Loading...
HomeMy WebLinkAbout189743 09/14/2010 CITY OF CARMEL, INDIANA VENDOR: 068025 Page 1 of 1 0 ONE CIVIC SQUARE CROSSROAD ENGINEERS, PC CHECK AMOUNT: $82,079.46 CARMEL, INDIANA 46032 3417 S SHERMAN DR •w,, BEECH GROVE IN 46107 CHECK NUMBER: 189743 CHECK DATE: 911 412 01 0 DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION 203 R4462200 21810 10546 1,312.80 106TH PATH CONS INSPE 2200 4340100 21793A 10553 2,086.82 ON CALL CONSULTING 202 4350900 27442 10558 15,000.00 ASA #16/106TH PATH SU 202 4340100 21808 10564 19,687.36 HAZEL DELL ARPA PROJE 1205 R4462862 21816 10565 30,617.48 CONST INSP -HAZEL DELL 2200 4350900 21786 10571 345.00 126 AUMAN ENG /ROW 206 4340100 21791 10576 4,250.00 HAVERSTICK DRAINAGE P 206 4340100 21824 10577 7,500.00 HAVERSTICE DRAINAGE I 206 4340100 27437 10584 1,280.00 ASA #11 -ON CALL REVIE CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 317 -780 -1555 City of Carmel Invoice number 10565 Michael McBride, City Engineer Date 09/02/2010 1 Civic Square Page number 1 Carmel, IN 46032 Project: HAZEL DELL PARKWAY IMPROVEMENTS For services performed August 1 through August 27, 2010 e2 PROMPT PAYMENT OF INVOICE IS APPRECIATED!! These services were provided in accordance with our contract #03.03.10.03 approved March 3, 2010 and Additional Services 9 PO #21816 Local Inspection Professional Fees Billed Hours Rate Amount Director 38.00 125.00 4,750.00 Resident Project Engineer 137.00 95.00 13,015.00 Assistant Project Inspector 196.00 60.00 11,760.00 Reimbursables Billed Units Rate Amount Miles 2,276.00 0.48 1,092.48 Phase subtotal 30,617.48 total 30,617.48 Invoice total 30,617.48 T k oul s Presiden City of Carmel Invoice number: 10565 Invoice date: 09/02/2010 CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 317- 780 -1555 City of Carmel Invoice number 10584 Michael McBride, City Engineer Date 09/02/2010 1 Civic Square Page number 1 of 2 Carmel, IN 46032 Project: CITY OF CARMEL ON CALL PLAN REVIEW For services performed August 1 through August 27, 2010 n PROMPT PAYMENT OF INVOICE IS APPREC These services were provided in accordance with our contract #0319.97.02 dated March 19, 1997 including the Additional Services Amendment #11 P.O. #27437: General Plan Review Professional Fees Billed Hours Rate Amount Senior Project Manager 2.00 115.00 230.00 Project Engineer 2.50 85.00 212.50 Phase subtotal 442.50 total 442.50 Livingstone Cottages Professional Fees Billed Hours Rate Amount Project Engineer 1.50 85.00 127.50 Phase subtotal 127.50 total 127.50 Midwest ISO Expansion 2010 Professional Fees Billed Hours Rate Amount Senior Project Manager 0.50 115.00 57.50 Project Engineer 2.00 85.00 170.00 Phase subtotal 227.50 total 227.50 City of Carmel Invoice number: 10584 Invoice date: 09/0212010 City of Carmel Invoice number 10584 Date 09/02/2010 Page number 2 of 2 Project: CITY OF CARMEL ON CALL PLAN REVIEW 116th Centre Apartments Professional Fees Billed Hours Rate Amount Senior Project Manager 0.50 115.00 57.50 Project Engineer 5.00 85.00 425.00 Phase subtotal 482.50 total 482.50 Invoice total 1,280.00 Tha Y u! p a E. r President l City of Carmel Invoice number: 10684 Invoice date: 09/02/2010 CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 317- 780 -1555 City of Carmel Invoice number 10546 Michael McBride, City Engineer Date 09/02/2010 1 Civic Square Page number 1 of 2 Carmel, IN 46032 Project: 106TH STREET PATH KEYSTONE TO WESTFIELD For services performed August 1 through August 27, 2010 dAA PROMPT PAYMENT O F INV IS APPR These services were provided in accordance with our contract #03.03.10.03 approved March 3, 2010 and Additional Services 6: PO #21810: Inspection Professional Fees Billed Hours Rate Amount Director 2.00 125.00 250.00 Resident Project Engineer 10.00 95.00 950.00 Assistant Project Inspector 1.00 60.00 60.00 Reimbursables Billed Units Rate Amount Miles 25.00 0.48 12.00 Phase subtotal 1,272.00 total 1,272.00 Construction Staking Reimbursables Billed Units Rate Amount Miles 85.00 0.48 40.80 Phase subtotal 40.80 total 40.80 Invoice total 1,312.80 City of Carmel Invoice number: 10546 Invoice date: 09/02/2010 City of Carmel Invoice number 10546 Date 09/02/2010 Page number 2 of 2 Project: 106TH STREET PATH KEYSTONE TO WESTFIELD Than u! U' Chip Cha E. President City of Carmel Invoice number: 10546 Invoice date: 09/02/2010 CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 317- 780 -1555 City of Carmel Invoice number 10576 Gary Duncan Date 09/02/2010 One Civic Square Page number 1 of 2 Carmel, IN 46032 Project: HAVERSTICK DRAINAGE IMPROVEMENTS For services performed August 1 through August 27, 2010 011? PROMPT PAYMENT OF INVOICE IS APPRECIATED!! These services were provided in accordance with our contract #03.03.10.03 approved March 3, 2010 and Additional Services #3: P.O. #21791 Haverstick Coachman Survey Amount Contract Amount 5,500.00 Percent Complete 100.00 Total Billed 5,500.00 Current Billed 0.00 Haverstick Coachman Design Permitting Amount Contract Amount 12,500.00 Percent Complete 90.00 Total Billed 11,250.00 Current Billed 1,250.00 Haverstick Coachman Bidding Amount Contract Amount 2,000.00 Percent Complete 50.00 Total Billed 1,000.00 Current Billed 1,000.00 Haverstick Coachman Construction Administration Amount Contract Amount 4,000.00 Percent Complete 0.00 Total Billed 0.00' Current Billed 0.00 Lexington Lane Survey Amount Contract Amount 2,000.00 Percent Complete 100.00 Total Billed 2,000.00 Current Billed 0.00 Lexington Lane Design Permitting Amount Contract Amount 5,000.00 Percent Complete 90.00 Total Billed 4,500.00 Current Billed 500.00 City of Carmel Invoice number. 10576 Invoice date: 09/02/2010 City of Carmel Invoice number 10576 Date 09/02/2010 Page number 2 of 2 r Project: HAVERSTICK DRAINAGE IMPROVEMENTS Lexington Lane Bidding Amount Contract Amount 1,000.00 Percent Complete 50.00 Total Billed 500.00 Current Billed 500.00 Lexington Lane Construction Adminstration Amount Contract Amount 2,500.00 Percent Complete 0.00 Total Billed 0.00 Current Billed 0.00 106th St at 106th Place Survey Amount Contract Amount 2,000.00 Percent Complete 100.00 Total Billed 2,000.00 Current Billed 0.00 106th St at 106th Place Design Permitting Amount Contract Amount 5,000.00 Percent Complete 90.00 Total Billed 4,500.00 Current Billed 500.00 106th St at 106th Place Bidding Amount Contract Amount 1,000.00 Percent Complete 50.00 Total Billed 500.00 Current Billed 500.00 106th St at 106th Place Construction Administration Amount Contract Amount 2,500.00 Percent Complete 0.00 Total Billed 0.00 Current Billed 0.00 Total 4,2 50.00 Invoice total 4,250.00 Tha k uI C Ch C rl President City of Carmel Invoice number: 10576 Invoice date: 09/02/2010 CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 317- 780 -1555 City of Carmel Invoice number 10558 Michael McBride, City Engineer Date 09/02/2010 1 Civic Square Page number 1 Carmel, IN 46032 Project. 106TH STREET PEDESTRIAN PATH- GRAY TO HAZEL DELL For services performed August 1 through August 27, 2010 P R O MPT PAYMENT O F INV I APPRE These services were provided in accordance with our contract #0319.97.02 dated March 19, 1997 including the Additional Services Amendment #16 P.O. #27442: Topographic Survey Amount Contract Amount 6,000.00 Percent Complete 100.00 Total Billed 6,000.00 Current Billed 6,000.00 Preliminary Phase Amount Contract Amount 500.00 Percent Complete 100.00 Total Billed 500.00 Current Billed 500.00 Design Construction Drawings Amount Contract Amount 8,500.00 Percent Complete 100.00 Total Billed 8,500.00 Current Billed 8,500.00 Regulatory Submittals Bidding Phase Amount Contract Amount 3,500.00 Percent Complete 0.00 Total Billed 0.00 Current Billed 0.00 Total 15,000.00 Invoice total 15,000. Tqres idenn C P City of Carmel Invoice number: 10558 Invoice date: 09/02/2010 ok X CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 317- 780 -1555 City of Carmel Invoice number 10577 Gary Duncan Date 09/0212010 One Civic Square Page number 1 of 2 Carmel, IN 46032 Project: HAVERSTICK DRAINAGE IMPROVEMENTS For services performed August 1 through August 27, 2010 120 PROMPT PAYMENT OF INVOICE IS APPRECIATED!! These services were provided in accordance with our contract #0319.97.02 dated March 19, 1997 including the Additional Services Amendment #10 P.O. #21824: Lakeshore Drive East Lakeview Drive Survey Amount Contract Amount 2,000.00 Percent Complete 100.00 Total Billed 2,000.00 Current Bilied 0.00 Lakeshore Drive East Lakeview Drive Design /Permitting Amount Contract Amount 5,000.00 Percent Complete 90.00 Total Billed 4,500.00 Current Billed 2,000.00 Lakeshore Drive East Lakeview Drive Bidding Amount Contract Amount 1,000.00 Percent Complete 50.00 Total Billed 500.00 Current Billed 500.00 Lakeshore Drive East Lakeview Drive Construction Admin. Amount Contract Amount 2,500.00 Percent Complete 0.00 Total Billed 0.00 Current Billed 0.00 Strafford Place N. of 106th Street Survey Amount Contract Amount 2,000.00 Percent Complete 100.00 Total Billed 2,000.00 Current Billed 0.00 Stratford Place N. of 106th Street Design /Permitting Amount Contract Amount 5,000.00 Percent Complete 90.00 Total Billed 4,500.00 Current Billed 2,000.00 Stratford Place N. of 106th Street Bidding Amount Contract Amount 1,000.00 Percent Complete 50.00 Total Billed 500.00 Current Billed 500.00 City of Carmel Invoice number: 10577 Invoice date: 09/02/2010 City of Carmel Invoice number 10577 Date 09/02/2010 Page number 2 of 2 Project: HAVERSTICK DRAINAGE IMPROVEMENTS Stratford Place N. of 106th Street Construction Admin. Amount Contract Amount 2,500.00 Percent Complete 0.00 Total Billed 0.00 Current Billed 0.00 106th Place N. of 106th Street Survey Amount Contract Amount 2,000.00 Percent Complete 100.00 Total Billed 2,000.00 Current Billed 0.00 106th Place N. of 106th Street Design /Permitting Amount Contract Amount 5,000.00 Percent Complete 90.00 Total Billed 4,500.00 Current Billed 2,000.00 106th Place N. of 106th Street Bidding Amount Contract Amount 1,000.00 Percent Complete 50.00 Total Billed 500.00 Current Billed 500.00 106th Place N. of 106th Street Construction Admin. Amount Contract Amount 2,500.00 Percent Complete 0.00 Total Billed 0.00 Current Billed 0.00 T 7,500.00 Invoice total 7,500.00 Th k oul L C h r President City of Carmel Invoice number: 10577 Invoice date: 0910212010 CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 317 780 -1555 City of Carmel Invoice number 10564 Michael McBride, City Engineer Date 09/02/2010 1 Civic Square Page number 1 Carmel, IN 46032 Project: HAZEL DELL PARKWAY IMPROVEMENTS ,ry "I .0&10\ For services performed August 1 through August 27, 2010 1 PR PAYM OF INVOICE IS APPRECIATEX These services were provided in accordance with our LPA- Consulting contract dated March 17, 2010: Des No.: 0901163 Sao v ARRA Inspection Professional Fees Billed Hours Rate Amount Director 38.00 143.76 5,462.88 Assistant Project Inspector 183.00 39.93 7,307.19 Resident Project Representative 105.50 61.98 6,538.89 Reimbursables Billed Units Rate Amount Miles 946.00 0.40 378.40 Phase subtotal 19,687.36 total 19,687.36 Invoice total 19,687.36 Th k ou! C P h President City of Carmel Invoice number: 10564 Invoice date: 09/02/2010 Hazel Dell Parkway Improvements ARRA Inspection Date Range from: 713112010,to 8/27/2010 Work In Progress Empl oyeelActivity Total: Billed WIP Total;:. Billable D e f erred Hold Non Billable'_ Writeoff Andrew J. Wolf 105.50 105.50 Billable Time 105.50 105.50 Date Total Billed WIP Total Billable Deferred H N Billable Writeoff 8/2/2010 5.00 5.00 8/3/2010 6.00 6.00 8/4/2010 6.50 6.50 8/5/2010 6.00 6.00 8/6/2010 5.50 5.50 8/9/2010 6.50 6.50 8/1012010 4.50 4.50 811112010 4.50 4.50 8/12/2010 5.00 5.00 8/13/2010 5.00 5.00 8/16/2010 5,00 5.00 8/17/2010 3.00 3.00 8/18/2010 5.00 5.00 8/19/2010 7.00 7.00 8/20/2010 5.00 5.00 8/23/2010 5.00 5.00 8/24/2010 5.50 5.50 8/25/2010 5.50 5.50 8/26/2010 5.50 5.50 8/27/2010 4.50 4.50 Nicholas LaGuardia 183.00 183.00 Billable Time 183.00 183.00 Date Total Billed WIPTotal Bill Deferred Hold Non Billable Writeoff 7/31/2010 3.00 3.00 8/2/2010 8.00 8.00 8/2/2010 2.00 2.00 8/3/2010 8.00 8.00 8/3/2010 2.50 2.50 8/4/2010 8.00 8.00 8/4/2010 2.00 2.00 81512010 8.00 8.00 Hazel Dell Parkway Improvements ARRA Inspection Date Range from: 7/31 /2010 to 8/27/2010 Work In Progress Emp loyee /Activity Total',. Billed WIP Total Billable Deferr Hold Non Billable: Writeoff 8/5/2010 1.50 1.50 8/6/2010 8.00 8.00 8/6/2010 1.50 1.50 81912010 8.00 8.00 8/9/2010 1.50 1.50 8/10/2010 8.00 8.00 8/10/2010 0.50 0.50 811112010 7.50 7.50 8/12/2010 8.50 8.50 8/13/2010 8.00 8.00 8/14/2010 4.00 4.00 8/16/2010 10.00 10.00 8/17/2010 6.00 6.00 8/18/2010 8.00 8.00 8/19/2010 8.00 8.00 8/20/2010 4.00 4.00 8/23/2010 8.00 8.00 812312010 3.00 3.00 8/24/2010 8.00 8.00 8/25/2010 8.00 8.00 8/25/2010 1.50 1.50 8/26/2010 8.00 8.00 8/26/2010 2.00 2.00 8/27/2010 8.00 8.00 812712010 2.00 2.00 Trent E. Newport 38.00 38.00 Billable Time 38.00 38.00 Date T Billed WIP Total Billable Deferred Hold Non Billable Writeoff 8/2/2010 2.00 2.00 8/3/2010 2.00 2.00 81412010 2.00 2.00 8/5/2010 2.00 2.00 8/6/2010 2.00 2.00 8/9/2010 2.00 2.00 Hazel Dell Parkway Improvements ARRA Inspection Date Range from: 713172016fo 8/2712010 Work In Progress E mployee/Activity Total, Billed YVIPTotal Bill able Deferred H o l d N on Bill Writeoff 8/10/2010 2.00 2.00 8111/2010 2.00 2.00 8/12/2010 2.00 2.00 8113/2010 2.00 2.00 8/16/2010 2.00 2.00 8/17/2010 2.00 2.00 8/18/2010 2.00 2.00 8/19/2010 2.00 2.00 8/20/2010 2.00 2.00 8/23/2010 2.00 2.00 8/2412010 2.00 2.00 8/25/2010 2.00 2.00 8/26/2010 2.00 2.00 Total 326.50 326.50 Hazel De ARRA LAI =aukj v ARRA Inspection 946.00 3 78.40 07/31/10 Hazel Dell Parkway Improvements Mileage 2 0.00 8.00 08/02/10 Hazel Dell Parkway Improvements Mileage 10.00 4.00 08/02/10 Hazei Dell Parkway Improvements Mileage 32.00 12.80 08/03/10 Hazel Dell Parkway Improvements Mileage 35.00 14.00 08/03/10 Hazel Dell Parkway Improvements Mileage 40.00 16.00 08/03/10 Hazel Dell Parkway Improvements Mileage 10.00 4.00 08/04/10 Hazel Dell Parkway Improvements Mileage 10.00 4.00 08/04/10 Hazel Dell Parkway Improvements Mileage 33.00 13.20 08/05/10 Hazel Dell Parkway Improvements Mileage 42.00 16.80 08/05/10 Hazel Dell Parkway Improvements Mileage 10.00 4.00 08/06/10 Hazel Dell Parkway Improvements Mileage 10.00 4.00 08/06/10 Hazel Dell Parkway Improvements Mileage 33.00 13.20 08/09/10 Hazel Dell Parkway Improvements Mileage 27.00 10.80 08/09/10 Hazel Dell Parkway Improvements Mileage 10.00 4.00 08/10/10 Hazel Dell Parkway Improvements Mileage 18.00 7. 08/11/10 Hazel Dell Parkway Improvements Mileage 17.00 6.80 08/12/10 Hazel Dell Parkway Improvements Mileage 37.00 14.80 08/13/10 Hazel Dell Parkway Improvements Mileage 10.00 4.00 08/13/10 Hazel Dell Parkway Improvements Mileage 10.00 4.00 08/13/10 Hazel Dell Parkway Improvements Mileage 10.00 4.00 08/13/10 Hazel Dell Parkway Improvements Mileage 10.00 4.00 08/13/10 Hazel Dell Parkway Improvements Mileage 35.00 14.00 08/14/10 Hazel Dell Parkway Improvements Mileage 29.00 11.60 08/16/10 Hazel Dell Parkway Improvements Mileage 10.00 4.00 08/16/10 Hazel Dell Parkway Improvements Mileage 20.00 8.00 08/17/10 Hazel Dell Parkway Improvements Mileage 10.00 4.00 08/17/10 Hazel Dell Parkway Improvements Mileage 89.00 35.60 08/18/10 Hazel Dell Parkway Improvements Mileage 27.00 10.80 08/18/10 Hazel Dell Parkway Improvements Mileage 10.00 4.00 08/19/10 Hazel Dell Parkway Improvements Mileage 25.00 10.00 08/19 Hazel Dell Parkway Improvements Mileage 25.00 10.00 08/20/ Hazel Dell Parkway Improvements Mileage 19.00 7.6 08/20/10 Hazel Dell Parkway Improveme Mileage 29.00 11.60 08/23/10 Hazel Dell Parkway Improvements Mileage 30.00 12.00 08/23/10 Hazel Dell Parkway Improvements Mileage 10.00 4.00 08/24/10 Hazel Dell Parkway Improvements Mileage 19.00 7.60 08/24/10 Hazel Dell Parkway Improvements Mileage 10.00 4.00 08/25/10 Hazel Dell Parkway Improvements Mileage 25.00 10.00 08/25/10 Hazel Dell Parkway Improvements Mileage 10.00 4.00 08/26/10 Hazel Dell Parkway Improvements Mileage 10.00 4.00 08/26/10 Hazel Dell Parkway Improvements Mileage _29.00 11.60 08/27/10 Hazel Dell Parkway Improvements Mileage 31.00 12.40 08/27/10 Hazel Dell Parkway Improvements Mileage 10.00 4.00 946.00 378.40 CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 317 -780 -1555 City of Carmel Invoice number 10571 Michael McBride, City Engineer Date 09/02/2010 1 Civic Square Page number 1 of 2 Carmel, IN 46032 Project: 126TH /NAPPANEE /OSWEGO WALK PROJECT For services performed August 1 through August 27, 2010 !G'Zab PROMPT PAYMENT OF INVOICE IS APPRECIATED!! These services were provided in accordance with our contract #03.03.10.03 approved March 3, 2010 and Additional Service Amendment #1, P.O. #21786: Exhibit Drawing Units Amount Contract Amount 1.00 400.00 Percent Complete 100.00 Total Billed 1.00 400.00 Current Billed 0.00 0.00 Legal Descriptions Units Amount Contract Amount 2.00 900.00 Percent Complete 100.00 Total Billed 2.00 900.00 Current Billed 0.00 0.00 RIW Staking Units Amount Contract Amount 1.00 400.00 Percent Complete 100.00 Total Billed 1.00 400.00 Current Billed 0.00 0.00 Document Recordation Units Amount Contract Amount 1.00 50.00 Percent Complete 0.00 Total Billed 0.00 0.00 Current. Billed 0.00 0.00 Total 0.00 Buying Reimbursables Billed Units Rate Amount Fees Permits 1.00 345.00 345.00 Partial Mortgage Release Larsen Phase subtotal 345.00 total 345.00 City of Carmel Invoice number: 10571 Invoice date: 0910212010 City of Carmel Invoice number 10571 Date 09/02/2010 Page number 2 of 2 Project: 126TH /NAP PANE E /OSWEGO WALK PROJECT Invoice total 345.00 *U! City of Carmel Invoice number: 10571 Invoice date: 09/02/2010 CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 317- 780 -1555 City of Carmel Invoice number 10553 Michael McBride, City Engineer Date 0910212010 1 Civic Square Page number 1 of 2 Carmel, IN 46032 Project: CITY OF CARMEL ON CALL CONSULTING SERVICES For services performed August 1 through August 27, 2010 "2 °D CA PROMPT PAYMENT OF INVOICE IS APPRECIATED!! These services were provided in accordance with our contract #03.03.10.03 approved March 3, 2010 and Additional Services #4: PO #21793 N Monon Ditch Culvert Estimates Professional Fees Billed Hours Rate Amount Project Engineer 5.00 85.00 425.00 Phase subtotal 425.00 total 425.00 111th and Monon Walk connection Professional Fees Billed Hours Rate Amount Director 0.50 125.00 62.50 Project Engineer 5.00 85.00 425.00 CADD Technician 2.50 70.00 175.00 Resident Project Engineer 1.00 95.00 95.00 Phase subtotal 757.50 total 757.50 Southwest Old Town Redevelopment Right -of -Way Professional Fees Billed Hours Rate Amount Director 1.00 125.00 125.00 CADD Technician 6.00 70.00 420.00 City of Carmel Invoice number: 10553 Invoice date: 09/02/2010 City of Carmel Invoice number 10553 Date 09/02/2010 y Page number 2 of 2 Project: CITY OF CARMEL ON CALL CONSULTING SERVICES (Continued) Phase subtotal 545.00 total 545.00 Stonehedge-Rol ling Meadows Drainage Professional Fees Billed Hours Rate Amount Field Man 1.50 60.00 90.00 Reimbursables Billed Units Rate Amount Miles 9.00 0.48 4.32 Phase subtotal 94.32 total 94.32 General Misc. Management Professional Fees Billed Hours Rate Amount Director 1.00 125.00 125.00 CADD Technician 2.00 70.00 140.00 Carmel Southwest Clay Cap. Improvements Map Phase subtotal 265.00 total 265.00 Invoice total 2,086.82 Th ou! Chip C a I s, UE../ President City of Carmel Invoice number: 10553 Invoice date: 09/02/2010 Prescribed by State Board of Accounts City Form No. 201 (Rev. 1995) ACCOUNTS PAYABLE VOUCHER CITY OF CARMEL An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc. Payee Crossroad Engineers Purchase Order No. 3417 S. Sherman Dr. Terms Beech Grove, IN 46107 Date Due Invoice Invoice Description Amount Date Number (or note attached invoice(s) or bill(s)) 09/02/10 10565 Hazel Dell 131 st- Cherry Tree Inspection $30,617,48 09/02/10 10584 On Call Plan Review $1,280.00 09/02/10 10546 106th St. Path; Keystone Westfield $1,312.80 09/02/10 10576 Haverstick Drainage phase 1 $4,250.00 09/02/10 10558 106th St. Path Design; Gray -Hazel Dell $15,000.00 09/02/10 10577 Haverstick Drainage phase II $7,500.00 09/02/10 10564 Hazel Dell ARRA Inspection $19,687:36 09/02/10 10571 126th /Auman ROW Services $345.00 09/02/10 10553 On Call Consulting $2,086.82 Total I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited 9$E92 i07qo4q5nce. with IC 5- 11- 10 -1.6. 20 Clerk- Treasurer VOUCHER NO. WARRANT NO. ALLOWED 20 Crossroad Engineers IN SUM OF 3417 S. Sherman Dr Beech Grove, IN 46107 $82,079.46 ON ACCOUNT OF APPROPRIATION FOR Department of Engineering Board Members PO# or INVOICE NO. ACCT #/TITLE AMOUNT DEPT. I hereby certify that the attached invoice(s), or 218115 10585 8 bill(s) is (are) true and correct and that the materials or services itemized thereon for which charge is made were ordered and 2;Z442 10999 i62-569 o received except 21786 1 0571 2299 509 I 20 Signa ure Title Cost distribution ledger classification if claim paid motor vehicle highway fund