HomeMy WebLinkAbout08050036 02 Abbreviations and Index0
AC
ACT
AD
ADJ
AFF
AFP
AGG
ALT
AL
AP
APPROX
AR
ARCH
ASPH
AV
AWG
AWT
L
BIT
BLDG
BLKG
BM
B.O.
BOS
BOT
BRG
BRK
BUR
CAB
CAR
CAT
CB
CR1
CH
CI
CJ
CL
CLR
CLG
CMP
CMT
CMU
CO
COL
COMP
CONC
CONSTR
CONT
CONTR
CORR
CT
C TO C
CSK
CU FT /CF
CU IN /CI
CU YD /CY
CUSP
CW
CWF
d
D
0
DC
DEPT
DET
DF
DIA/ O
DIM
DPI
DL
DWG
DS
DWC
E
EA
EF
EJ
EL
ELEC
ELEV
ENGR
EP
EQ
EQUIP
EW
EFS (or DEFS)
EIFS
EXH
EXIST
EXP
EXT
EXTN
ARCHITECTURAL /SITE ABBREVIATIONS
AT
AIR CONDITIONING
ACOUSTICAL CEILING TILE
AREA DRAIN
ADJUSTABLE
ABOVE FINISHED FLOOR
ACCORDION FOLDING PARTITION
AGGREGATE
ALTERNATIVE
ALUMINUM
ACCESS PANEL
APPROXIMATE
ACID RESISTANT
ARCHITECT(URAL)
ASPHALT
AUDIO- VISUAL
AMERICAN WIRE GAUGE
ACOUSTICAL WALL TREATMENT
ANGLE
AND
BITUMINOUS
BUILDING
BLOCKING
BENCH MARK /BEAM
BOTTOM OF
BOTTOM OF STEEL
BOTTOM
BEARING
BRICK
BUILT-UP ROOF
ABBREVIATIONS USED ON THE CONTRACT DOCUMENTS, INCLUDE BUT ARE NOT LIMITED TO THOSE USTED BELOW
CABINET
CARPET
CATALOG
CHALKBOARD /CATCH BASIN
CUBIC FEET PER MINUTE
CABINET HEATER
CAST IRON
CONTROL JOINT
CENTERLINE
CLEAR
CEILING
CORRUGATED METAL PIPE
CERAMIC MOSAIC TILE
CONCRETE MASONRY UNIT
CLEANOUT
COLUMN
COMPACTED
CONCRETE
CONSTRUCTION
CONTINUOUS /CONTINUE
CONTRACTOR
CORRUGATED
CERAMIC TILE
CENTER TO CENTER
COUNTER SINK
CUBIC FEET
CUBIC INCH
CUBIC YARD
CUSPIDOR
COLD WATER
CEMENTIOUS WOOD FIBER
PENNY (NAILS, ETC.)
DEPTH /DEEP
DEGREE
DISPLAY CASE
DEPARTMENT
DETAIL
DRINKING FOUNTAIN
DIAMETER
DIMENSION
DMSION
DEAD LOAD
DRAWING
DOWNSPOUT
DRINKING WATER COOLER
EAST
EACH
EACH FACE
EXPANSION JOINT
ELEVATION
ELECTRIC(AL)
ELEVATOR
ENGINEER
ELECTRICAL PANELBOARD
EQUAL
EQUIPMENT
EACH WAY
DIRECT APPLIED EXTERIOR FINISH SYSTEM
EXTERIOR INSULATION FINISH SYSTEM
EXHAUST
EXISTING
EXPANSION
EXTERIOR
EXTENSION
FLOOR DRAIN
FIRE HOSE CABINET
FINISH
FINISH FLOOR
FLOOR
FOUNDATION
FLEXIBLE SHEET ROOFING
FLOOR SERVICE SINK
FEET
FOOTING
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
GAUGE
GALVANIZE(D)
GRAB BAR
GROUND FACE CONCRETE MASONRY UNIT
GLASS FIBER REINFORCED GYPSUM UNIT
GLASS
GYPSUM WALLBOARD
HEIGHT /HIGH
HOSE BIBB
HARDWARE
HOLLOW METAL
HORIZONTAL
HIGH POINT
HIGH STRENGTH
HEATING
HEATING/VENT1LATING/
AIR CONDITIONING
HOT WATER
HIGHWAY
INSIDE DIAMETER
INCH
INCLUDE(D), (ING)
INFORMATION
INSULATION /INSULATE
INTERIOR
INVERT
JOIST SUBSTITUTE
JOIST
JOINT
KITCHEN
LENGTH
LAMINATE(D)
LAVATORY
POUND
LOCKER
LIVE LOAD
LONG LEG HORIZONTAL
LONG LEG VERTICAL
LOUVER
LONG WAY
METER/THOUSAND
MASONRY
MATERIAL
MAXIMUM
MARKER BOARD
MECHANICAL
MEZZANINE
MANUFACTURER
MOP HOLDER
MINIMUM
MISCELLANEOUS
MIWMETER
MASONRY OPENING
METAL
NORTH
NOT IN CONTRACT
NUMBER
NOMINAL
NOT TO SCALE
ON CENTER
OUTSIDE DIAMETER
OPENING
OPPOSITE
OPPOSITE HAND
OUT TO OUT
OPERABLE WALL
OUNCE
PAINT
PUBLIC ADDRESS
PERFORATED
PLASTER
PLASTIC LAMINATE
PLUMBING
PLYWOOD
PREFABRICATED
PROJECTION SCREEN
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
PENCIL SHARPENER SUPPORT
PORCELAIN TILE
POLYVINYL CHLORIDE
PAVEMENT
QT
R
RA
RAD /R
RB
RCP
RD
REF
REFR
REINF
REQ'D
REV
RM
R.O.
ROW
S
SA
SAN
SCHED
SD
SECT
SEW
SGFT
SHT
SIM
SP
SPEC(S)
SPKR
SQ
SQ FT /SF
SQ IN /SI
SQ YD /SY
SS
ST
STD
STL
STRUCT
SUSP
SW
SYMM
SYNTH
T
T &B
T&G
TA
TB
TC
TEL
TERR
T.O.
TOC
TOF
TOM
TOS
TV
TYP
TWS
UNO
UV
UR
VCT
VCGWB
VERT
VFW
VIF
VIT
VOL
VR
VRB
VS
VT
W
W/
W/O
WA
WB
WC
WD
WH
WP
WSSK
WWF
YD
QUARRY TILE
RISER
RETURN AIR
RADIUS
RESIUENT BASE
REINFORCED CONCRETE PIPE
ROOF DRAIN
REFERENCE
REFRIGERATOR
REINFORCING
REQUIRED
REVISION(S)
ROOM
ROUGH OPENING
RIGHT -OF -WAY
SOUTH
SUPPLY AIR
SANITARY
SCHEDULE
STORM DRAIN /SMOKE DETECTOR
SECTION
SEWER
STRUCTURAL GLAZED FACING TILE
SHEET
SIMILAR
SPACE
SPECIFICATIONS)
SPEAKER
SQUARE
SQUARE FEET
SQUARE INCHES
SQUARE YARDS
STAINLESS STEEL
STORM /STREET
STANDARD
STEEL
STRUCTURAL
SUSPENDED
SHORT WAY /SIDEWALK
SYMMETRY(ICAL)
SYNTHETIC
TREAD
TOP AND BOTTOM
TONGUE AND GROOVE
TOILET ACCESSORY(IES)
TACKBOARD
TOP OF CURB
TELEPHONE
TERRAllO
TOP OF
TOP OF CONCRETE
TOP OF FOOTING
TOP OF MASONRY
TOP OF STEEL
TELEVISION
TYPICAL
TACKABLE WALL SURFACE
UNLESS NOTED OTHERWISE
UNIT VENTILATOR
URINAL
VINYL COMPOSmON TILE
VINYL COVERED GYPSUM WALLBOARD
VERTICAL
VINYL FABRIC WALLCOVERING
VERIFY IN FIELD
VITREOUS
VOLUME
VAPOR RETARDER
VENTED RESILIENT BASE
VENT STACK
VINYL TILE
WEST/WIDE/WIDTH
WITH
WITHOUT
WARDROBE ACCESSORIES
WOOD BASE
WATER CLOSET/WIND COLUMN
WOOD
WATER HEATER
WORKING POINT
WALL SERVICE SINK
WELDED WIRE FABRIC
YARD/YARD DRAIN
41.""
0
MATERIAL SYMBOLS LEGEND
MATERIAL SYMBOLS USED ON THE CONTRACT DOCUMENTS, NCLUDE BUT ARE NOT VISITED TO THOSE LISTED BELOW
MW
VV VV LVV LVV
v <v <Vr <Vr <v
ASPHALT
EARTH
GRAVEL, STONE OR DRAINAGE FILL
SAND, GROUT, PLASTER, GWB,
OR PLAN VIEW OF SIDEWALK
CONCRETE
TERRAllO
CUT STONE
MARBLE
SLATE
FACE BRICK(PLAN)
GLAZED BRICK
CONCRETE MASONRY UNIT (PLAN)
CONCRETE MASONRY UNIT
(SECTION)
CONCRETE MASONRY UNIT
(SOUD, IN SECTION)
SPRAY -ON INSULATION OR
FIRE PROTECTION
DRAWING SYMBOLS LEGEND
TEST BORING NO.
EXISTING CONTOUR
NEW CONTOUR
EXISTING POINT ELEVATION
NEW POINT ELEVATION
STORM SEWER INLETS
WINDOW DESIGNATION
DOOR NUMBER(S)
STRUCTURAL GRID REFERENCE
KEY NOTE
A15
X X
I I I I
L
W 1
WIRE FENCE OR PARTITION
METAL ROOF DECK
LAMINATED WOOD BEAM
(SMALL SCALE, SECTION)
BATT INSULATION
RIGID INSULATION
ROUGH WOOD (NOM.)
FINISH WOOD
WOOD OTHER THAN NOMINAL
PLYWOOD
GYPSUM WALLBOARD (LARGE SCALE)
STUD WALL(PLAN)- DIMENSIONS TAKEN
TO FINISH FACE OF WALL -SEE WALL TYPES.
SOUD PANEL FOLDING PARTITION
OR OPERABLE WALL
FABRIC ACCORDION FOLDING
PARTITION
ACOUSTIC TILE CEIUNG
EXTERIOR INSULATION FINISH SYSTEM
DRAWING SYMBOLS USED ON THE CONTRACT DOCUMENTS, INCLUDE BUT ARE NOT UNITED TO THOSE USTED BELOW
LEVEL UNE
MUSIC CASEWORK
MEDIA CENTER CASEWORK
EDUCATIONAL CASEWORK
LOCKER TYPE
DETAIL REFERENCE
ROOM NO. SEE ROOM LEGEND
FOR ROOM AREA CEILING HEIGHT
INTERIOR WALL TYPE
WALL SECTION
INTERIOR ELEVATIONS
BUILDING SECTION
NORTH
,V
STATE
VAP
LOCATION
yAP
NORTH
MI/
SCHOOL BOARD
STEPHEN BACKER
BRUCE CALABRESE
TRICIA HACKETT
GREG PHILLIPS
ANDREW KLEIN
ADMINISTRATION
DR. BARBARA UNDERWOOD
ROGER MCMICHAEL
LIBBIE CONNOR
ROLLIN FARRAND
SITE LOCATION MAP
1 -465
ILLINOIS
1 -65
32
CARMEL
US31
l
US31
MICHIGAN
MICHIGAN CRY
SOW BEND
US31
38 19
NOBLESVIL
c
431
1 -69
1-70
INDIANA
INDIANAPOLIS
931ST
FISHERS
37
FORT WAYNE
KENTUCKY
32
146TH
CEUNA
PROJECT SITE
116TH
1 -69
13989 HAZEL DELL PARKWAY
CARMEL, INDIANA 46033
OHIO
President
Vice President
Secretary
Member
Member
Superintendent
Assistant Superintendent
Assistant Superintendent
Director of Facilities and Transportation
SHEET INDEX
COVER
ABBREVIATIONS AND INDEX
SITE
SURVEY
CURRENT GRADING PLAN
GD1.0 SITE DEMOLITION PLAN
G1.0 SITE LAYOUT PLAN
G2.0 GRADING AND DRAINAGE PLAN
G3.1 ENLARGED LAYOUT PLAN
G3.2 ENLARGED LAYOUT PLAN
G4.1
G4.2
G4.3
G4.4
DETAILS
DETAILS
DETAILS
DETAILS
L1.0 LANDSCAPE PLAN
CIVIL
SU2.1 STORM SEWER DETAILS
STRUCTURAL
S1.1 FOUNDATION PLAN AND DETAILS
S1.2 FOUNDATION DETAILS
S1.3 FOUNDATION DETAILS
S2.1 FRAMING PLANS AND DETAILS
S2.2 FRAMING DETAILS
S2.3 FRAMING DETAILS
S3.1 MASONRY PLANS AND DETAILS
S3.2 MASONRY DETAILS
S3.3 MASONRY DETAILS
ARCHITECTURAL
A0.1 FIRST FLOOR CODE PLAN
SECOND FLOOR CODE PLAN
A1.1 FIRST FLOOR PLAN
SECOND FLOOR PLAN
VIDEO PLATFORM
A1.2 DETAILS
WALL TYPES
A1.3 SOFTBALL DUGOUT PLANS AND DETAILS
A1.4 SOFTBALL DUGOUT SECTIONS AND DETAILS
A3.1 BUILDING ELEVATIONS
ROOF PLAN
A5.1 WALL SECTIONS
A6.1 DOOR SCHEDULE DOOR AND FRAME ELEVATIONS
WINDOW ELEVATIONS DOOR DETAILS
A6.2 DOOR AND WINDOW DETAILS
A7.1 FIRST FLOOR EQUIPMENT PLAN EQUIPMENT SCHEDULE
SECOND FLOOR EQUIPMENT PLAN FlNISH SCHEDULE
A7.2 MOUNTING HEIGHT DRAWING ENLARGED
TOILET PLANS EQUIPMENT DETAILS
A9.1 FIRST FLOOR REFLECTED CEIUNG PLAN
SECOND FLOOR REFLECTED CEIUNG PLAN
A10.1
VERTICAL CIRCULATION
PLUMBING
P1.1
P3.1 PLUMBING SCHEDULES /DETAILS
P3.2 PLUMBING DETAILS
SYMBOLS AND ABBRIEVIATIONS
P2.1 UNIT 'A' FOUNDATION PLAN- PLUMBING
P2.2 UNIT 'A' FIRST FLOOR PLAN- PLUMBING AND FIRE
PROTECTION
P2.3 UNIT 'A' SECOND FLOOR PLAN- PLUMBING
PSU2.1
PSU2.2
PSU2.3
PSU2.4
SITE PLAN- PLUMBING AND FIRE PROTECTION
WATERMAIN EXTENSION PLAN- PLUMBING AND FIRE
PROTECTION
UTILITY COMPANY SPECIFICATIONS AND DETAILS
UTILITY COMPANY SPECIFICATIONS AND DETAILS
MECHANICAL
M1.1 SYMBOLS AND ABBREVIATIONS
M2.1 FIRST AND SECOND FLOOR VENTILATION PLAN
ELECTRICAL
E1.1 ELECTRICAL SYMBOLS AND DETAILS
E1.2 GROUNDING DETAILS
E1.3 ELECTRICAL DETAILS
E2.1 ELECTRICAL SITE PLAN
E5.1 DUGOUT AND STORAGE ELECTRICAL PLANS
E6.1 FIRST FLOOR ELECTRICAL PLANS
E6.2 SECOND FLOOR ELECTRICAL PLANS
E7.1
E7.2
E8.1
E8.2
SINGLE UNE DIAGRAM
SINGLE UNE DIAGRAM
FIXTURE SCHEDULE
FIXTURE SCHEDULE
TECHNOLOGY
T1.1
T2.1
T3.1
T3.2
T4.1
T4.2
TECHNOLOGY DETAILS
TECHNOLOGY SITE PLAN
FIRST FLOOR ROUGH -IN PLAN
SECOND FLOOR ROUGH -IN PLAN
FIRST FLOOR TECHNOLOGY PLAN
SECOND FLOOR TECHNOLOGY PLAN
W
V
O
co
co
W
Z
0
O
N
0
cc
a_
O
V
X
W
0)
CIC
0
I-
W
m
x v,
W
cm O
2
Z
w¢ U Q
ELi co
(m)
z
cc �J� V W
V ro 0 J�
L T,
Li_ cc cc
0 Q
Cl) U
co
N
z
W
0
0 0
8
CV
Pr)
00
N
ce
0
Z
c W
0 0
0
V
0
s
14-
0
co
CO
r
H
0
X
W
D
CHERRY TREE SOFTBALL COMPLEX RENOVATIONS
208032.00.00