Loading...
HomeMy WebLinkAbout189652 09/14/2010 CITY OF CARMEL, INDIANA VENDOR: 363792 Page 1 of 1 0 ONE CIVIC SQUARE W R DUNKIN SON, INC CHECK AMOUNT: $26,770.50 CARMEL, INDIANA 46032 Po BOX zza7 on _.o ANDERSON IN 46018 CHECK NUMBER: 189652 CHECK DATE: 9/14/2010 DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION 902 4460807 APP 16 26,770.50 PAC JUNE \���i TM Document 7021CMa -1992 992 Application and Certificate for Pa Construction Manager Adviser Edition 51 TO OWNER: Carmel Redevelopment PROJECT Parcel 7A, 45010 Carmel APPLICATION NO: 016 Distribution to: Commission Performing Arts OWNER: X One Civic Square 777 3rd Ave S.W. PERIOD TO: June 30, 2010 CONSTRUCTION MANAGER: X Carmel, IN 46032 Carmel, IN 46032 ARCHITECT: X FROM W.R. Dunkin Son, Inc. VIA CONSTRUCTION Shiel Sexton Co., Inc. CONTRACT DATE: February 23, 2009 CONTRACTOR: X CONTRACTOR: PO Box 2247 MANAGER: PROJECT NOS: 25310H 2695/5010 2695 FIELD: Anderson, IN 46018 CONTRACT FOR: Bid Pkg 95010 V ARCH I T ECT: CSO Architects OTHER: CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief the Work covered by this Application for Payment- as been completed in accordance with the Application is made for payment, as shown below, in connection with the Contract. Contract Documents, that all at�i its have bes pat h ontractor for Work for which previous Continuation Sheet, ALA Document (3703, is attached. Certi s for Pa me i efe i uec�and pa s receive om the Owner, and that current 1. ORIGINAL CONTRACT SUM 1,480,000.00 pa ho m is ow lie. 1. NET CHANGE BY CHANGE ORDERS 81,040.00 CONTRA R: W NK 1 N, 3. CONTRACT SUM TO DATE (Line I 2) 1,398,960.00 By: Date: June 16, 2010 4. TOTAL COMPLETED STORED TO DATE (Column G on G703) 71.1,585.00 ate of: Indiana 5. RETAINAGE: County of: Madison a. 5 of Completed Work Subscribed and sworn to before (Column D E on G703) 69,948.00 me this 16th day of June, 20 LO b• 0 of Stored Material Notary Public: Martha A. Carpenter (Column F on G703) 0.00 My Commission expires: January 08, 2017 Total Retainage (Lines 5a 5b or Total in Column I of G703) 69,948.00 CERTIFICATE FOR PAYMENT 6. TOTAL EARNED LESS RETAINAGE 641,637.00 In accordance with the Contract Documents, based on on -site observations and the data comprising (Line 4 Less Line 5 Total) this application, the Construction Manager and Architect certify to the Owner that to the best of their 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT 614,866.50 knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT (Line 6 from prior Certificate) CERTIFIED. 6. CURRENT PAYMENT DUE 26,770.50 AMOUNT CERTIFIED 26,770.50 9. BALANCE TO FINISH, INCLUDING RETAINAGE (Attach explanation if amount certified differs from the amo pplied. Initial all figures on this Application and on th onlinuation Sheet d are than d to conform with the amount certified.) (Line 3 less Line 6) 757,323.00 CONSTRUCTION MA A ER: By: Date: CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS ARCHI T: Total changes approved in previous months by Owner 0.00S 81,040.00 By: Date: Total approved this Month 0.00$ 0.00 This Certific6 not gotiable. The AMOUNT CERTIFIED is payable only t the Contractor TOTALS 0.00$ 81,040.00 named hereinan payment and acceptance of payment are without prejudice to any rights of the Owner or .tor under t his Contract. NET CHANGES b Change Order 81,040.00 AIA Document G7021CMaTM 1992. Copyright 0 1992 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 11:16:33 on 06/21/2010 under Order No.0168420739_1 which expires on 0 511 01201 1, and is not for resale. User Notes: (1949258051) TM =I Document 0703 -1992 Continuation Sheet AIA Document, G702 -1992, Application and Certification for Payment, or G736 -2009, APPLICATION NO: 01.6 Project Application and Project Certificate for Payment, Construction Manager as Adviser Edition, APPLICATION DATE: 06/16/2010 containing Contractor's signed certification is attached. In tabulations below, amounts are in US dollars. PERIOD TO: 06/30/2010 Use Column I on Contracts where variable retainage for line items may apply. ARCHITECT'S PROJECT NO: 25310H A B C D E F G H I WORK COMPLETED TOTAL MATERIALS COMPLETED BALANCE TO RETAMAGE ITEM DESCRIPTION OF SCHEDULED FROM PRESENTLY PREVIOUS AND STORED TO FINISH (IF VARIABLE RATE NO. WORK VALUE THIS PERIOD STORED DATE (G C} (C G) APPLICATION (NOT IN D OR E) DATE D +E 01010 Performance Bond 26,400.00 26,400.00 0,00 0.00 26,400.00 100.00% 0.00 2,640.00 Mobilize 01015 Demobilize 8,000.00 4,000.00 0.00 0.00 4,000.00 50.00% 4,000.00 400.00 Supervision 01020 Coordination 87,000.00 63,000.00 3,000.00 0.00 66,000.00 75.86%1 21,000.00 6,600.00 General Conditions 01025 M 30,000.00 23,400.00 1,000.00 0.00 24,400.00 81.33 5,600.00 2,440.00 General Conditions 01026 L 34,000.00 24,000.00 1,200.00 0.00 25,200.00 74.12% 8,800.00 2,520.00 1400A Organ Facade Pipes 200,000.00 86,720.00 0.00 0.00 86,720.00 43.36% 113,280.00 8,672.00 Carpentry Labor 1400B Hours 32,000.00 32,000.00 0.00 0.00 32,000.00 100.00% 0.00 3,200.00 Provide Tie -Off 1400C Points at Balconies 25,000.00 0.00 0.00 0.00 0.00 0.00%1 25,000.00 0.00 Vertical Partition System Backfold 1400D Doors 15,000.00 15,000.00 0.00 0.00 15,000.00 100.00 0.00 1,500.00 16'X16' Temporary 1400E Overhead Door 6,000.00 6,000.00 0.00 0.00 6,000.00 100.00 0.00 600.00 Temporary OHD Enclosure and 1.40OF Insulation 10,000.00 1 0.00 0.00 1,644.00 16.44% 8,356.00 164.40 1000 SY of BX 1200 14006 Tensar Geogrid 17,000.00 4,117.00 0.00 0.00 4,1 17.00 24.22 12,883.00 411.70 1400H 350 CY of #2 Stone 8,200.00 5,718.00 0.00 0.00 5,718.00 31.42 /.1 12,482.00 571.80 AIA Document G703 -1992. Copyright 1963, 1965, 1966, 1967,1970, 1978, 1983 and 1992 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this Ale Document, or any portion of it, may result in severe civil and criminal penalties, and will be 1 prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 10:56:48 on 0612112010 under Order No.0168420739_1 which expires on 05/10/2011 and is not for resale. User Notes: (1734900042) A B C D E F G H I WORK COMPLETED TOTAL MATERIALS COMPLETED BALANCE TO RETAINAGE ITEM. DESCRIPTION OF SCHEDULED FROM PRESENTLY NO. WORK VALUE PREVIOUS STORED AND STORED TO (G C) FINISH (IF VARIABLE APPLICATION THIS PERIOD DATE (C G) RATE) (D E) (NOT IN D OR E) (D +E +F) 1400J 200 CY of 953 Stone 10,000.00 1,746.00 0.00 0.00 1,746.00 17.46% 8,254.00 174.60 1400K General Allowance 75,000.00 50,000.00 0.00 0.00 50,000.00 66.67% 25,000.00 5,000.00 CAD As -Built 1400L Allowance 5,000.00 5,000.00 0.00 0.00 5,000.00 100.00% 0.00 500.00 General Clean Up 01560 M 4,000.00 1,100.00 300.00 0.00 1,400.00 35.00%1 2,600.00 140.00 01561 General Clean U L 25,000.00 9,300.00 2,000.00 0.00 11,300.00 45.20%1 13,700.00 1,130.00 Final Cleaning (Items 01562 in BP 5010 10,000.00 0.00 0.00 0.00 0.00 0.00% 10,000.00 0.00 Dewatering for 9 02110 Months -M -Eq 18,500.00 18,500.00 0.00 0.00 18,500.00 100.00% 0.00 1,850.00 Dewatering for 9 02111 Months L -Eq 28,000.00 28,000.00 0.00 0.00 28,000.00 100.00%1 0.00 2,800.00 Piping from Tri -Plex 02240 to Lift Station 21,000.00 21,000.00 0.00 0,00 21,000.00 100.00% 0.00 2,100.00 Interior Metal Fabrications 05504 Submittals 6,200.00 6,200.00 0.00 0.00 6,200.00 100.00% 0.00 620.00 Interior Metal Fabrications 05505 Materials 86,500.00 86,500.00 0.00 0.00 86,500.00 100.00%1 0.00 8,650.00 Interior Metal 05506 Fabrications- Erection 24,000.00 24,000.00 0.00 0.00 24,000.00 100.00 0.00 2,400.00 Miscellaneous Metals 05511 -M 5,640.00 5,640.00 0.00 0.00 5,640.00 100.00 0.00 564.00 Miscellaneous Metals 05512 -L 2,500.00 2,500.00 0.00 0.00 2,500.00 100.00 0.00 250.00 Interior Rough 06100 Carpentry M 28,000.00 22,400.00 4,200.00 0.00 26,600.00 95.00% 1,400.00 2,660.00 Interior Rough 06101 Carpentry L 36,500.00 27,400.00 7,200.00 0.00 34,600.00 94.79% 1,900.00 3,199.50 07810 Skylighht. Shade M 62,000.001 62,000.00 0.00 0.00 62,000.00 1.00`00 0.00 6,200.00 AIA Document G703 `TM 1992. Copyright 1963, 1965, 1966, 1967,1970, 1978, 1983 and 1992 by The American Institute of Architects. All rights reserved. WARNING: This Ale Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be 2 prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 10:56.48 on 0 6/2 11201 0 under Order No.0168420739_1 which expires on 05/1012011, and is not for resale. User Notes: (1734900042) A B C D E F G H I WORK COMPLETED TOTAL MATERIALS COMPLETED BALANCE TO RETAINAGE ITEM. DESCRIPTION OF SCHEDULED FROM PRESENTLY NO. WORK VALUE PREVIOUS STORED THIS PERIOD AND STORED TO (G W C} FINISH (IF VARIABLE APPLICATION (NOT IN D OR E) DATE (C G) RATE) (D E) (D +E +F) Skylight Shade 07811 Installation 29,500.00 29,500.00 0.00 0.00 29,500.00 100.00% 0.00 2,950.00 07910 Joint Sealants M 48,000.00 7,600.00 0.00 0.00 7,600.00 15.83% 40,400.00 760.00 079.11 Joint Sealants L 24,500.00 4,200.00 0.00 0.00 4,200.00 17.14% 20,300.00 420.00 08810 Interior Glazing 42,000.00 840.00 0.00 0.00 840.00 2,00% 41,160.00 84.00 09610 Access Flooring 19,500.00 0.00 0.00 0.00 0.00 0.00% 19,500.00 0.00 09710 FRP Wall Panels M 1,000.00 0.00 0.00 0.00 0.00 0.00% 1,000.00 0.00 09711 FRP Wall Panels L 2,000.00 0.00 0.00 0.00 0.00 0.00 2,000.00 0.00 Acoustic Fabric 09712 Wrapped Panels 42,500.00 10,000.00 0.00 0.00 1.0,000.00 23,53%1 32,500.00 1,000.00 10210 Toilet Compartments 44,000.00 0.00 0.00 0.00 0.00 0.00%1 44,000.00 0.00 Backfold Door 10220 Tracks M 5,000.00 5,000.00 0.00 0.00 5,000.00 100.00 0.00 500.00 Backfold Door 10221 Tracks- L 4,560.00 4,560.00 0.00 0.00 4,560.00 100.00 0.00 456.00 10222 Operable Partition 21,000.00 3,200.00 0.00 0.00 3,200.00 15.24%1 17,800.00 320.00 10223 Wire Mesh Partitions 9,500.00 0.00 0,00 0.00 0.00 0.00% 9,500.00 0.00 Toilet Accessories 10224 M 34,000.00 34,000.00 0.00 0.00 34,000.00 100.00% 0.00 3,400.00 Toilet Accessories 10225 L 28,000.00 1,000.00 0.00 0.00 1,000.00 3.57% 27,000.00 100.00 10510 Metal Lockers 16,500.00 0.00 0.00 0.00 0.00 0.00%1 16,500.00 0.00 10520 Phenolic Lockers M 110,000.00 0.00 0.00 0.00 0.00 0.00%1 1 10,000.00 0.00 10521 Phenolic Lockers L 29,000.00 0.00 0.00 0.00 0.00 0.00% 29,000.00 0.00 10610 Corner Guards M 9,500.00 0.00 9,500.00 0.00 9,500.00 100.00% 0.00 0.00 10611 Corner Guards L 3,500.00 0.00 0.00 0.00 0.00 0,00% 3,500.00 0.00 17001 Changr Order No. 01 81,040.00 80,000.00 0.00 0.00 80,000.00 98.72% 1,040.00 8,000.00 GRAND TOTAL $1,398,960.00 $683,185.00 $28,400.00 $0.00 $711,585.00 50.87 $687,375.00 $69,948.00 AIA Document G703T 1992. Copyright 1963, 1965, 1966, 1967,1970, 1978, 1983 and 1992 by The American Institute of Architects. All rights reserved, WARNING: This Ale Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be 3 prosecuted to the maximum extent possible under the law, This document was produced by AIA software at 10:56:48 on 06/21/2010 under Order No.0168420739_1 which expires on 05/10/2011 and is not for resale. User Notes: (1734900042) AFFIDAVIT AND WAIVED. OF LIEN ]FINAL X PARTIAL PAYMENT TO FOLLOW State of Indiana, County of Madison SS Bradley A. Tyler being duly sworn states that he is the Project Manager of W. R. Dunkin Son, Inc. having contracted with City of Carmel Redevelopment Commission to furnish certain materials and /or labor as follows: Bid Package 5010 Interior Finishes for a project known as Parcel 7A, Carmel Regional Performing Arts Center located at Carmel, Indiana and owned by City of Carmel and does hereby further state on behalf of the aforementioned Contractor. Application for Payment 13 has been received for work performed through 03/31/10. (PARTIAL WAIVER) that there is due from the contractor the sum of Thirty -six Thousand Six Hundred Seventy- seven dollars and 00 /cents 36,675.00 Application for Payment has been received for work performed through (FINAL WAIVER) that the final balance due from the Owner is the sum of dollars and 00 /cents THEREFORE, the undersigned waives and releases unto the Owner of said premises, any and all lien or claim whatsoever on the above described property and improvements thereon on account of LABOR or material or both, furnished by the undersigned thereto, subject to limitations or conditions expressed herein, if any; and further certifies that no other party has any claim or right to a lien o ac of a war. performed or material furnished to the undersigned for said pr Je d zdl pe of his a avft W. R. Dunkin Son, Inc. Title: Project Manager WITNESS MY HAND AND NOTARIAL, SEAL, this 1.6 day of June 1 2010 (Notary P ic) My Commission Expires: January 08, 2017 Printed Martha A. Carpenter Residing in Madison County Prescribed by State Board of Accounts ACCOUNTS PAYABLE VOUCHER City Form No. 201 (Rev, 1995) CITY OF CARMEL An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc. Payee jU�Kl� Sa /rac Purchase Order No. �6) 6aX 22 `/7 Terms n //("l Date Due Invoice Invoice Description Amount Date Number (or note attached invoice(s) or bill(s)) Total I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited same in accordance with IC 5- 11- 10 -1.6. 20 Clerk- Treasurer VOUCHER NO. WARRANT NO. ALLOWED 20 �a���'� �;5�� ILaC IN SUM OF 22{7 ON ACCOUNT OF APPROPRIATION FOR Board Members PO# or INVOICE NO. ACCT /TITLE AMOUNT DEPT. 1 hereby certify that the attached invoice(s), or X02 bill(s) is (are) true and correct and that the materials or services itemized thereon for which charge is made were ordered and received except 20 /G �Ignature rNractor of Redevelopment Title Cost distribution ledger classification if claim paid motor vehicle highway fund