amount 1,000.00 Percent Complete 0.00 Total Billed 0.00 Current Billed 0.00 City of Carmel Invoice number: 10450 Invoice date: 08/05/2010 City of Carmel Invoice number 10450 Date 08/05/2010 Page number 2 of 2 Project: HAVERSTICK DRAINAGE IMPROVEMENTS Stratford Place N. of 106th Street Construction Admin. Amount Contract Amount 2,500.00 Percent Complete 0.00 Total Billed 0.00 Current Billed 0.00 106th Place N. of 106th Street Survey Amount Contract Amount 2,000.00 Percent Complete 100.00 Total Billed 2,000.00 Current Billed 2,000.00 106th Place N. of 106th Street Design /Permitting Amount Contract Amount 5,000.00 Percent Complete 50.00 Total Billed 2,500.00 Current Billed 2,500.00 106th Place N. of 106th Street Bidding Amount Contract Amount 1,000.00 Percent Complete 0.00 Total Billed 0.00 Current Billed 0.00 106th Place N. of 106th Street Construction Admin. Amount Contract Amount 2,500.00 Percent Complete 0.00 Total Billed 0.00 Current Billed 0.00 Total 13,500.00 Invoice total 13,500.00 Thank Y C Ch rl President City of Carmel Invoice number: 10450 Invoice date: 08/05/2010 CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 317- 780 -1555 City of Carmel Invoice number 10466 Michael McBride, City Engineer Date 08/05/2010 1 Civic Square Page number 1 Carmel, IN 46032 Project: HAZEL DELL PARKWAY IMPROVEMENTS For services performed June 26 through July 30, 2010 PROMPT PAYMENT OF INVOICE IS APPRECIATED!! These services were provided in accordance with our LPA- Consulting contract dated March 17, 2010: Des No.: 0901163 1. 12 02; ARRA Inspection Professional Fees Billed Hours Rate Amount Director 52.50 143.76 7,547.40 Project Manager 15.50 81.58 1,264.49 CADD Technician 5.00 61.82 309.10 Assistant Project Inspector 176.50 39.93 7,047.65 Resident Project Representative 144.00 61.98 8,925.12 Reimbursables Billed Units Rate Amount Miles 749.00 0.40 299.60 Phase subtotal 25,393.36 total 25,393.36 Invoice total 25,393.36 Th ou! k. 1 r p Char e President City of Carmel Invoice number: 10466 Invoice date 08/05/2010 Hazel Dell Parkway Improvements ARRA'Inspection Date Range from: 6/26/2010 to 7/34/2010 Work In Pr ogress Employee /Activity Total Billed WIP Total Billable Deferred Hold Non Billable Writeoff Andrew J. Wolf 138.50 138.50 Billable Time 138.50 138.50 Date Total Billed WIP Total Billable Deferred Hold Non Billable Writeoff 71112010 5.50 5.50 7/2/2010 6.00 6.00 7/5/2010 1.00 1.00 7/6/2010 6.00 6.00 7/7/2010 7.50 7.50 7/8/2010 6.00 6.00 7/9/2010 6.00 6.00 7/10/2010 6.00 6.00 7/12/2010 6.00 6.00 7/13/2010 6.50 6.50 7/14/2010 6.00 6.00 7/1512010 7.00 7.00 7/16/2010 6.00 6.00 7/19/2010 5.50 5.50 7/20/2010 7.00 7.00 7/21/2010 7.00 7.00 7/22/2010 6.00 6.00 7/23/2010 5.50 5.50 7/24/2010 2.00 2.00 7/26/2010 5.50 5.50 7/27/2010 6.50 6.50 7/28/2010 6.00 6.00 7/29/2010 6.00 6.00 7/30/2010 6.00 6.00 Brad J. Eckerle 7.00 7.00 Billable Time 7.00 7.00 D ate Total Billed WIP Total Billab Deferred Hold Non Billable Writ eoff 6/29/2010 1.50 1.50 7/20/2010 1.50 1.50 7121/2010 1.00 1.00 7/26/2010 1.00 1.00 Hazel Dell Parkway Improvements ARRA Inspection Date Range from: 6/26/2010 to 7/30/2010 Work In Progress Em T Billed WIPTotal Billable D eferred Hold Non Billable Writeoff 7/30/2010 2.00 2.00 Christopher A. Wright 5.00 5.00 Billable Time 5.00 5.00 Dat Total Billed WIPTotal Bill Deferred Hold Non Billable Writeoff PVMT MARKING SHEETS 7/27/2010 5.00 5.00 Jay J. Vorisek 22.00 22.00 Billable Time 22.00 22.00 Date Total Billed WIP Total Bill Defer Hold Non Billable Writeoff 6/30/2010 10.00 10.00 7/1/2010 8.00 8.00 7/20/2010 4.00 4.00 Nicholas LaGuardia 176.50 176.50 Billable Time 176.50 176.50 Date Total Billed WIPTotal Billable Deferred Hold Non Billable Writeoff 7/2/2010 8.00 8.00 7/2/2010 2.00 2.00 7/6/2010 10.00 10.00 7/7/2010 13.00 13.00 7/8/2010 11.00 11.00 7/14/2010 12.00 12.00 7/15/2010 11.00 11.00 7/16/2010 10.00 10.00 7/17/2010 8.00 8.00 7/17/2010 2.50 2.50 7/19/2010 11.50 11.50 7/19/2010 1.50 1.50 7/20/2010 10.50 10.50 7/21 /2010 10.00 10.00 7/24/2010 3.00 3.00 7/26/2010 8.00 8.00 7/26/2010 4.00 4.00 7/27/2010 8.00 8.00 7/27/2010 2.00 2.00 7128/2010 8.00 8.00 Hazel Dell Parkway Improvements ARRA Inspection Date Range from: 6/2 612 01 0 to 713012010 Work In Progr Employee /Activity Total Billed WIP Total Billable Deferred Hold Non Billable Writeoff 7/28/2010 2.50 2.50 7/29/2010 8.00 8.00 7/29/2010 3.00 3.00 7/30/2010 8.00 8.00 7/30/2010 1.00 1.00 Todd R. Bennett 14.00 14.00 Billable Time 14.00 14.00 Date Total Billed WIP Total Bi Deferred Hold Non Billable Writeoff 7/112010 3.50 3.50 7/2/2010 8 -00 8.00 7/512010 2 -50 2 -50 Trent E. Newport 30.50 30.50 Billable Time 30.50 30.50 Date Total Billed WIP Total Billable Deferred Hold Non Billable Writeoff 6/2812010 1.00 1.00 6/2912010 2 -00 2.00 6/30/2010 1.00 1.00 7/1/2010 1.00 1.00 7/6/2010 2.00 2.00 7/7/2010 2.00 2.00 7/812010 1.00 1.00 7/912010 0.50 0.50 7/12/2010 1.00 1.00 7/13/2010 1.00 1.00 7/14/2010 1 -00 1.00 7/15/2010 1.00 1.00 7/2412010 8 -00 8.00 7/26/2010 2 -00 2 -00 7/27/2010 2 -00 2 -00 7/28/2010 2 -00 2.00 7/29/2010 2 -00 2 -00 Total 393.50 393.50 H azel Dell ARRA A RRA I nspection 749.00 299.60 07/03/10 Hazel Dell Parkway Improvements Mileage 23.00 9.20 07/06/10 Hazel Deli Parkway Improvements Mileage 27.00 10.80 07/06/10 Hazel Dell Parkway Improvements Mileage 67.00 26.80 07/07/10 Haze Dell Parkway Improvements Mileage 55.00 22.00 07/08/10 Hazel Dell Parkway Improvements Mileage 50.00 20.00 07/09/10 Hazel Dell Parkway Improvements Mileage 54.00 21.60 07110110 Hazel Dell Parkway Improvements Mileage 10.00 4.00 07/12/1 Hazel D ell Parkway Improveme Mileage 10.00 4.00 07/13/10 Hazel Dell Parkway Improvements. Mileage 10.00 4.00 07/14/10 Hazel Dell Parkway Improvements Mileage 10.00 4.00 07/15/10 Hazel Dell Parkway Improvements Mileage 10.00 4.00 07/16/10 Hazel D ell Par kway Improvements Mileage 10.00 4.00 07/17/10 Hazel Dell Parkway Improvements Mileage 25.00 10.00 07/19/10 Hazel Dell Parkway Improvements Mileage 31.00 12.40 07119110 Hazel Dell Parkway Improvements Mileage 5.00 2.00 07120110 Hazel Dell Parkway Improvements Mileage 42.00 16.80 07120110 Hazel Dell Parkway Improvements Mileage 10.00 4.00 07121110 Hazel Dell Parkway Improvements Mileage 10.00 4.00 07/21/10 Hazel Dell Parkway Improvements Mileage 40.00 v 16.00 07122110 Hazel Dell Parkway Improvements Mileage 10.00 4.00 07/23/10 Hazel Dell Parkway Improvements Mileage 10.00 4.00 07/24/10 Hazel Dell Parkway Improvements Mileage 10.00 4.00 07/26/10 Hazel Dell Parkway Improvements Mileage 10.00 4.00 07/2 Hazel Dell Park Improvements Mileage 39.00 15 .60 07127110 Hazel Dell Parkway Improvements Mileage 36.00 14.40 07/27/10 Hazel Dell Parkway Improvements Mileage 10 .00 4.00 07128110 Hazel Dell Parkway Improvements Mileage 33.00 13.20 07 Haze Dell Parkway Improvements Mileage 1 0.00 4.00 07/29/10 Hazel Dell Parkway Improvements Mileage 10.00 s 4.00 07/29/10 Hazel Dell Pa Improvements Mileag A 40. 16.0 07/30/10 Hazel Dell Parkway Improvements Mileage 22.00__ 8.80 07130110 Hazel Dell Parkway Improvements Mileage 10.00 4.00 749.00 299.60 a CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 317- 780 -1555 City of Carmel Invoice number 10533 Michael McBride, City Engineer Date 08/05/2010 1 Civic Square Page number 1 of 2 Carmel, IN 46032 Project: 126TH /NAPPANEE /OSWEGO WALK PROJECT For services performed June 26 through July 30, 2010 PR PAYMENT OF INV I APPRECIATED!! These services were provided in accordance with our contract #03.03.10.03 approved March 3, 2010 and Additional Service Amendment #1, PA. #21786. Exhibit Drawing Units Amount Contract Amount 1.00 400.00 Percent Complete 100.00 Total Billed 1.00 400.00 Current Billed 0.00 0.00 Legal Descriptions Units Amount Contract Amount 2.00 900.00 Percent Complete 100.00 Total Billed 2.00 900.00 Current Billed 0.00 0.00 R1W Staking Units Amount Contract Amount 1.00 400.00 Percent Complete 100.00 Total Billed 1.00 400.00 Current Billed 0.00 0.00 Document Recordation Units Amount Contract Amount 1.00 50.00 Percent Complete 0.00 Total Billed 0.00 0.00 Current Billed 0.00 0.00 Total 0.00 Buying Consultant Billed Units Rate Amount Associated Right of Way Services 1.00 172.50 172.50 Doc Prep Larsen 0.50 1,437.50 718.75 50% Buying- Larsen Phase subtotal 891.25 total 891.25 City of Carmel Invoice number: 10533 Invoice date: 08/05/2010 City of Carmel Invoice number 10533 Date 08/05/2010 Page number 2 of 2 Project: 126TH /NAPPANEE /OSWEGO WALK PROJECT Invoice total 891.25 As City of Carmel Invoice number: 10533 Invoice date: 08/05/2010 Associated Right o -Way Services Inc. INVOICE NO. 10 -045 INVOICE STATEMENT OF PROFESSIONAL SERVICES DATE: July 9, 2010 TO: CrossRoad Engineers, PC Mrs. Jill Newport 3417 S. Sherman Drive Beech Grove, IN 46107 SERVICES: Document Preparation and Buying/ Negotiations PROJECT: Auman Newark Neighborhood Improvements: Phase 1 126 Street Sidewalk Drainage Improvements Carmel, IN PARCEL: See Attached Exhibit "A" Document Preparation: $150.00 Buying/Negotiations: 625.00 TOTAL INVOICE AMOUNT: 5775,00 Associated Right -of -Way Services, Inc. Federal I.D. 351966008 �XW BY: Lawrence M. Ballantyne President 1311 N. Arlington Avenue, Suite 209 Indianapolis, Indiana 46219 Phone: (317) 322 -0489 DOCUMENT PREPARATION Parcels: 1 (Larsen) (1 parcel $150.00 ea. $150.00) $150.00 TOTAL $150.00 BUYING NEGOTIATIONS 1 Larsen ($1,250.00 initial 50% $625.00) $625.00 TOTAL $625.00 CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 317 -780 -1555 City of Carmel Invoice number 10468 Michael McBride, City Engineer Date 08/05/2010 1 Civic Square Page number 1 of 2 Carmel, IN 46032 Project: CITY OF CARMEL ON CALL CONSULTING SERVICES For services performed June 26 through July 30, 2010 PROMPT PAYMENT OF INV OICE IS APPRECIATED!! These services were provided in accordance with our contract #03.03.10.03 approved March 3, 2010 and Additional Services #4: P O #21793 Monon Ditch Culvert Estimates Professional Fees Billed Hours Rate Amount Project Engineer 0.50 85.00 42.50 Phase subtotal 42.50 total 42.50 111th and Monon Walk connection Professional Fees Billed Hours Rate Amount Director 0.50 125.00 62.50 CADD Technician 4.00 70.00 280.00 Survey Manager 1.00 95.00 95.00 Crew Chief 4.00 80.00 320.00 Field Man 4.00 60.00 240.00 Phase subtotal 997.50 total 997.50 Southwest Old Town Redevelopment Right -of -Way Professional Fees Billed Hours Rate Amount CADD Technician 1.00 70.00 70.00 Phase subtotal 70.00 City of Carmel Invoice number: 10468 Invoice date: 08/05/2010 I City of Carmel Invoice number 10468 Date 08/05/2010 Page number 2 of 2 Project: CITY OF CARMEL ON CALL CONSULTING SERVICES tota 1 70.00 Monon Farms Left Turn Lane Professional Fees Billed Hours Rate Amount Director 0.50 125.00 62.50 Resident Project Engineer 2.00 95.00 190.00 pre -con and coordination Phase subtotal 252.50 tota 1 252.50 136th Street walk at Carey Road Professional Fees Billed Hours Rate Amount Project Engineer 0.50 85.00 42.50 Phase subtotal 42.50 total 42.50 Altman Pond Design /Permitting Professional Fees Billed Hours Rate Amount Director 0.50 125.00 62.50 Project Engineer 1.50 85.00 127.50 Phase subtotal 190.00 total 190.00 Invoice total 1 Th ou! a Chip Cha P. E. President City of Carmel Invoice number: 10468 Invoice date: 08105/2010 CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 317- 780 -1555 City of Carmel Invoice number 10480 Michael McBride, City Engineer Date 08/05/2010 1 Civic Square Page number 1 Carmel, IN 46032 Project: 106TH STREET PATH KEYSTONE TO WESTFIELD For services performed June 26 through July 30, 2010 PR PAYMENT OF INVOICE IS APPRECIATED!! These services were provided in accordance with our contract #03.03.10.03 approved March 3, 2010 and Additional Services 6: PO #21810: 2 -b 2 1. 9 AI( \�o _Z 0 Inspection Professional Fees Billed Hours Rate Amount Director 4.00 125.00 500.00 Resident Project Engineer 14.00 95.00 1,330.00 Reimbursables Billed Units Rate Amount Miles 53.00 0.48 25.44 Phase subtotal 1,855.44 total 1,855.44 Invoice total 1,855.44 lipCh P E. President City of Carmel Invoice number: 10480 Invoice date: 08/0512010 CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 317 780 -1555 City of Carmel Invoice number 10467 Michael McBride, City Engineer Date 08/05/2010 1 Civic Square Page number 1 Carmel, IN 46032 Project: CITY OF CARMEL MISCELLANEOUS ENGINEERING PROJECT MANAGEMENT For services performed June 26 through July 30, 2010 PR PAYMENT OF INVOIC I APPRE These services were provided in accordance with our contract approved March 19, 1997 including the Additional Services 64C, #124, P.O. #15034: Miscellaneous Engineering Project Management Professional Fees Billed Hours Rate Amount Director 0.50 125.00 62.50 Resident Project Engineer 4.00 95.00 380.00 103rd Superior plan and cost estimate forpavement replacement- Dan Greskamp 103rd and Superior staff mfg. Phase subtotal 442.50 total 442.50 Invoice total 442.50 Thank oul t Chip Charle P. E. President City of Carmel Invoice number: 10467 Invoice date: 08/05/2010 Prescribed by State Board of Accounts City Form No. 201 (Rev. 1995) ACCOUNTS PAYABLE VOUCHER CITY OF CARMEL An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc. Payee Crossroad Engineers Purchase Order No. 3417 S. Sherman Dr. Terms Beech Grove, IN 46107 Date Due Invoice Invoice Description Amount Date Number (or note attached invoice(s) or bill(s)) 08/05/10 10341 Hazel Dell 131st Cherry Tree Inspection $59,532.86 08/05/10 10461 On Call Plan Review $8,264.88 05/05/10 10215 On Call Plan Review $3,095.00 08/05/10 10456 Haverstick Drainage phase 1 $6,750.00 08/05/10 10450 Haverstick Drainage phase II $13,500.00 08/05/10 10466 Hazel Dell ARRA Inspection $25,393.36 08/05/10 10533 126th /Auman ROW Services $891.25 DUOBTf 9 10468 On Call Consulting $1,595.00 isc. Project Management $442.50 To A l I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited same in accordance with IC 5- 11- 10 -1.6. 20 Clerk- Treasurer k VOUCHER NO. WARRANT NO. ALLOWED 20 Crossroad Engineers IN SUM OF 3417 S. Sherman Dr Beech Grove, IN 46107 $119,464.85 ON ACCOUNT OF APPROPRIATION FOR Department of Engineering Board Members PO# or INVOICE NO. ACCT #/TITLE AMOUNT DEPT. I hereby certify that the attached invoice(s), or bill(s) is (are) true and correct and that the materials or services itemized thereon for which charge is made were ordered and 21791 10456 $6,056.40 received except 21824 104SE) $19,566.6 24808 10466 49533 2288 589 -$691.25 10462 2299 491 Cot r-nr--an-- �I b 20 Signature Cost distribution ledger classification if Title claim paid motor vehicle highway fund