HomeMy WebLinkAbout2nd Bldg Addition 10-06-10KEELER -WEBB ASSOCIATES
09 -30 -2010
City of Carmel
Technical Advisory Committee Members
Re.:
Consulting Engineers Planners Surveyors
TELEPHONE (317) 574 -0140 www.keelerwebb.carn
486 Gradle Drive
Carmel, Indiana 46032
Building Addition to Korean Presbyterian Church of Indianapolis, IN Inc.
1020 East 101st Street
Indianapolis, Indiana
KWA Project No. 1009 -039
Respectfully,
KEELER -WEBB ASSOCIATES
11,0
Adam DeHart, LS
Project Manager
PROJECT NARRATIVE
Keeler -Webb Associates is acting as agent surveyor /engineer for Mr. Kerry Wagoner with Nazareth
Building Services (general contractor) for Korean Presbyterian Church of Indianapolis, IN Inc.
(owner /tenant). We are proposing the construction of a new 1,045 sq. ft. classroom addition on
the north side of the existing building. A separate building addition was approved earlier this year
and is currently under construction, under BZA docket no. 10070002 SUA. The 8.68 acre property
is zoned R -1 and also lies in the Homeplace District.
All utilities are currently available on the site or in the adjacent easements along the 101 Street
extension. The project is currently served by phone, power, water and sewer. Storm water will
continue to sheet flow across the site to the NW corner of the property then flow overland to the
Barrow pit on the property to the East. Members, visitors, and employee owned vehicles will enter
the site from the existing driveway on 101 Street. Privately owned vehicles will park in the existing
parking spaces provided and deliveries will be made to the West side of the existing building.
Construction is planned to begin immediately upon approval by all appropriate agencies with the
intention of completing the building addition in spring 2011. The design of the facility will meet
requirements set in local and state building codes and will not be a fire hazard to the public. All
architectural features of the new addition will match the existing structure.
The installation of this building addition will not impact the local school system, since there are no
dwelling units involved in this project. There is sufficient capacity in the utility services available to
this site as well as parking for the members and visitors. No off -site improvements or upgrades will
be necessary to construct or operate this facility.
This project is being submitted for your review and comment.. If there are any questions or
concerns, please do not hesitate to contact us at any time.