Loading...
HomeMy WebLinkAbout08050036 02 Abbreviations and Index0 AC ACT AD ADJ AFF AFP AGG ALT AL AP APPROX AR ARCH ASPH AV AWG AWT L BIT BLDG BLKG BM B.O. BOS BOT BRG BRK BUR CAB CAR CAT CB CR1 CH CI CJ CL CLR CLG CMP CMT CMU CO COL COMP CONC CONSTR CONT CONTR CORR CT C TO C CSK CU FT /CF CU IN /CI CU YD /CY CUSP CW CWF d D 0 DC DEPT DET DF DIA/ O DIM DPI DL DWG DS DWC E EA EF EJ EL ELEC ELEV ENGR EP EQ EQUIP EW EFS (or DEFS) EIFS EXH EXIST EXP EXT EXTN ARCHITECTURAL /SITE ABBREVIATIONS AT AIR CONDITIONING ACOUSTICAL CEILING TILE AREA DRAIN ADJUSTABLE ABOVE FINISHED FLOOR ACCORDION FOLDING PARTITION AGGREGATE ALTERNATIVE ALUMINUM ACCESS PANEL APPROXIMATE ACID RESISTANT ARCHITECT(URAL) ASPHALT AUDIO- VISUAL AMERICAN WIRE GAUGE ACOUSTICAL WALL TREATMENT ANGLE AND BITUMINOUS BUILDING BLOCKING BENCH MARK /BEAM BOTTOM OF BOTTOM OF STEEL BOTTOM BEARING BRICK BUILT-UP ROOF ABBREVIATIONS USED ON THE CONTRACT DOCUMENTS, INCLUDE BUT ARE NOT LIMITED TO THOSE USTED BELOW CABINET CARPET CATALOG CHALKBOARD /CATCH BASIN CUBIC FEET PER MINUTE CABINET HEATER CAST IRON CONTROL JOINT CENTERLINE CLEAR CEILING CORRUGATED METAL PIPE CERAMIC MOSAIC TILE CONCRETE MASONRY UNIT CLEANOUT COLUMN COMPACTED CONCRETE CONSTRUCTION CONTINUOUS /CONTINUE CONTRACTOR CORRUGATED CERAMIC TILE CENTER TO CENTER COUNTER SINK CUBIC FEET CUBIC INCH CUBIC YARD CUSPIDOR COLD WATER CEMENTIOUS WOOD FIBER PENNY (NAILS, ETC.) DEPTH /DEEP DEGREE DISPLAY CASE DEPARTMENT DETAIL DRINKING FOUNTAIN DIAMETER DIMENSION DMSION DEAD LOAD DRAWING DOWNSPOUT DRINKING WATER COOLER EAST EACH EACH FACE EXPANSION JOINT ELEVATION ELECTRIC(AL) ELEVATOR ENGINEER ELECTRICAL PANELBOARD EQUAL EQUIPMENT EACH WAY DIRECT APPLIED EXTERIOR FINISH SYSTEM EXTERIOR INSULATION FINISH SYSTEM EXHAUST EXISTING EXPANSION EXTERIOR EXTENSION FLOOR DRAIN FIRE HOSE CABINET FINISH FINISH FLOOR FLOOR FOUNDATION FLEXIBLE SHEET ROOFING FLOOR SERVICE SINK FEET FOOTING FIRE EXTINGUISHER FIRE EXTINGUISHER CABINET GAUGE GALVANIZE(D) GRAB BAR GROUND FACE CONCRETE MASONRY UNIT GLASS FIBER REINFORCED GYPSUM UNIT GLASS GYPSUM WALLBOARD HEIGHT /HIGH HOSE BIBB HARDWARE HOLLOW METAL HORIZONTAL HIGH POINT HIGH STRENGTH HEATING HEATING/VENT1LATING/ AIR CONDITIONING HOT WATER HIGHWAY INSIDE DIAMETER INCH INCLUDE(D), (ING) INFORMATION INSULATION /INSULATE INTERIOR INVERT JOIST SUBSTITUTE JOIST JOINT KITCHEN LENGTH LAMINATE(D) LAVATORY POUND LOCKER LIVE LOAD LONG LEG HORIZONTAL LONG LEG VERTICAL LOUVER LONG WAY METER/THOUSAND MASONRY MATERIAL MAXIMUM MARKER BOARD MECHANICAL MEZZANINE MANUFACTURER MOP HOLDER MINIMUM MISCELLANEOUS MIWMETER MASONRY OPENING METAL NORTH NOT IN CONTRACT NUMBER NOMINAL NOT TO SCALE ON CENTER OUTSIDE DIAMETER OPENING OPPOSITE OPPOSITE HAND OUT TO OUT OPERABLE WALL OUNCE PAINT PUBLIC ADDRESS PERFORATED PLASTER PLASTIC LAMINATE PLUMBING PLYWOOD PREFABRICATED PROJECTION SCREEN POUNDS PER SQUARE FOOT POUNDS PER SQUARE INCH PENCIL SHARPENER SUPPORT PORCELAIN TILE POLYVINYL CHLORIDE PAVEMENT QT R RA RAD /R RB RCP RD REF REFR REINF REQ'D REV RM R.O. ROW S SA SAN SCHED SD SECT SEW SGFT SHT SIM SP SPEC(S) SPKR SQ SQ FT /SF SQ IN /SI SQ YD /SY SS ST STD STL STRUCT SUSP SW SYMM SYNTH T T &B T&G TA TB TC TEL TERR T.O. TOC TOF TOM TOS TV TYP TWS UNO UV UR VCT VCGWB VERT VFW VIF VIT VOL VR VRB VS VT W W/ W/O WA WB WC WD WH WP WSSK WWF YD QUARRY TILE RISER RETURN AIR RADIUS RESIUENT BASE REINFORCED CONCRETE PIPE ROOF DRAIN REFERENCE REFRIGERATOR REINFORCING REQUIRED REVISION(S) ROOM ROUGH OPENING RIGHT -OF -WAY SOUTH SUPPLY AIR SANITARY SCHEDULE STORM DRAIN /SMOKE DETECTOR SECTION SEWER STRUCTURAL GLAZED FACING TILE SHEET SIMILAR SPACE SPECIFICATIONS) SPEAKER SQUARE SQUARE FEET SQUARE INCHES SQUARE YARDS STAINLESS STEEL STORM /STREET STANDARD STEEL STRUCTURAL SUSPENDED SHORT WAY /SIDEWALK SYMMETRY(ICAL) SYNTHETIC TREAD TOP AND BOTTOM TONGUE AND GROOVE TOILET ACCESSORY(IES) TACKBOARD TOP OF CURB TELEPHONE TERRAllO TOP OF TOP OF CONCRETE TOP OF FOOTING TOP OF MASONRY TOP OF STEEL TELEVISION TYPICAL TACKABLE WALL SURFACE UNLESS NOTED OTHERWISE UNIT VENTILATOR URINAL VINYL COMPOSmON TILE VINYL COVERED GYPSUM WALLBOARD VERTICAL VINYL FABRIC WALLCOVERING VERIFY IN FIELD VITREOUS VOLUME VAPOR RETARDER VENTED RESILIENT BASE VENT STACK VINYL TILE WEST/WIDE/WIDTH WITH WITHOUT WARDROBE ACCESSORIES WOOD BASE WATER CLOSET/WIND COLUMN WOOD WATER HEATER WORKING POINT WALL SERVICE SINK WELDED WIRE FABRIC YARD/YARD DRAIN 41."" 0 MATERIAL SYMBOLS LEGEND MATERIAL SYMBOLS USED ON THE CONTRACT DOCUMENTS, NCLUDE BUT ARE NOT VISITED TO THOSE LISTED BELOW MW VV VV LVV LVV v <v <Vr <Vr <v ASPHALT EARTH GRAVEL, STONE OR DRAINAGE FILL SAND, GROUT, PLASTER, GWB, OR PLAN VIEW OF SIDEWALK CONCRETE TERRAllO CUT STONE MARBLE SLATE FACE BRICK(PLAN) GLAZED BRICK CONCRETE MASONRY UNIT (PLAN) CONCRETE MASONRY UNIT (SECTION) CONCRETE MASONRY UNIT (SOUD, IN SECTION) SPRAY -ON INSULATION OR FIRE PROTECTION DRAWING SYMBOLS LEGEND TEST BORING NO. EXISTING CONTOUR NEW CONTOUR EXISTING POINT ELEVATION NEW POINT ELEVATION STORM SEWER INLETS WINDOW DESIGNATION DOOR NUMBER(S) STRUCTURAL GRID REFERENCE KEY NOTE A15 X X I I I I L W 1 WIRE FENCE OR PARTITION METAL ROOF DECK LAMINATED WOOD BEAM (SMALL SCALE, SECTION) BATT INSULATION RIGID INSULATION ROUGH WOOD (NOM.) FINISH WOOD WOOD OTHER THAN NOMINAL PLYWOOD GYPSUM WALLBOARD (LARGE SCALE) STUD WALL(PLAN)- DIMENSIONS TAKEN TO FINISH FACE OF WALL -SEE WALL TYPES. SOUD PANEL FOLDING PARTITION OR OPERABLE WALL FABRIC ACCORDION FOLDING PARTITION ACOUSTIC TILE CEIUNG EXTERIOR INSULATION FINISH SYSTEM DRAWING SYMBOLS USED ON THE CONTRACT DOCUMENTS, INCLUDE BUT ARE NOT UNITED TO THOSE USTED BELOW LEVEL UNE MUSIC CASEWORK MEDIA CENTER CASEWORK EDUCATIONAL CASEWORK LOCKER TYPE DETAIL REFERENCE ROOM NO. SEE ROOM LEGEND FOR ROOM AREA CEILING HEIGHT INTERIOR WALL TYPE WALL SECTION INTERIOR ELEVATIONS BUILDING SECTION NORTH ,V STATE VAP LOCATION yAP NORTH MI/ SCHOOL BOARD STEPHEN BACKER BRUCE CALABRESE TRICIA HACKETT GREG PHILLIPS ANDREW KLEIN ADMINISTRATION DR. BARBARA UNDERWOOD ROGER MCMICHAEL LIBBIE CONNOR ROLLIN FARRAND SITE LOCATION MAP 1 -465 ILLINOIS 1 -65 32 CARMEL US31 l US31 MICHIGAN MICHIGAN CRY SOW BEND US31 38 19 NOBLESVIL c 431 1 -69 1-70 INDIANA INDIANAPOLIS 931ST FISHERS 37 FORT WAYNE KENTUCKY 32 146TH CEUNA PROJECT SITE 116TH 1 -69 13989 HAZEL DELL PARKWAY CARMEL, INDIANA 46033 OHIO President Vice President Secretary Member Member Superintendent Assistant Superintendent Assistant Superintendent Director of Facilities and Transportation SHEET INDEX COVER ABBREVIATIONS AND INDEX SITE SURVEY CURRENT GRADING PLAN GD1.0 SITE DEMOLITION PLAN G1.0 SITE LAYOUT PLAN G2.0 GRADING AND DRAINAGE PLAN G3.1 ENLARGED LAYOUT PLAN G3.2 ENLARGED LAYOUT PLAN G4.1 G4.2 G4.3 G4.4 DETAILS DETAILS DETAILS DETAILS L1.0 LANDSCAPE PLAN CIVIL SU2.1 STORM SEWER DETAILS STRUCTURAL S1.1 FOUNDATION PLAN AND DETAILS S1.2 FOUNDATION DETAILS S1.3 FOUNDATION DETAILS S2.1 FRAMING PLANS AND DETAILS S2.2 FRAMING DETAILS S2.3 FRAMING DETAILS S3.1 MASONRY PLANS AND DETAILS S3.2 MASONRY DETAILS S3.3 MASONRY DETAILS ARCHITECTURAL A0.1 FIRST FLOOR CODE PLAN SECOND FLOOR CODE PLAN A1.1 FIRST FLOOR PLAN SECOND FLOOR PLAN VIDEO PLATFORM A1.2 DETAILS WALL TYPES A1.3 SOFTBALL DUGOUT PLANS AND DETAILS A1.4 SOFTBALL DUGOUT SECTIONS AND DETAILS A3.1 BUILDING ELEVATIONS ROOF PLAN A5.1 WALL SECTIONS A6.1 DOOR SCHEDULE DOOR AND FRAME ELEVATIONS WINDOW ELEVATIONS DOOR DETAILS A6.2 DOOR AND WINDOW DETAILS A7.1 FIRST FLOOR EQUIPMENT PLAN EQUIPMENT SCHEDULE SECOND FLOOR EQUIPMENT PLAN FlNISH SCHEDULE A7.2 MOUNTING HEIGHT DRAWING ENLARGED TOILET PLANS EQUIPMENT DETAILS A9.1 FIRST FLOOR REFLECTED CEIUNG PLAN SECOND FLOOR REFLECTED CEIUNG PLAN A10.1 VERTICAL CIRCULATION PLUMBING P1.1 P3.1 PLUMBING SCHEDULES /DETAILS P3.2 PLUMBING DETAILS SYMBOLS AND ABBRIEVIATIONS P2.1 UNIT 'A' FOUNDATION PLAN- PLUMBING P2.2 UNIT 'A' FIRST FLOOR PLAN- PLUMBING AND FIRE PROTECTION P2.3 UNIT 'A' SECOND FLOOR PLAN- PLUMBING PSU2.1 PSU2.2 PSU2.3 PSU2.4 SITE PLAN- PLUMBING AND FIRE PROTECTION WATERMAIN EXTENSION PLAN- PLUMBING AND FIRE PROTECTION UTILITY COMPANY SPECIFICATIONS AND DETAILS UTILITY COMPANY SPECIFICATIONS AND DETAILS MECHANICAL M1.1 SYMBOLS AND ABBREVIATIONS M2.1 FIRST AND SECOND FLOOR VENTILATION PLAN ELECTRICAL E1.1 ELECTRICAL SYMBOLS AND DETAILS E1.2 GROUNDING DETAILS E1.3 ELECTRICAL DETAILS E2.1 ELECTRICAL SITE PLAN E5.1 DUGOUT AND STORAGE ELECTRICAL PLANS E6.1 FIRST FLOOR ELECTRICAL PLANS E6.2 SECOND FLOOR ELECTRICAL PLANS E7.1 E7.2 E8.1 E8.2 SINGLE UNE DIAGRAM SINGLE UNE DIAGRAM FIXTURE SCHEDULE FIXTURE SCHEDULE TECHNOLOGY T1.1 T2.1 T3.1 T3.2 T4.1 T4.2 TECHNOLOGY DETAILS TECHNOLOGY SITE PLAN FIRST FLOOR ROUGH -IN PLAN SECOND FLOOR ROUGH -IN PLAN FIRST FLOOR TECHNOLOGY PLAN SECOND FLOOR TECHNOLOGY PLAN W V O co co W Z 0 O N 0 cc a_ O V X W 0) CIC 0 I- W m x v, W cm O 2 Z w¢ U Q ELi co (m) z cc �J� V W V ro 0 J� L T, Li_ cc cc 0 Q Cl) U co N z W 0 0 0 8 CV Pr) 00 N ce 0 Z c W 0 0 0 V 0 s 14- 0 co CO r H 0 X W D CHERRY TREE SOFTBALL COMPLEX RENOVATIONS 208032.00.00