HomeMy WebLinkAbout2010 Annual Report letter 03-01-10 I h F t F .Y 3 4G
y
5
4 h
11 actin Mari Ma te ri a ls
a
h
Y- y ';',-..:',7„ 7 ;:'.,i'-'..`. t F i
In dia n a Dis
ti X 11405 North Pe nns yl vani a F
Su ite 25
Carm IN 4603 ya'
Telephon (317).57 446
J1^. Jl A tl1
F 317) 573 Y
'R ECEDE®
N\
Mar '15t, 2 010
s
Mr M i k e Hollibaugh fi n s
t
Director, D of`Community
'',5-',..,':.7:' C ity :of C City Hall
One Civ Sq uare
Carmel, I ndiana 46032
R E Annual Re port Letter
Dear M Ho
The _fo llowing items are include w ith the submi of• our a report
A c opy of our up d ated SP CC P No Mueller South prope
r,
'7,', An updated, a erial p to; se rve:as a m ining' progress report m t
A
Mu e l l e r Propert 04040 024SU 05 .0803003
U
a
The mini act9 th`e T Mueller S outh pr o p erty during 2 included t he r aw,:ma t er i a l
that was e xcavated f or th cr relocation be tra n s p ort e d to C ar m el S fo
p roce ssing additiona cubic yds of s an d and gravel was transport i8 the.Nort
{ridi oper for into ab filltype pro
C lea ring o f trees, b e gan J a n uary 5 t h 2 009 f Blue Wood Cre relocation The cree
r was fi n is hed In Sep an include a City of'Carmel Engineers, v isit on
'9/30/09 l
T he North' In d ian apolis sit continue e a contr =to provide s tre e t s we e ping
t w i ce daily` i and aro und the entranc ar o the 96 th Stree t; site Additionally `t plant
w ills b e purch asin g their own u nit to m a intain;i n plant ro adw a ys {Quotes bei received}
•'Durin February '''.7`. :2009 the M u e ller South p rop e f r ty berm wase x ten d e d a long H a ze l Dell
�Parkwa s eeding fini during t h e month,o
Caution sig n a ls w ere ins talled along 1 06 th s t r eet t o, provid a ddition a l. safety;during lines
tr m fro M u eller South.property t the no rth side of 1, 06 th street
The blasting.,, pro at No rth Indian h be co refine_ d. t a
cooperative •effort with Vlbra Tech, Austin P and. Marie han i n :Blas
s eq u encing;, increased b u rden on the "front row holes, and s shot s are'a part o
'the effort to m inimi ze blasting noise a neig disturbance:
1
Page 2.
March 1 2010.
Quarterly _m'eetings have been initiated between Martin Marietta and Kingswood
homeowners to exchange' information and improve neighbor. relations.
Water quality and water elevation monitorin have;:been on oin on the Mueller. properties,
erties
q Y g 9 9 p p
since 2003 based '.on the monitoring; plan `prepared by aquaFusion. Quarterly reports
summarizing water elevations and annual reports summarizing: quality sampling results area submitted to John Duffy Currently 13wells and three groundwater sources are monitored.
Each time. Spill Prevention Control andx Countermeasures Plans for_ the North Indianapolis
or Carmel Sand operations are updated,, revised copies'are submitted to .Mr. Duffy and the
other agencies designated inthe Commitments
Fencing, wasr installed on, the''Mue,Iler South property during _,October, 2009. The fence
encompasses `approxirrmate: permit boundary'limits for the south property.
Mueller Property North- 050:10021SU
The Carmel Sand Plant primarily operated four 10 hour`, production shifts Monday
through Thursday during 2009... Seasonal shutdown `occurred ,12/11 /09.
Customer service hours were lam to 4:30pm Monday through Friday and 8am to 12pm
on Saturday during the loading season:
r
Mine progession advanced'`, south from the existing lake apps
approximately 50ft during the
past year: 5
A portion- of the existing fence was_ relocated during ..November, 2009 to reflect the
existing permit modifications 'that provided parcels of ground to the adjoining
Kingswood property owners.
If you require additional information feel 'free to contact meat:317 -573 4.460.
Sincerely,