HomeMy WebLinkAboutMinutes SpecStdy 02-01-00CARMEL /CLAY PLAN COMMISSION
SPECIAL STUDY COMMITTEE
FEBRUARY 01, 2000
The regularly scheduled meeting of the Special Study Committee met at approximately
7:00 PM on February 1, 2000 in the Caucus Rooms of City Hall, One Civic Square,
Carmel, Indiana.
Members present were: Leo Dierckman; Madeline Fitzgerald; Kevin Kirby; Bob
Modisett; James T. O'Neal, Sr.; Pat Rice; and Paul Spranger. David Cremeans was also
in attendance as an ex- officio member.
Michael Hollibaugh and Terry Jones were present representing the Department of
Community Services. Laurence Lillig joined the Committee in progress.
Paul Spranger was elected Chairperson of the Committee by Unanimous Consent.
The Agenda was re- ordered to hear item 6, Docket No. 46 -00 ADLS Amend, Keystone
Square, Parcel 6, as the second item of business.
Item 1. Docket No. 81 -99 ADLS, Meadowlark Office Park
Petitioner seeks approval to construct three office buildings on 3.46 acres.
The site is located at 698 Pro -Med Lane. The site is zoned B -6 /Business.
This item was continued from the December 7, 1999 Special Study
Committee meeting in order for the petitioner to prepare a revised
Landscape Plan and to file a Developmental Standards Variance petition
for landbanked parking. This petition was further continued from the
January 4, 2000 Special Study Committee in order to give the Department
time to review the revised Landscape Plan.
Filed by Steve Dauby of Dauby O'Conner Zaleski, LLC.
Jennifer D'Orso, attorney, Indianapolis, appeared before the Committee representing the
applicant. The development plan includes three office buildings; the site is close to
Meadowlark Park. A revised landscape plan was presented to the Department at the last
committee meeting. Ms. D'Orso reported that the neighbors' concerns have now been
addressed; the petitioner has also applied for a Variance for permission to land bank the
parking.
In response to questions from the committee, Ms. D'Orso stated that her client will
commit to replacing dead landscaping beginning in the spring, and will also move
forward with the current landscaping plan in the spring, weather permitting. A written
commitment will be provided to the Department and the landscaping will be completed
by the end of April. The landscaping can be broken down into phases.
s:\ Minutes \Commmittees \spst2000feb
An application has been filed with the Board of Zoning Appeals to provide for land
banking additional parking rather than installing a parking lot at the present time.
Michael Hollibaugh stated that the landscape plan was not adequate for the expanded
parking area. The petitioner needs to show plantings in the parking areas and create a
transitional area. The Department will work with the petitioner to be sure that the
commitments are met.
One of the neighbors was in attendance at the meeting and stated that the he had reviewed
the landscape plan. The neighbor had some qualms with wildlife plantings due to the
past level of maintenance and would rather the petitioner use different plantings. Also,
the Austrian Pine is not thought to be a wise choice because of the possibility of blight.
Michael Hollibaugh reported that in his experience with other projects, the Austrian Pines
do very well over all; however, the low area might not be conducive to growth. The
Austrian Pines do much better than other species.
Kevin Kirby suggested a Performance Bond for the landscaping and land banking. Terry
Jones suggested that a dollar figure be determined for the landscaping and that it be
governed by the cost of the planting material. This could be accomplished by a cost
estimate from the petitioner.
Lighting along the path was discussed; Michael Hollibaugh pointed out that as the shade
trees grow, and by shifting some of the trees, the landscaping will meet the objectives and
create a park -like effect. Safety on the path is not an issue (the trails close at dusk).
Leo Dierckman moved for the approval of Docket No. 81 -99 ADLS, Meadowlark
Office Park, contingent upon the submission of a Performance Bond prior to the start of
construction, submission of written commitments from the petitioner regarding
landscaping, and also contingent upon Board of Zoning Appeals approval for land
banking. APPROVED 6 -0.
Item 2. Docket No. 46 -00 ADLS Amend, Keystone Square, Parcel 6
Petitioner seeks approval to change the color of the sign face for Tucker
Carmel Center from white to black. The site is located at 1119 Keystone
Way. The site is zoned B -8 /Business partially within the SR 431 Overlay
Zone.
Filed by Thomas B. Ely of the Sign Group.
Tom Ely, 11428 Clarkston Road, Zionsville appeared before the Committee on behalf of
the applicant. Approval is requested to change the color of the sign face for the Tucker
Carmel Center.
The Tucker Carmel Center was a dark brown, brick building with white lettering on the
signs. At the time Merchants Square was constructed, the Tucker building was painted
white and the existing white lettering does not show due to the fact that there is no
s:\ Minutes \Commmittees \spst2000feb 2
contrast between the lettering and the building. There would be contrast to change the
face of the sign to black and this is being requested. There will be no change in the size
of the sign, the location, or illumination.
Terry Jones explained that the sign proposal is being brought before the Committee rather
than the Department, strictly based on prior experience.
Madeline Fitzgerald reported no problem with the proposed signage, but would like to
have had a chance to review the proposal prior to the meeting.
Bob Modisett moved for the approval of Docket No. 46 -00 ADLS Amend, Keystone
Square, Parcel 6, Tucker Carmel Center. APPROVED 6 -0.
Item 3. Docket No. 98 -99 Z, Kite Rezone
Petitioner seeks approval of a rezone to PUD /Planned Unit Development,
in order to construct two retail buildings on 37.076 acres. The site is
located southeast of East 146 Street and US 31 Overlay Zone and
partially within the SR 431 Overlay Zone.
This item was continued from the January 4, 2000 Special Study
Committee meeting in order to allow the Committee more time for a
thorough review of the proposed PUD Ordinance.
Filed by Paul G. Reis of The Reis Law Firm for Kite Realty.
Paul Reis, attorney, 12258 Hancock Street, Carmel appeared before the Committee
representing the petitioner. There are certain changes proposed in the draft of the PUD
ordinance. Some of these changes refer to the parapet wall, landscaping, up -dated site
plan, right -of -way and maintenance of the wall that will screen the project from the
neighborhood to the east (Danbury Estates.)
Samples of construction materials were displayed for the committee members. The
building is a balance of masonry panels and pre -cast concrete. The building will be
similar to the one in the Glendale area, although the colors will not be the same. The
proposed commitments regarding the real estate are a part of the ordinance.
The petitioner is working with the neighbors to the east who are suggesting an 8 foot wall
with a landscaped, berm area. Dave Rushing, president of the Danbury Estates
Homeowners, reported that the neighbors are generally in favor of the wall with the berm,
or some kind of low maintenance buffer.
Terry Jones commented that the wall is shown within the right -of -way of 146 Street;
and it is yet to be determined who would assume responsibility for maintenance of the
wall. The cul -de -sac lots within Danbury Estates and those lots to be purchased by the
County have yet to be finalized and could affect the project.
Paul Reis stated that he has met with the County. One home is in the middle of right -of-
way. The County is supportive of the petitioner's project and will be constructing two
s:\ Minutes \Commmittees \spst2000feb
ramps, off ramp and on ramp to US 31, through TIF dollars. Hamilton County is
reluctant to release the project until they know the proposed project is moving along. The
drawing in the packets incorrectly showed the wall as being in the right -of -way. The wall
will not be in the right -of -way and will be maintained by either the developer or the
Home Owner's Association. The County is prepared to sign a contract with American
Consulting Engineers.
Pat Rice asked that a written commitment be submitted from the County Highway as to
their intention. Terry Jones responded that the Department could contact the county for a
copy of the commitment.
Kevin Kirby stated that the County is committed to building the ramp system -it will be
built regardless! Either the County will build it, or INDOT will build it at some point.
The County will not move forward right now without a way of financing. The financing
will come through the TIF project. The Inter -Local Agreement probably will not be
agreed to by the City until the rezone is acted upon by the Council.
There were questions regarding the positioning of the loading docks and the aesthetics.
The petitioner stated that according to the ordinance, the loading /unloading berths or bays
visible to US Highway 31 or Keystone Avenue shall be screened subject to the approval
of the Plan Commission or Committee of the Plan Commission.
Terry Jones pointed out that as currently written, the ordinance states that Plan
Commission would only have the approval of an ADLS. If there is anything not desired
by the Commission, now is the time to express that.
Dave Cremeans asked about additional canopy trees to soften the parking area; Mike
Hollibaugh concurred -it would be difficult to have "too many trees" in the parking area.
Dave also pointed out that if a radio or TV station were to occupy the facility, towers
would not be permitted under the Ordinance. There was an overall concern as to what
uses would be allowed if the "big box" were to become vacant. There is no sign package
at present, but the petitioner is bound to the Sign Ordinance or file with the BZA for any
variance.
There was also discussion regarding restaurants and the limitation on retail. Currently,
every other place in the corridor has the 15% requirement. Section 6.4 of the Ordinance
states that the gross floor area of restaurants is allowed to be less than 15,000 square feet,
no minimum unless the restaurant is considered retail. The Max Erma's Restaurant
was classified as a retail use.
The petitioner stated a willingness to give the building the architectural look of a two
story office building. As far as landscaping, there will be mounding on the far east side
of the project to buffer the Danbury Estates Subdivision.
Due to the length of the Agenda and the depth of the PUD Ordinance, the Committee
discussed reviewing the proposal at a special meeting that would be a single item
s:\ Minutes \Commmittees \spst2000feb 4
Agenda, held on the 22 of February in the Caucus Rooms. At that time, the Committee
would go through the text of the PUD Ordinance line by line.
Leo Dierckman moved to continue this Docket. Docket No. 98 -99 Z, Kite Rezone, was
officially continued to a special meeting to be held February 22, 2000 in the Caucus
Rooms of City Hall at 7:00 PM.
Item 4. Docket No. 105 -99 Z, Merchants' Pointe
Petitioner seeks a favorable recommendation for a rezone from R-
1 /Residential to B -8 /Business in order to construct between five and eight
retail buildings not to exceed a total of 95,000 square feet on 14.378 acres.
The site is located on the southwest corner of East 116 Street and North
Keystone Avenue. The site is zoned R -1 /Residential partially within the
SR 431 Overlay Zone.
Filed by James J. Nelson, Nelson Frankenberger, for The Linder Group
Jim Nelson appeared before the Committee representing the applicant. Also in
attendance were Gary Linder and Ernie Reno of The Linder Group; Steve Fehirbach of
A &F Engineering; Brian Sullivan and John Hart of Woodland Country Club.
Approval is being sought to rezone 14.378 acres on the southwest corner of 1 16 Street
and Keystone Avenue. The petitioner will be constructing a retail center to consist of
between 5 and eight buildings. Under the B -8 District, the Plan Commission would have
final review and ADLS approval.
According to the plan, a substantial buffer is provided by the re- designed golf course.
The golf course will still exist between Merchants Pointe and the homes that run through
the central core of Woodland. The distance from the property line to the nearest home is
710 feet. The buffer has been retained adjacent to Keystone.
Woodland is severely impacted by the widening of 116 Street; the consequence would
be that Woodland would have to look to the City for compensation for the taking of its
land for right -of -way.
From the beginning, the goal of the proposal was to emphasize 116 Street and de-
emphasize Keystone Avenue; this has been done by eliminating the frontage. The
frontage is 550 feet on Keystone and extends south to, but not beyond, the southern
boundary of the apartments on the east side of Keystone. On 116 Street, frontage
extends westward approximately 1100 feet to the intersection created by AAA Way and
116th Street.
Merchants Pointe is a mixed -use development, complementary to Merchants Square, and
provides for uses consisting of offices, restaurants, banking, a single tenant retail/service,
and a multi- tenant retail/service. There is one primary entrance to the development at the
intersection of AAA Way and 116 Street; the second access point is near Keystone and
is limited to right in/right out only. The goal is to provide the uses in a park -like setting,
s:\ Minutes \Commmittees \spst2000feb
created by not only the walkway that will become part of the 116 Street roadway
improvements, but extensive landscaping both in the perimeter and interior of the
development. Woodland Country Club is extremely concerned about perimeter
landscape treatment.
In response to comments made by Ron Houck at the Plan Commission meeting on
January 18 Jim Nelson stated that the phrase "fast food restaurant" was used in
conjunction with drive through window food sales. The petitioner is willing to amend his
commitments to describe "fast food" as those restaurants offering drive through window
food sales. These types of restaurants will be eliminated as permitted uses within the
Merchants Pointe development and the commitments will be revised accordingly.
Gary Linder of the Linder Group addressed the Committee and presented an overview of
the proposed project. A short video was shown featuring the layout and highlights of
Merchants Pointe.
Jim Nelson stated that construction of the Merchants Pointe development would
commence this fall -site work, infrastructure, drainage, utilities. The Mayor has said that
the 116 Street project will begin in February or March, Spring of 2001. There are some
benefits for Merchants Pointe to begin early and prior to the commencement of work on
116 Street. First, the right -of -way becomes immediately available to the City. Drainage
facilities are needed for the 1 16 Street road project; the drainage facilities are provided
by the lakes as a part of Merchants Pointe. The infrastructure work, drainage, sewer, and
utility lines, can be constructed underneath 1 16 Street over to Merchants Pointe. Also,
the intersection of 116 Street and Keystone is elevated -the golf course grade is higher
than 116 Street. The road project requires that that area be brought to grade and it can
be done so as a part of Merchants Pointe, thereby reducing the City's costs and reducing
the amount of right -of -way needed at the intersection. According to the chart of
se�uence of improvements, the road could be open and available for use on November
15 and coincidentally, a building in Merchants Pointe could be occupied on November
15
Steve Fehribach of A &F Engineering, traffic engineers, addressed the Committee in
response to points raised at public hearing. There were four major concerns expressed as
follows: 1) Level of service "C" or better required at 116 and Keystone; 2) Stacking
availability on AAA Way and how to accommodate cars turning left onto 116 Street; 3)
Level of service at AAA Way intersection; and 4) Timing of the light and stacking
distance for cars northbound on Keystone Avenue turning left onto 116 Street.
Mr. Fehribach stated that AAA Way was analyzed with the proposed traffic volumes; it
was determined that in the AM peak hours, approximately 25 feet of storage was needed,
basically 2 1/2 to 3 cars. In the afternoon, in the PM peak hours, it was determined that
approximately 75 feet of stacking is needed to accommodate cars turning left into the
development. A left turn arrow will be needed at this intersection. Currently, the design
provides for a median in the center of 116 Street that is 16 feet wide. The median will
be cut back 75 to 100 feet to provide for stacking; this will establish a 4 foot median for
s:\ Minutes \Commmittees \spst2000feb
left turns. The level of service is C in the AM and D in the afternoons, both acceptable
levels of service. A &F Engineering is also designing the roadway improvements for the
City of Carmel. The improvements are a Federal aid project administered by the State of
Indiana and certain criteria must be followed.
A left turn lane will be built out at 116 and Keystone, two through lanes, and a right
exclusive, right turn lane. What is currently happening to cause the 561 seconds delay is
that the number of cars turning right blocks the through lanes. By adding the extra
through lane, the queue length required for eastbound traffic on 116 Street can be
reduced. On the average, cars will be able to proceed through the signal every minute as
opposed to having to wait one, two, or three green lights to proceed through an
intersection.
The traffic guidelines state that level of service "C" should be achieved where practical; if
it cannot be achieved, you must maintain that level of service for that delay in the
intersection after you add the traffic on the intersection. By virtue of the city
improvements, the amount of delay in east /westbound traffic has been improved. The
high volume of traffic on Keystone, southbound in the AM, northbound in the PM,
creates a level of service that is unacceptable for those approaches. When viewed as an
entire intersection, there are intersection delays and not necessarily what is occurring at
each approach. Once the extra lanes are achieved in the east and westbound directions, it
may be possible to re -time the signal, however, the timing of the signal is justified by the
State of Indiana and the City can only propose the change. In order to do any work in the
State right -of -way, a permit must be issued by the State to do any work on the signal. At
that time, the overall timing of the intersection, with the improvements, will be looked at.
There are no guarantees that the State will add additional green time to the northbound
traffic turning left onto 116 Street, but the request will be made.
Laurence Lillig commented on some minor changes that should be made in the
commitments regarding the use and development of the real estate and voiced concerns
with the site plan -those concerns will be addressed at the ADLS review.
Dave Cremeans clarified that the impact of the 116 Street improvements would make 5
or 6 holes of the golf course un- playable and the City would be required to compensate
Woodland to re- design the holes so that they would be playable -this would become a
taxpayer expense. Private development in this location would mitigate the expense to the
taxpayers of Carmel.
Jim Nelson stated that in this particular case, the center line of 116 Street in this area is
not the section line. At the time roadway improvements were made, they were made
basically on the north side of 116 Street. The section line is approximately two feet
north from the south edge of the pavement. The minimum right -of -way required is 58
feet; closer to the intersection, it widens. On hole No. 1 of the golf course, 58 feet would
put you into the sand trap, then proceeding east, it approaches the green's edge.
s:\ Minutes \Commmittees \spst2000feb 7
The re- design of the golf course goes all the way to Westfield Boulevard and the County
requires a 60 foot one -half right -of -way at that location. There will be no development
between the golf course and Westfield Boulevard.
Dave Cremeans asked about the sign package. The Department responded that there are
currently three planned, one on Keystone Avenue, one at the corner of 116 Street and
Keystone, and one on 116 Street. Dave commented that there seems to be no particular
advantage to heavily landscaping the development if there is going to be a proliferation of
signs.
For purposes of clarification, and so that there is no misunderstanding, Jim Nelson stated
that some of the trees at the very corner of Keystone and 116 Street appear to be on
Woodland's property; however, the trees are in the State right -of -way. At present, the
State has no plans for Keystone Avenue.
Woodland has filed a Special Use application with the Board of Zoning Appeals for
approval of the re- design of the golf course.
There was concern expressed by some of the Committee members that approving a
rezone in this location for retail use would have a "domino" effect on 116 Street, west
towards Rangeline Road. Kevin Kirby commented that all of the residences on 116
Street between Keystone and 116 Street would be impacted by the proposed roadway
improvements. No homes are proposed to be re- located.
Brian Sullivan, engineer for Woodland Country Club, addressed the Committee in regard
to the drainage. Drainage from Merchants Pointe will be directed into the two ponds.
There is an existing culvert under Keystone Avenue -the water drains to the south, under
Keystone Avenue, and into the Woodland Lake. In connection with the redevelopment,
all of the drainage would be re- directed into the ponds and out -fall would be restricted in
accordance with County requirements. The ponds will be constructed at a minimum of 8
feet deep; the function of the ponds will be to act as a source of irrigation for the golf
course. There are existing wells on the golf course, strictly for irrigation. During off
peak hours, the ponds will be filled.
In response to questions from Jim O'Neal, Mr. Sullivan stated that he did not know where
the runoff from existing Merchants Square is directed. The runoff from Merchants Pointe
will not go to Woodland Lake -it will run south through another section of Woodland
Golf Club platted Subdivision and ends up in Carmel Creek one quarter mile south. All
utilities for Merchants Pointe will be coming from Merchants Square; water, sanitary,
gas, etc.
Michael Hollibaugh stated that he had sat in on a meeting today with INDOT and they
had moved up the 116 Street project commensurate with the US 31 study. If Merchants
Pointe is approved as presented, and INDOT does not widen the intersection to
accommodate the traffic, the traffic flow in that area will be severely impacted as well as
the project.
s:\ Minutes \Commmittees \spst2000feb
Although the public hearing was closed on this Docket on January 18 Paul Spranger
asked for additional comments from the public.
Gerry Bonarrigo- Burton, 11138 Rolling Springs Drive, Carmel, commented that she and
her family had moved here from Pennsylvania and she liked her home and liked Carmel.
Ms. Burton chose Carmel because she liked the "feel' of Carmel rather than any other
area. Carmel was selected because of the low crime, high property values, good family
atmosphere and excellent schools, not because of retail development and the traffic that
accompanies retail.
Bill Moke, Lakeshore Drive East, Woodland Homeowners Association, stated that he had
polled a number of the members of the association. The members were opposed to the
rezone because: the loss of green space, increase in retail, retail extending south of 116
Street, and the increase in traffic.
John Struck, a 22 year resident of Carmel and a 23 year member of the Woodland
Country Club, commented that what is before the Commission is a win win -win
situation. The City of Carmel will win because they gain right -of -way on 116 Street at
no cost; there will be increased employment and an increased tax base to the City; and the
City will not have to reimburse Woodland Country Club for damage and rebuilding the
golf course. The citizens will gain additional green space (40 acres) and quality
restaurants. Woodland Country Club will gain a premiere golf course designed by Pete
Dye and Woodland will be making a four and one -half million dollar investment in the
City of Carmel.
John Hart, president of Woodland Country Club, stated that the membership of
Woodland Country Club is in favor of the sale and rezone of this portion of ground and
also in favor of redesigning the golf course. Woodland Country Club is committed to the
area and the plans are for the Club and Golf Course to be in being for years to come as it
has been for the past 50 years.
Bob Modisett moved to continue this Docket to the next committee meeting, March 7,
2000. APPROVED UNANIMOUSLY.
For purposes of clarification, Jim Nelson is to provide the Committee with the
dimensions of the buffered area along Keystone Avenue; definition of a "fast- food"
restaurant; and written evidence of the elimination of signage along Keystone.
Item 5. Docket Nos. 106 -99 107 -99 DP /ADLS, Carmel Science
Technology Park, Block 14, Lot 3
Petitioner seeks approval to plat one lot on 3.533 acres and to construct
seven self storage buildings with office totaling 69,300 square feet on
3.533 acres to be known as Carmel Drive Storage. The site is located at
550 West Carmel Drive. The site is zoned M- 3/Manufacturing.
Filed by Keith Bonham of the Tower Design Group, PC.
s:\ Minutes \Conimmittees \spst2000feb
Keith Bonham of Tower Design Group appeared before the Committee representing
Keltner, Inc., the applicant. Approval is being requested to construct 7 self storage
buildings, together with office space, on 3.5 plus acres.
The buildings will be split -face block and metal roof with a matte black finish. The
buildings will incorporate natural brick. The parking lot will have shoebox, down
lighting on single light poles. The interior lighting will consist of wall packs.
There was concern expressed by the Committee as to the location of the wall around the
project on Carmel Drive. The petitioner has allowed for a 10 foot wide bicycle path and
some landscaping.
Robert Moore, 5924 Five Trails, Carmel, has a business next door to the proposed
facility. Mr. Moore was concerned about the closeness of the wall to the street,
especially in relation to his building which sets back quite a distance.
There was discussion among the Committee on the setbacks of the buildings and the
location of the wall.
Pat Rice moved to continue this Docket until the March 7 th Committee meeting.
UNANIMOUSLY APPROVED.
Item 6. Docket No. 109 -99 DP /ADLS, Wingate Inn
Petitioner seeks approval to construct a 57,500 square foot hotel on 4.066
acres. The site is located at 1460 West Main Street (northeast corner of
East 131 Street and North Meridian Street). The site is zoned S-
2 /Residential within the U.S. 31 Overlay Zone.
Filed by Philip A. Nicely of Bose McKinney Evans for Meridian Hotel
Partners.
Phil Nicely appeared before the Committee representing the applicant. Mr. Nicely
brought some samples of the building brick for display.
There was discussion among the Committee regarding this particular site. It was
recommended that the petitioner file for an Economic Hardship with the State. There are
City issues on this site as well as State. The Department recommends Tabling this item.
Pat Rice moved to table Docket No. 109 -99 DP /ADLS, Wingate Inn, until a Hardship
Petition is filed with the State. UNANIMOUSLY APPROVED.
There being no further business to come before the Committee, the meeting was
adjourned at 12:00 AM.
Paul Spranger, Chairperson
Ramona Hancock, Secretary
s:\ Minutes \Commmittees \spst2000feb 10