Loading...
HomeMy WebLinkAboutCorrespondence mil H WEIHE. 4_,,, ENGINEERS ,r" F e .and Surveying [Civil ngin erin till Landscape Archaecture y Build with confidence.” y TRANSMITTAL To: City of Carmel Project: Sanctuary at 116 Street Sec. 1, 2A, and 4A One Civic Square Job W06 -0882 Carmel, IN 46032 Phone: 317- 571 -2417 Attu: Angie Conn Fax: 317 571 -2426 Date: 173x09 141,1 oq Re: Recorded Final Plat Sec. 1, 2A, and 4A We are sending you Attached Under separate cover via Hand the following items: Shop Drawings Prints Copy of Letter Product Data Specifications Meeting Minutes Samples Change Order(s) Inspection Report Sketches/Drawings Application(s) for Payment Sets Document Document Description Copies Date Number 1 Mylar Copy 2 Paper Copies 1 Digital Copy These are transmitted as indicated below: Approved For Your Review or Use Approved as Noted For Your Review Comment Not Approved, Revise and Resubmit As Requested Action Not Required For Your Records Action Indicated on Item Transmitted For Your Approval For Signature. Return Copies to Us Remarks: If you have any questions, please feel free to contact me at 317- 846 -6611 By: Andrew Miller cc: 10505 N. College Avenue Indianapolis. IN 46280 weihe.net 317 1 846 6611 800 452 6408 I Fax: 317 1 843 0546 Allan H. Weihe, P13., L.S. President Sanctuary at 116th Street Section 4A Page 1 of 1 Conn, Angelina V From: Brady Kuhn [KuhnB @weihe.net] Sent: Monday, August 18, 2008 2:35 PM To: Krueskamp, Theresa A Cc: Conn, Angelina V; Eric Carter Subject: Sanctuary at 116th Street Section 4A Attachments: Sanc 116th Sec 4A FinalPlat.dwg Ms. Krueskamp, Attached you will find a CAD file of the Sanctuary at 116th Street Section 4A Final Plat. Thank you, W `I E ENGINEERS -and Sure sing i Civil Erwirtua nia Lan a Ar;l :eclur r3 etri n h o i,tizlG Brady Kuhn, PLS Director, Land Surveying Weihe Engineers, Inc. 10505 N. College Avenue Indianapolis, Indiana 46280 317 1 846 6611 800 1 452 6408 317 1 843 0546 iLy 317 1 654 8829 ce11 weihe.net This message and any files transmitted with it are confidential, may contain privileged information which is intended solely for the receipt, use and benefit of the intended recipient of this email. If you are not the intended recipient, be advised that dissemination, distribution, printing or copying of this message is strictly prohibited and may result in legal liability on your behalf. If you receive this message in error, or are not the named recipient, please notify the sender at either the email address or telephone number above and delete this email from your computer. Thank you. «Sanc 116th Sec 4A FinalPlat.dwg» 8/18/2008 Page 1 of 1 Donahue Wold, Alexia K From: Conn, Angelina V Sent: Monday, August 04, 2008 12:26 PM To: 'Eric Carter' Cc: Steve Broermann; Ed Fleming; Donahue -Wold, Alexia K; Littlejohn, David W; Jim Shields Subject: RE: Sanctuary at 116th Street, Sections 1, 2A, 3, and 4A Yes, I think that should be okay. Angie Conn, Planning Administrator Dept. of Community Services Planning Zoning 1 Civic Square, 3rd Floor City of Carmel, IN 46032 p. 317 -571 -2417 f. 317- 571 -2426 aconn @carmel.in.gov From: Eric Carter [mailto:cartere @weihe.net] Sent: Monday, August 04, 2008 12:24 PM To: Conn, Angelina V Cc: Steve Broermann; Ed Fleming; Donahue -Wold, Alexia K; Littlejohn, David W; Jim Shields Subject: RE: Sanctuary at 116th Street, Sections 1, 2A, 3, and 4A They should be constructed at 5' wide. Steve Broermann contacted Carmel about it couple months ago and we forwarded it to the contractor. Our As- builts will have the sidewalk change, if that is acceptable. See attached email about the change Eric Original Message From: Conn, Angelina V [mailto:Aconn @carmel.in.gov] Sent: Monday, August 04, 2008 12:10 PM To: Eric Carter Cc: Steve Broermann; Ed Fleming; Donahue -Wold, Alexia K; Littlejohn, David W Subject: Sanctuary at 116th Street, Sections 1, 2A, 3, and 4A Hi Eric I looking at the construction plans for all 4 sections, the only thing that really stuck out on the construction plans was the sidewalk width on the street details. It shows a minimum 4.5 feet wide, and the subdivision control ordinance section 8.09 requires 5 -ft wide sidewalks. Please revise the plans or you can seek plan commission approval of a waiver for sidewalk width. Thanks, Angie Conn, Planning Administrator Dept. of Community Services Planning &Zoning 1 Civic Square, 3rd Floor City of Carmel, IN 46032 p. 317- 571 -2417 f. 317- 571 -2426 aconn @carmel.in.gov 8/5/2008 Page 1 of 1 Donahue -Wold, Alexia K From: Donahue -Wold, Alexia K Sent: Monday, August 04, 2008 11:29 AM To: Eric Carter; Steve Broermann; 'Ed Fleming' Cc: Conn, Angelina V Subject: Sanctuary at 116th Street, Sec. 4A Hello, Below are Department of Community Services' review comments for the Sanctuary at 116th Street, Sec. 4A. Petitioner, please complete the following: 1.) Please separate all D. &U.E.s from the Landscape Easements. A landscape easement cannot exist within a D. &U.E. 2.) All lots must have a minimum frontage at the street right -of -way of at least 50 feet (SCO 6.05.01). Please adjust the plat accordingly to ensure that lots 125 and 126 have a minimum frontage of at least 50 feet. 3.) Please add the appropriate monument/marker at the eastern corner of lot 130 as none is currently shown. 4.) Please add docket numbers 06090009 SP, 78 -03 PP Amend, and 78 -03a SW 78 -03e SW to the plat. 5.) Fill in all of the instrument numbers on the plat. 6.) Provide a separate copy of the subdivider agreement form, found in the Subdivision Control Ordinance (SCO), Chapter 9.06. 7.) Provide a copy of the covenants /restrictions, if there are any. 8.) Please expand the Key Map on sheet 2 to show this site in relation to the surrounding uses, including the nearest major road intersections. 9.) Add the date of submission or latest revision to the plat. 10.) Please provide a copy of the landscape plan and tree preservation plan to our Dept and to the City Forester. 11.) On sheet 1 add the zoning to the BSL requirements: S -1 /Residence ROSO with subdivision waiver. 12.) Only show the plan commission certificate and registered land surveyor's certificate on the signature page. Remove duplicates on the other sheets. 13.) Please add the date to the Surveyor's Signature. 14.) Additional comments may be made after the requested revisions have been submitted. 15.) Please submit a revised Secondary Plat after making the above mentioned changes. Once we have reviewed the revised Secondary Plat we will request a Mylar copy for signature by this Department; the property owner and surveyor must sign the plat prior to the Director signing it. Two paper copies of the plat must be filed with the Mylar prior to recording, and two paper copies and a Mylar of the recorded plat must be submitted following recording. Our approval of the secondary plat (signature) will be forthcoming upon revision of the plans according to the items listed above. 16.) Also, the staff has been advised that we cannot present a Secondary Plat to the Director for signature from this point forward until Ms. Terry Krueskamp (trueskamp @carmel.in.gov) in Information Systems has received an e-mail with an electronic file attached (MicroStation .dgn is preferred, or AutoCad .dwg of the subdivision) and it (the e-mail) has been copied to myself (awold(c�carmel.in.gov). Thanks, Alexia Donahue Wold Planning Administrator City of Carmel, DOCS One Civic Square Carmel, IN 46032 317.571.2417 awold @carmel.in.gov NA Please consider the environment before printing this e-mail 8/5/2008 Donahue -Wold, Alexia K From: Greg Hoyes [grh @co.hamilton.in.us] Sent: Friday, August 01, 2008 2:20 PM To: Donahue -Wold, Alexia K Cc: Steve Broermann; Eric Carter; Jim Shields Subject: Fwd: RE: sanctuary at 116th street, Section 4A FCF FCIF AI abi 060883 A 060883 A nalPlat -Sheet 2.PDFnaIPIat-Sheet 1.PDF Alexia Weihe has made the change that I requested for the easements in Section 4A of Sanctuary. The revised plan is attached and we have no issues with the plat now. If you have any questions, please let me know. Greg Hoyes HCSO Plan Reviewer "Eric Carter" <cartere @weihe.net> 2:11 PM Friday, August 01, 2008 Greg, See attached. Have a good weekend Eric Original Message From: Greg Hoyes [mailto:grh @co.hamilton.in.us] Sent: Friday, August 01, 2008 2:02 PM To: Eric Carter Cc: Angelina Conn V (E- mail); Alexia Donahue -Wold; gduncan @carmel.in.gov; gilko @crossroadengineers.com; Steve Broermann (E- mail); Ed Fleming; Jim Shields Subject: RE: at 116th street, Section 4A Eric I do need some minor changes on the Section 4A plat. The SSDs under the rear yards swales are becoming part of the regulated drain system, so I need 30' wide easements for regulated drain. Looking this plat over, here are the changes I need: rear yard easement of lots 125,126, and 135 need to be increase from a 10' DU &SE to a 15' DU &SE. If you could change that and resend to be, I can let Carmel,DOCS know we are ok. Before Section 4B moves forward, you might want to go through and make the changes on that plat also. If you have any questions, please let me know. Greg Hoyes HCSO Plan Reviewer "Eric Carter" <cartere @weihe.net> 1:49 PM Thursday, July 31, 2008 Attached is section 4A. Original Message 1 From: Eric Carter Sent: Thursday, July 31, 2008 11:40 AM To: 'gduncan @carmel.in.gov'; 'wakers @carmel.in.gov'; 'whohlt @carmel.in.gov'; 'sbrewer @carmel.in.gov'; 'jduffy @carmel.in.gov'; 'mfogarty@carmel.in.gov'; 'dlittlejohn @careml.in.gov'; 'cellison @carmel.in.gov'; 'del @co.hamilton.in.us'; 'mwestermeier @carmel.in.gov'; 'jtl @co.hamilton.in.us'; 'grh @co.hamilton.in.us'; 'bmg @co.hamilton.in.us'; 'jason.kirkman @mybrighthouse.com'; 'shirley.hunter @duke- energy.com'; 'jennifer.marlett @veoliawaterna.com'; 'rfarrand @ccs.k12.in.us'; 'ryan.hartman @ctrwd.org'; 'troy.yackle @sug.com'; 'ron.morris @aes.com'; 'gilko @crossroadengineers.com'; 'dhuffman @carmel.in.gov'; 'dale.m.sparks @usps.gov'; 'cshupperd @vectren.com'; 'afoley @carmel.in.gov'; 'gary.mcnamee @duke energy.com' Cc: Angelina Conn V (E- mail); Steve Broermann (E- mail); Ed Fleming; Jim Shields Subject: FW: sanctuary at 116th street, sections 1, 2 and 3 Importance: High To all Carmel TAC members, Apparently Sections 1, 2 and 3 have not been filed for secondary plat application. We have been asked to file and work with each TAC member individually to get the plat approved. Applications will be sent to Angie separately. As most of you know, all three sections are built or in the process of being finished. We are requesting that you reply if you need a paper copy or will a PDF of the plat be acceptable for your review. We will need comments back to us prior to 8/8 so that we can make revisions to them and still make the BPW deadline of 8/13. If you have any questions or need additional information, please contact either myself or Ed Fleming. If you need Construction sets for this filing, please let us know. Section One and Section 2a is attached. Section 3 will follow in another email. Thank you Eric From: Hill, Dick B [mailto:DHill @carmel.in.gov] Sent: Wednesday, July 30, 2008 2:51 PM To: Conn, Angelina V; Duncan, Gary R Cc: Redden, Nick; Barnes, David R; Donahue -Wold, Alexia K; Steve Broermann Subject: RE: sanctuary at 116th street, sections 1, 2 and 3 We have approved construction plans for Sections 1, 2, 3 and 4A, accepted fees, accepted performance bonds and approved construction to commence. It was our assumption that the plat procedure had occurred but don't know that we would have known that. Also, given the history of this development, i.e. length of time that this development has been under review, change of engineers, change of developer, change from Hamilton County review authority to the City of Carmel and the various name changes over the years, I can understand confusion. From: Conn, Angelina V Sent: Wednesday, July 30, 2008 2:31 PM To: Duncan, Gary R Cc: Redden, Nick; Barnes, David R; Donahue -Wold, Alexia K; Hill, Dick B; 'Steve Broermann' Subject: sanctuary at 116th street, sections 1, 2 and 3 Gentleman 2 Steve Broermann of platinum properties hinted that the construction plans for these sections were already approved by your dept. is this true? We are a bit confused because they have not yet submitted secondary plat applications for these three sections... currently, they have apps on fie for sections 4, 5, and 6) They wanted to get their plats on the next bpw agenda, but we will have them submit the 3 secondary plat applications and have them work with each TAC member individually to get the plat approved. That way they are not delayed by having to attend the next scheduled TAC meeting. Also, Alexia will review the plat for section 4, to make sure no additional changes are required for the plat. Thanks, Angie Conn, Planning Administrator Dept. of Community Services Planning Zoning 1 Civic Square, 3rd Floor City of Carmel, IN 46032 p. 317 -571 -2417 f. 317- 571 -2426 aconn @carmel.in.gov 3 Page 1 of 1 Donahue -Wold, Alexia K From: Hill, Dick B Sent: Wednesday, July 30, 2008 2:51 PM To: Conn, Angelina V; Duncan, Gary R Cc: Redden, Nick; Barnes, David R; Donahue -Wold, Alexia K; 'Steve Broermann' Subject: RE: sanctuary at 116th street, sections 1, 2 and 3 We have approved construction plans for Sections 1, 2, 3 and 4A, accepted fees, accepted performance bonds and approved construction to commence. It was our assumption that the plat procedure had occurred but don't know that we would have known that. Also, given the history of this development, i.e. length of time that this development has been under review, change of engineers, change of developer, change from Hamilton County review authority to the City of Carmel and the various name changes over the years, I can understand confusion. From: Conn, Angelina.V Sent: Wednesday, July 30, 2008 2:31 PM To: Duncan, Gary R Cc: Redden, Nick; Barnes, David R; Donahue -Wold, Alexia K; Hill, Dick B; 'Steve Broermann' Subject: sanctuary at 116th street, sections 1, 2 and 3 Gentleman Steve Broermann of platinum properties hinted that the construction plans for these sections were already approved by your dept. is this true? We are a bit confused because they have not yet submitted secondary plat applications for these three sections... currently, they have apps on fie for sections 4, 5, and 6) They wanted to get their plats on the next bpw agenda, but we will have them submit the 3 secondary plat applications and have them work with each TAC member individually to get the plat approved. Thatway they are not delayed by having to attend the next scheduled TAC meeting. Also, Alexia will review the plat for section 4, to make sure no additional changes are required for the plat. Thanks, Angie Conn, Planning Administrator Dept. of Community Services Planning Zoning 1 Civic Square, 3rd Floor City of Carmel, IN 46032 p. 317- 571 -2417 f. 317 -571 -2426 aconn @carmel.in.gov 8/5/2008 Sanctuary at 116th Sidewalks Page 1 of 1 Conn, Angelina V From: Ed Fleming [FlemingE @weihe.net] Sent: Tuesday, June 03, 2008 4:14 PM To: sbuckler @valentiheld.com; MZielinski @valentiheld.com Cc: Eric Carter Subject: Sanctuary at 116th Sidewalks —ez� Gentlemen, 1 Please make note of the sidewalk change from Steve's email below. If you have any questions, please contact him direct. Thanks! Ed From: Steve Broermann Sent: Tuesday, June 03, 2008 10:23 AM To: Eric Simons; ibarratt@pittmanpartners.com; -Steve Pittman; Ken Brasseur Subject: Sanctuary Gentlemen I just spoke to Bob Dykstra with Carmel about the walks at Sanctuary 116. All sidewalks will need to be 5' wide per the latest Carmel Standards, not the 5.5' shown on some areas of the plans. Thanks Steve Broermann 8/4/2008 Page l of l Conn, Angelina V From: Eric Carter [cartere @weihe.net] Sent: Monday, August 04, 2008 12:24 PM To: Conn, Angelina V Cc: Steve Broermann; Ed Fleming; Donahue -Wold, Alexia K; Littlejohn, David W; Jim Shields Subject: RE: Sanctuary at 116th Street, Sections 1, 2A, 3, and 4A Attachments: Sanctuary at 116th Sidewalks They should be constructed at 5' wide. Steve Broermann contacted Carmel about it couple months ago and we forwarded it to the contractor. Our As- builts will have the sidewalk change, if that is acceptable. See attached email about the change Eric Original Message From: Conn, Angelina V [mailto:Aconn @carmel.in.gov] Sent: Monday, August 04, 2008 12:10 PM To: Eric Carter Cc: Steve Broermann; Ed Fleming;. Donahue -Wold, Alexia K; Littlejohn, David W Subject: Sanctuary at 116th Street, Sections 1, 2A, 3, and 4A Hi Eric I looking at the construction plans for all 4 sections, the only thing that really stuck out on the construction plans was the sidewalk width on the street details. It shows a minimum 4.5 feet wide, and the subdivision control ordinance section 8.09 requires 5 -ft wide sidewalks. Please revise the plans or you can seek plan commission approval of a waiver for sidewalk width. Thanks, Angie Conn, Planning Administrator Dept. of Community Services Planning Zoning 1 Civic Square, 3rd Floor City of Carmel, IN 46032 p. 317- 571 -2417 f. 317- 571 -2426 aconn@carmel.in.gov 8/4/2008 trim n ail Iii ii pl it 111 t ail ru° ISM CITY CAF RMEL R CENED July 29, 2007 JUL 3 1 2107 JAMES BRAINARD, MAYOR Mr. Steve Broermann Does Project Manager Platinum Properties, LLC 9757 Westpoint Drive Suite 600 Indianapolis, IN 46256 RE: Sanctuary 116 Street, Section 4- Project Review #2 Dear Mr. Broermann: The City has received your comment letter and drawings dated April 6, 2007 based upon the City review of December 1, 2006. The comments from the City review have been satisfactorily addressed with the following exceptions: CONSTRUCTION PLAN COMMENTS 13. All six sections of Sanctuary at 116 Street are shown on the cover sheet of the construction plans submitted for Section 4. As a result, the drawing is so small that there is very little detail and the text can't be read. Please show just the section to which this particular set of plans pertains (Section 4) and show this section at a much larger scale. Thank you for your response. If it is desired to indicate the other sections, please providing shading or light hatching (perhaps along the limits of the section), make the text legible and shade back the text referencing the other sections. 22. Please include the note "THERE SHALL BE NO WATER VALVES OR MANHOLES WITHIN THE PAVEMENT, CURBS, SIDEWALKS, OR ASPHALT PATHS" on all appropriate sheets. Did not find the note on Sheet C301. 28. Thank you for your response. The Department has previously agreed to the layout per the approved preliminary plat. However, the cul-de -loop streets shall be a minimum of 20.5 feet wide (0.5 foot straight curb, 18.0 feet asphalt, 2.0 feet roll curb). The additional width needed for the additional street width shall be taken from the common area, not from the grass strip right -of -way between the street and the sidewalk. 31. Sidewalks are required on both sides of all streets. Thank you for your response. Please confirm with DOCS if a waiver of the subdivision requirements is required for walk on one side only. 32. Common areas are not permitted within the right -of -way. Common areas are still indicated within the areas enclosed by the cul- de- loops. Based on further review, the City provides the following comments: 1. General a. Please provide the requisite storm water /drainage information required by Section 100 of the Storm ,Water Technical Standards Manual on the plan sheets. b. Please verify if a complete Plan Certification from has been provided for this project? 2. Sheet C001 a. Please delete the "Indianapolis Department of Metropolitan Development" information. b. The Soils Map does not indicate the soil types. Please hatch the Section Four area. c. The Vicinity Map is not legible. DEPARTMENT OF ENGINEERING ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439 EMAIL engineering @carmel.in.gov Mr. Steve Broermann July 29, 2007 RE: Sanctuary 11• Street, Section 4- Project Review #2 Page 2 of 5 d. There is no indication of the site on the Site Location Map. The 121' Street and 116 Street labels are incorrect. 3. Sheet C101 a. General Demolition Plan Note 9 references "Lawns and Grasses" section of the Project Manual. This note shall be deleted and replaced with "In accordance with City Standards and /or as directed by the Urban Forester." b. Keynote 1 was not evident on the plan sheet. c. Please add Note 12 as follows: "No earth disturbing activity may commence without an approved storm water management permit." d. No tree protection fence is indication on the plan sheet. Please indicate all existing trees within this section and indicate tree protection fence at the drip line of the trees. e. Please add Demolition Key Note 2 to require existing pavement to be sawcut to a clean edge. Please add this keynote reference to all existing/proposed pavement interfaces at the limits of Section 4 and the existing roadways. 4. Sheet C102 a. Please indicate "Road Ends" barriers at the western limit of Eagleridge Lane and the northern limit of Mannings Pass. b. Please extend the existing walk within the right -of -way of Eagleview Drive across Eaglerun Way (across the center island) and add ADA ramps as needed. The proposed walk of Eaglerun Way shall intersect perpendicularly, not curvilinear as indicated. c. Please extend the existing walk within the right -of -way of Eagleview Drive across Eaglecrest Place (across the center island) and add ADA ramps as needed. The proposed walk of Eaglecrest Place shall intersect perpendicularly, not curvilinear as indicated. d. Please extend the existing walk within the right -of -way of Eagleridge Lane so it crosses Eagleridge Drive and and add ADA ramps as needed. The proposed walk of Eagleridge Drive shall intersect perpendicularly, not curvilinear as indicated. e. Please add Note 9 to Sitework General Notes as follows: "The Contractor shall contact the Department of Engineering to schedule a pre construction meeting to review the Department's construction requirements, staff notification requirements, required inspections for certain stages of the work and to review the authority of the Department as it relates to work within the existing and proposed City right -of- way." f. Please revise Keynote 2 to reference Combined Curb and Gutter Type III (see Carmel Detail 10 -12). g. Is the path indicated by Keynote 5, to be designed by others, being installed by other sections? h. Please revise Keynote 3, which reads "Detail PV -13" to read "Details on Sheet... 5. Sheet C103 a. Please provide "M.E." spot elevations where proposed pavement meets existing pavement. b. The swales behind Lots 110 -113 and 137 -142 exceed the standard of a maximum of 3 lots or 300 -feet. c. Will the proposed grading behind Lots 137 -142 and 110 -113 result in loss of existing trees? d. Is it possible to achieve the intent of the note to "Fill low point to drain to structure 2727 Please design this to ensure that this work is possible and meets City standards for slopes and swales, etc. e. Please indicate multi -use path on this sheet along the western boundary. f. Grading Note 5 shall be revised to meet City Standards. g. Grading Note 8 indicates "Fill material compacted to specifications To which specifications does this note refer? Mr. Steve Broermann July 29, 2007 RE: Sanctuary 116` Street, Section 4- Project Review #2 Page 3 of 5 h. Please verify that Grading Note 9 is acceptable to the Urban Forester. i. This plan in general is difficult to read. j. Please add the following notes to this sheet: i. "The Contractor shall contact the Department of Engineering to schedule a pre construction meeting to review the Department's construction requirements, staff notification requirements, required inspections for certain stages of the work and to review the authority of the Department as it relates to work within the existing and proposed City right -of- way." ii. "No earth disturbing activity may commence without an approved storm water management permit." 6. Sheet C104 a. Are any open pavement cuts of existing pavement required? b. Will Structure 4716 conflict with future drive location? c. There is random text indicated in the Section 1 area of this sheet that do not appear to reference anything. d. Please indicate sub surface drain under the center islands of the cul- de- loops. The sub- surface drains on the outside curb edges are too far apart to be effective at draining the subgrade of the entire area. e. The legend does not clearly indicate the sub surface drain required under the curbing. f. Is this plan intended for use in the installation of the sanitary sewer and water service laterals for this section? If so, the City's cover and backfill policy for these laterals shall be added to this sheet. g. Please add the following notes to this sheet: i. "The Contractor shall contact the Department of Engineering to schedule a pre construction meeting to review the Department's construction requirements, staff notification requirements, required inspections for certain stages of the work and to review the authority of the Department as it relates to work within the existing and proposed City right -of- way." ii. "No earth disturbing activity may commence without an approved storm water management permit." iii. If any utilities are required to be relocated for the work, such work shall be the sole responsibility of the developer. If power poles are required to be relocated in the City right -of -way, such poles shall be located 1 -foot from the back edge of the proposed right -of -way. h. The City requires sub surface drains to be installed in all rear yard swales. 7. Sheets C210 -0203 a. On each sheet, please update the minimum cover for pipe crossings of City Streets with the following note: "For installation of Storm Mains, Water Mains, Sanitary Mains, Water Service Laterals, Sanitary Service Laterals under City streets, regardless of the jurisdiction of the utility, the minimum cover from the top of the installed pavement to the top of the installed pipe shall be the pavement section thickness (all bituminous and aggregate material above the subgrade) plus 1 -0 but under no circumstances shall the cover along any part of the pipe from the final pavement elevation to the top of the pipe be less than 2.5 -feet. If the standard practice of the utility that has jurisdiction over the installation has a more stringent cover requirement, the more stringent requirement shall govern. Cover heights for reinforced concrete pipe storm sewer that are less than those required will be evaluated on a case by case condition and approved only with written permission by the city engineer." b. On each sheet, to what does Plan and Profile Note 3 refer? c. On each sheet, please verify Note 4 with the Urban Forester. d. On each sheet, please delete the note "Granular Backfill. See Note 8" from the legend. Mr. Steve Broermann July 29, 2007 RE: Sanctuary 116`' Street, Section 4- Project Review #2 Page 4 of 5 e. Sheet C203. The Mannings Pass profile is missing a pipe crossing. 8. Sheet C204 a. Please delete detail PV -13 and replace with the City Standard Details for ADA ramps. b. Please delete Detail PV -3. c. Please indicate a 5 -foot maximum contraction joint on radii on Detail PV -33. 9. Sheet C205 a. Please delete Detail 10 -13. b. Please delete Detail 10 -16. c. Is the road cut patch detail necessary? 10. Sheet C301 -C303 a. Please delete the City of Carmel Standard Backfill notes on each sheet. b. On each sheet, please delete Note 9 and replace with: "Refer to Detail D -23, Sheet C306, for trenching, backfill and cover requirements." c. On each sheet, please revise Note 8 to read: "Full depth granular backfill per Detail D -23, Sheet C306 shall be..." 11. Sheet C305 a. Please delete "Storm Specs City of Carmel Backfill and Cover" notes. 12. Sheet C306 a. Please include County Swale with SSD detail. 13. Sheets C401 -C403 a. On each sheet, please delete City of Carmel Standard Backfill Notes for Storm Sewers notes. b. On each sheet, please update the minimum cover for pipe crossings language with the most current language per Item 7a of this letter. c. On each sheet, please delete duplicate plan certification notes. d. On each sheet, please revise "Granular Backfill' to read "Granular Backfill per note on this sheet." 14. Sheet C404 a. Please add text to the details "Sanitary Sewer Bedding and Backfill' and "Service Lateral" requiring cover and backfill to be per City Standards on Sheet C405. 15. Sheet C405 a. Please add the most current Sanitary Main and Lateral cover and backfill language to this sheet. 16. Sheet C504 a. Please revise the title of this sheet to read" Sanitary Sewer Specifications Sheet 17. Sheet C601 a. The posted speed limit shall be 25 -mph; not 30 -mph. b. Are the cul -de -loops one -way? If so, additional signage shall be indicated. If not, additional stop signs shall be indicated. 18. Sheets C701 -C702 a. On each sheet, please revise the note "No valves will be permitted under pavement" to include "walks, path and curbing." Mr. Steve Broermann July 29, 2007 RE: Sanctuary 116` Street, Section 4- Project Review #2 Page 5 of 5 b. On each sheet, please update the minimum cover note. c. Please revise General Note 12 on each sheet to require granular backfill per City Standards. These comments represent the Department of Engineering's second review of the construction plans for this project. We request that all responses to our comments be provided in writing. Failure to provide written responses may result in the delay of the review process. It is critical that this office be made aware of all modifications made on the plans being re- submitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans including all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, BZA or other committee meetings. All bonds and performance guarantees must be posted prior to Engineering Department approval of construction plans. Board of Public Works and Safety approvals and any other governing agency approvals (if required) must be obtained prior to Engineering Department approval. All performance guarantees must be posted prior to submission of secondary plats for Board of Public Works and Safety approval. The Department reserves the right to provide additional comments based upon subsequent reviews. If you have questions, please call me at 571 -2441. Sincerely, ca .E. Assistant ity En 7 eer Department of Engineering Cc: Angie Conn, Department of Community Services John Duffy, Director Cannel Utilities Paul Pace, Carmel Utilities Distribution Greg Iiko, Crossroad Engineers Greg Hoyes, Hamilton County Surveyor's Office Engineering Department Review/File Copy S:\PROJREVO7\SANCTUARY@ 1 16STREETSECTON 4 #2 0 °MC S r dr: 4. y ii iii ii n ii iii li p CI +r 0 ARMEL December 1, 2006 JAMES BRAINARD, MAYOR Mr. Paul Shoopman, President Indiana Land Development Corporation 8170 Zionsville Road o Indianapolis, IN 46268 RE: Sanctuary 116 Street, Section 4 Project Review #1 Dear Mr. Shoopman: Plans were submitted for this subdivision section for the September 20, 2006 Technical Advisory Committee meeting, but the City received more legible and complete plans on November 8, 2006. We offer the following comments: GENERAL INFORMATION 1. The project site is located within current City of Carmel Corporate Limits. 2. Jurisdictions: Streets and Right of Way City of Cannel (Interior Streets) Water City of Carmel Utilities Service Area (previously Veolia Indianapolis Water) Sanitary Sewers Clay Township Regional Waste District Service Area Storm Sewers/Drainage Hamilton County Surveyor's Office /City of Carmel. Legal Drains Hamilton County Surveyor's Office. 3. Board of Public Works and Safety Requirements: Water Availability- approval from the Board is based upon the total number of single family residential lots. Reference item #11 below for a more detailed explanation. If a community swimming pool or bathhouse is planned, additional Water Availability approval from the Board will be required and additional Water Connection Fees will be assessed. If entryway or other community irrigation systems are planned, these will also require additional Water Availability approval from the Board and additional Water Connection Fees will be assessed based upon the size and usage of the system. Commercial Curb Cut Approval If applicable, provide a letter to this office requesting PWS Commercial Curb Cut approval. Provide an 8 x 11 exhibit or exhibits detailing the requested curb cut(s) with all appropriate dimensional data including width, radii, acel/decel/passing blister dimensions, existing and opposing streets or drives, etc. It does not appear that this is a requirement for this section. Temporary Construction Entrance approval if the location is at a site other than the location of the proposed permanent entrances to the development. Any permanent improvement to be installed within dedicated right of way or dedicated easements. This approval would require a Consent to Encroach Agreement between the Owner and the City of Carmel. Secondary Plat approval. Dedication of Right of Way if not platted. DEPARTMENT OF ENGINEERING ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAx 317.571.2439 EMAIL engineering @carmet.in.gov I am also enclosing a schedule for Board of Public Works and Safety meeting dates and agenda deadlines for your use. Please use the Engineering Department deadlines for submissions to the Board. Any submission to the Board requires prior approval by the Carmel Clay Plan Commission and/or the Board of Zoning Appeals (if applicable) and completion of review by the Technical Advisory Committee. All written requests to be placed on the Board's agenda must include the appropriate Docket Number and the date (or dates) of approval by the Plan Commission and/or the Board of Zoning Appeals (if applicable). 4. T.A.C. Review/Drawings submitted for approval: We request that all comments and comment letters generated by this office be answered in writing and be accompanied by a drawing reflecting requested revisions. Final drawings will not be approved for construction until all Engineering Department and Utility Department and Hamilton County Surveyor issues have been resolved. The design engineer must certify all drawings submitted for final approval. Due to storm drainage dual jurisdiction with the Hamilton County Surveyor's Office, a total of 8 -sets of plans will be required for approval after all issues have been resolved. The drawings will be stamped as approved and will be signed by the City Engineer and Director of Carmel Utilities. The 8 -sets will then be delivered to the Hamilton County Surveyor's Office for approval. Final distribution will be 2 -sets to Carmel Engineering, 1 -set to Carmel Utilities, 2 -sets to the Surveyor's Office and 1 -set each to the Developer, the Developer's Engineer and the Developer's Contractor. 5. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated right of way or dedicated easements will require a Consent to Encroach Agreement with the City of Carmel. This agreement, with the exception of irrigation systems, requires BPWS approval. The City Engineer may approve irrigation system agreements. 6. Cannel Utilities will provide separate reviews of this project for water issues. Please assure that copies of all drawings are sent to: Paul Pace City of Carmel Water Utility 130 1s Avenue SW Carmel, IN 46032 7. Carmel Utilities does subscribe to "Holey Moley" who should be contacted directly for all water main locations. 8. I am including copies of the following with this correspondence: Subdivision Project Approval Procedures Performance Release Procedure Subdivision Building Permits Permit Data, Contacts, etc. Street Signage Requirements (will be provided at a later date) BONDING REQUIREMENTS 9. Upon initial review, it appears the following bonding requirements may apply to this project: Performance Guarantees/Engineer's Estimates Streets (base, binder and surface must be bonded together) Curb Gutters Water Mains Street Signs (See Item #12 below for additional comments regarding this item) Sidewalks (Interior- builders lot right of way sidewalks and Exterior common area/perimeter right of way sidewalks /asphalt paths may be bonded separately). Right of Way Improvements, if applicable, may be bonded separately. This could include accel/decel lanes, passing blister, pavement widening, thermoplastic striping, stone shoulders, curbs, etc. Erosion control. Please contact Amanda Foley, Engineering Department Stormwater Administrator, for details regarding engineer's estimates /performance guarantee requirements for Erosion Control. Please contact the Hamilton County Surveyor's office regarding their bonding requirements for Storm Sewers /Storm Drainage and Monument Markers. Please contact the Clay Township Regional Waste District for Sanitary Sewer requirements. The amount of the Performance Guarantee per City of Carmel requirements is based upon a certified Engineer's Estimate for 100% of the cost of labor and materials to construct the individual improvements, to be provided by the design engineer. Please provide detailed Engineer's Estimates for each improvement including quantities, unit costs, pipe sizes and materials, etc. Upon completion and release of individual Performance Guarantees, a three -year Maintenance Guarantee will be required. The Maintenance Guarantee amount is based upon 15% of the Performance amount for Streets and Curbs and 10% of the Performance amount for all other improvements. Performance Guarantees may be Performance or Subdivision Bonds or Irrevocable Letters of Credit. Please reference the enclosures for more detailed explanation of our procedures. Right of Way Permit and Bonding Any work in dedicated right of way will require an approved Right of Way Permit and a License Permit Bond. The bond amount is determined by the number of instances of work in the right of way at $2,000.00 per instance. However, if the work is included in the scope of work of a required and posted Performance Guarantee, the Performance Guarantee may be used to satisfy the bond requirements of the Right of Way Permit. Please contact our Right of Way Manager, Fred Glaser, to arrange right of way permitting and bonding, if applicable. 10. We have engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations submitted to this office for review. We will share Crossroad's comments as they are received. When construction plans are submitted for review for this development, please provide a set of drawings and drainage calculations directly to Crossroad. AVAILABILITY AND CONNECTION FEES 11. Availability (acreage) Fees must be paid after all other Engineering Department requirements have been satisfied and prior to approval and start of construction activities. Availability Fees are based upon total platted acreage or legal description acreage for the development at the current rate of $1,010.00 per acre for Water Availability. It appears that a copy of the secondary plat for Section 4 was not included with the construction plans. However, using the acreage of 14.93 acres indicated for Section 4 on the T.A.C. agenda, the Water Availability Fee calculation for Section 4 is: 14.93 acres @$10,10.00 /acre $15,079.00. Connection Fees -Based on the drawings submitted, there appear to be 46 residential lots or 46.0 E.D.U.s. The current Water Connection Fee is $1,310.00 per EDU. Connection Fees are paid when the infrastructure has been completed, satisfactory test results obtained and the development has been released for building permits. Connection Fees are paid on an individual -lot basis. The Availability and Connections Fees are current as of this date but are subject to future revisions. If an irrigation system, swimming pool or clubhouse is planned for this development, additional Water Connection Fees will be assessed based upon the recommendations of the Director of Carmel Utilities. CONSTRUCTION PLAN COMMENTS 12. A seven -page Plan Certification Form is enclosed with this letter. This form was created with the desire and intent to streamline the plan review process. We request that you please complete this form and return it to the Department of Engineering as soon as possible. Comments will be generated after the Certification Form is returned. Please treat each item on the form as a requirement of the Department of Engineering. Providing a "no" or "N /A" response to any of the items does not relieve the Developer of the responsibility of meeting the requirements of the Department of Engineering. The Department of Engineering will make the final determination as to the acceptability of any "no" or "N /A" responses. 13. All six sections of Sanctuary at 116 Street are shown on the cover sheet of the construction plans submitted for Section 4. As a result, the drawing is so small that there is very little detail and the text can't be read. Please show just the section to which this particular set of plans pertains (Section 4) and show this section at a much larger scale. 14. Street Name Signs -By virtue of City of Carmel Ordinance No. D- 1457 -00, we require the type of green reflective type street name signage, posts and brackets as indicated in the Subdivision Signage Requirements document included with these comments. If the development adheres to these requirements, the developer may order and pay for the signs and have them shipped directly to our Street Department, along with a copy of the recorded secondary plat of the development, and the Street Department will install the signs. Once installed, our Board of Public Works and Safety will release the Developer's Performance Guarantee. After release of the Performance, the Developer is required to post a 3 -year Maintenance Guarantee in the amount of 10% of the Performance Guarantee or $100.00, whichever is greater. At the end of the 3 -year maintenance period, it becomes the City's responsibility for the maintenance and replacement of street signs. If it is the Developer's intention not to adhere to the above requirements and to install decorative style street name signs, these signs must conform to the City of Carmel Decorative Street Signage Detail included with these comments. However, it will be the Developer's responsibility to install decorative posts, brackets and street name blades. Once installed, our Board of Public Works and Safety will release the Performance Guarantee. When the Performance has been released, a 3 -year maintenance guarantee will not be required. Maintenance and/or replacement of decorative street name signage will be the responsibility of the Developer and/or the Homeowners Association. Regulatory Signs -All regulatory signs require City of Carmel Ordinances to be legal. Please provide a street name sign and regulatory sign plan for review and approval. We request that all regulatory signs installed to be standard signage, not decorative. However, if you plan on the installation of decorative type regulatory signs and/or street name signs, please designate this on the sign plan. All regulatory signs must meet all legal requirements as outlined in the Indiana Manual on Uniform Traffic Control Devices (MUTCD). Please note that installation of street name signs and regulatory signs are included as a requirement for building permit approval. 15. If off -site easements will be necessary to install the utilities, these easements must be secured prior to the Department of Engineering approving the drawings. 16. The Department requires that the construction drawings be developed in accordance with the City of Carmel digital submission standards and that all required submittals for primary plat, secondary plat, and construction drawings be made. The digital files must be submitted to the Department of Engineering prior to the approval of the construction plans. Please contact the City GIS Department for the requirements. 17. The City has adopted a new paving policy. Please revise any notes, specifications, and details to accommodate this policy. The language of this policy must be added to a specification sheet on the plans. 18. The City has adopted a new curbing policy. Please revise any notes, specifications, and details to accommodate this policy. The language of this policy must be added to a specification sheet on the plans. 19. All lots adjacent to side yard easements must be wide enough to accommodate the anticipated house model and any planned driveways such that there is no encroachment in the easements. 20. Please edit or provide a detail which requires the following pavement section for the paving of the proposed interior public streets: 1.5 inches HMA 11 surface on 2 inches HMA #8 binder on 3 inches HMA #5D base on 7 inches #53 stone. Please add a note that all paving must be completed in one paving season. 21. All paving within the existing and proposed City right -of -way shall conform to the requirements of the Department of Engineering. Please add a note to the drawings that the Contractor shall contact the Department of Engineering to schedule a pre construction meeting to review the Department's construction requirements, staff notification requirements, required inspections for certain stages of the work and to review the authority of the Department as it relates to work within the existing and proposed City right -of -way. 22. Please include the note "THERE SHALL BE NO WATER VALVES OR MANHOLES WITHIN THE PAVEMENT, CURBS, SIDEWALKS, OR ASPHALT PATHS" on all appropriate sheets. 23. This project is subject to the Carmel Stormwater Management Ordinance, which was adopted February 6, 2006. 24. Please review storm water quality requirements for this project with Amanda Foley at (317) 571- 2441. 25. The first sheet of the plans submitted is sheet C203. Apparently there are several sheets (including a cover sheet) that are missing. Please submit a complete set of plans for review. 26. Much of the information and drawings pertain to sections other than Section 4 (for example Sections 2 and 6). Please revise to eliminate information that does not pertain to Section 4. 27. Section 6.03.12 of the City of Carmel Subdivision Control Ordinance states "Intersections of more than two streets at one point shall not be permitted." The intersection of Eaglerun Way and Eagleview Drive constitutes an intersection of more than two streets at one point, and therefore is in violation of the Subdivision Control Ordinance. The two intersections created by Eaglerun Way are less than the minimum required separation distance of 150 feet. Eaglerun Way does not align with Eaglechase on the opposite side of Eagleview Drive creating a street jog with an offset of less than 150 feet. Section 6.03.01 of the Subdivision Control Ordinance states "Street jogs with centerline offsets of less than one hundred fifty feet shall not be permitted." There are no curbs, subsurface drains, or sidewalks along the inside edge of Eaglerun Way. The City requires curbs, subsurface drains, and sidewalks along both sides of the streets. There are several water valves shown located in the pavement. The City does not all water valves or manholes within the street pavement, curbs, or sidewalks. For these reasons please revise such that a cul -de -sac is provided in place of the current loop street. This revision will need to be reflected in the plans for Sanctuary at 116 Street, Section 1 before those plans can be released. 28. The two intersections created by Eaglecrest Place are less than the minimum required separation distance of 150 feet. There are no curbs, subsurface drains, or sidewalks along the inside edge of Eaglecrest Place. The City requires curbs, subsurface drains, and sidewalks along both sides of the streets. For these reasons please revise such that a cul -de -sac is provided in place of the current loop street. 29. Please provide horizontal curve data for the horizontal curves on Eaglerun Way and Eaglecrest Place. 30. Please label the subdivision adjacent to the west side of Sanctuary at 116 Street. A stub street has been required and provided in the subdivision on the west side of Sanctuary at 116 Street in the vicinity of the line between Section 4 and Section 6. Please provide a street in Sanctuary at 116 Street to connect with the stub street in the adjacent subdivision. 31. Sidewalks are required on both sides of all streets. 32. Common areas are not permitted within the right -of -way. These comments represent the Department of Engineering's initial review of the construction plans for this project. We request that all responses to our comments be provided in writing. Failure to provide written responses may result in the delay of the review process. We reserve the right to provide additional review and comments when detailed construction plans are submitted for this project. It is critical that this office be made aware of all modifications made on the plans being re- submitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans including all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, BZA or other committee meetings. All bonds and performance guarantees must be posted prior to Engineering Department approval of construction plans. Board of Public Works and Safety approvals and any other governing agency approvals (if required) must be obtained prior to Engineering Department approval. All performance guarantees must be posted prior to submission of secondary plats for Board of Public Works and Safety approval. The Department reserves the right to provide additional comments based upon subsequent reviews and on the grading and drainage system upon receipt of drainage calculations and construction drawings that provide grading elevations, pipe sizing and invert elevations. These comments may affect the drainage system layout presented on the secondary plat and on the construction plans. If you have questions, please call me at 571 -2441. Sincerely, j Dun' P. Assistant Ci Engineer Departmen of Engineering Enclosures Cc: Matt Griffin, Department of Community Services John Duffy, Director Carmel Utilities Paul Pace, Carmel Utilities Distribution Greg Ilko, Crossroad Engineers Greg Hoyes, Hamilton County Surveyor's Office Dennis McGuire, Paul I. Cripe Engineers Pat Shaurette, Professional Real Estate Services Engineering File Copy Engineering Department Review S:\PROJREV06 \SANCTUARY @116STREETSECTON 4 10/31/2006 18:06 3177769628 HAMILTON CO SURVEYOR PAGE 01/02 �T �RV O xC t 1 ,11 it" 1 (7.),,,,:4150 I h. CO) N J ,AT, 1 y f 1 p l �j 1 6 i 3 i<)....4,17., air I f l A l a l r l'� n a k m j l k j I l J (�[�l i- 1 t t lit i I l o f _c I' r :Kenton C. 'Ward, Surveyor snare ryes 'Flinn(' (5 1. 7• 77-84 c (Inc .:Namilfon County Square 'Tax (3 77 6- `)l'2, Nobresvrrrc. Indiana 0 60- 2. 2; 3 6 4%, t71L October 31, 2006 P t, 4)44% 4 0.0 Indiana Land Development Corp. T i® ATTN: Paul Shoopman i 8170 Zionsville Road o o 'O j Indianapolis, IN 46268 '-Y VIA FACSIMILE: 415 -0466 1 1 k RE: Sanctuary at 3.16 Street Section 4 Dear Mr. Shoopman: We have reviewed the construction plans submitted to the Hamilton County Surveyor's Office on September 1.1, 2006 and October 2, 2006 for this project and have the following comments: 1. This project falls within the incorporated area and MS4 jurisdiction of the City of Carmel. 2. This proposed project DOES NOT fall in a Carmel Watershed Protection Area. 3. This proposed project falls in the Long Branch Watershed. 4. Please submit the following procedural items to this office, petition for regulated subdivision, outlet permit, subdivision non enforcement, engineers estimate, and all associated bonds for 120% of construction cost. The applications are available on our website at htt,: /www•co.hamilton...in.us, go to Departments, Surveyor, and Forms. 5. The easement in the rear yards of lots 153 to 155 needs to be increase to a 15' easement because of the regulated SSD under the swale. 6. The side yard easement between lots 114 115, lot 134 135, and lot 121 all need to be increase to 15' per half to accommodate the regulated drains between these lots. 10/31/2006 18:06 3177769628 HAMILTON CO SURVEYOR PAGE 02/02 7. The Storm Structure Data Table (HCSO Detail D -19) on sheet C705 will need to be completed for the storm structures in this section or a similar data table provided by the engineer. 8. Since Common Area Block U is not dedicated at Drainage Easement, please show a 15' per half easement to cover the regulated drain between Str. 4709 and 4710. 9. Do to the design of the cul -de-sac drainage system; maintenance access to the SSD is a problem because of the length from the nearest structure. To resolve this issue, HCSO wants the SSD brought up into a riser (HCSO Standard Detail SSD -3) behind the high point of the curb line. One will be needed for the SSD in each direction around the cul-de -sac. Another alternative would be to set a 2' x 2' shallow box structure at the high point of the curb line with a curb inlet casting. This structure will not take road drainage flow but would provide an access point on the SSD. This is shown in the one location for this section, but the note in the utility plan legend is missing to reference what is intended for this comment. 10. Please address storm sewer review comment from City of Carmel Engineering Department and Crossroad Engineers. 11. Please note the additional comments may be warranted at a later date. Should you have any questions, I can be reached at 317- 776 -8495. Sincerely, Greg Hoyes, AC, CFM Plan Reviewer. CC: Matt Griffin Carmel DOCD Dick Hill Carmel Engineering Amanda Foley Carmel Engineering Joel Thurman HCHD Greg Iiko Crossroad Engineers Pat Shaurette 295 -1207 dirtg_NS1661)4A.(j, Il ®f Carrnet Carmel Police Dejparfm en 3 Civic Sgaare Carmel, Li 4aiha 46032 10X f September 12, 2006 i .4-636,N P 1� Mr. Paul Shoopman t\Q.6 Indiana Land Development 8170 Zionsville Road Indianapolis, IN 46268 RE: The Sanctuary of 116 Sectio s 5 -6 Dear Mr. Shoopman: The documents for the above- mentioned project have been received and reviewed. At the present time, I see nothing in the plans that would hamper law enforcement efforts. If we can be of any further assistance to you, please contact us. Sincere) Timothy J. Green Acting Chief of Police TJG:vb cc: Dept. of Community Services (317) 571 2500 A Nationally Accredited Law Enforcement Agency F. (317) 571