HomeMy WebLinkAbout03090026 C4.0 Erosion Control PlanDESCRIPTION:
DETAIL /SH.
4#;''i 1
;z�*4oi
PROPOSED GRAVEL CONST. ENTRANCE
DETAIL 01/C4.1
4
A
.0.
1 h.
PROPOSED EROSION CONTROL MAT
DETAIL 02/C4.1
PROPOSED RIPRAP
L DESIGNS,
rr
PROPOSED STRAW BALE INLET PROTECTION
DETAIL 04/C4.1
c+
PROPOSED SAND BAG INLET PROTECTION
DETAIL 05/C4.1
E
PROPOSED DITCH EROSION CONTROL
DETAIL 06/C4.1
SF
ZERIDIAN
LNAPOLIS,
DETAIL 07/C4.1
SOIL BOUNDARY
CrA
CROSBY SILT LOAM. 0 3% SLOPES
Br
BROOKSTON -SILTY CLAY LOAM
s R. /1 0 0 1, ,e,
.......),Z0:.(z...•611•1Zi%..
No
PE880303
STATE OF
/ONA%S
li rt1llltlO'
c ,4,
DATE: 09/1 9/2003
l
CUNT
th;E'1 &M
ARMEL,
DWN BY: KRc
CHKD. BY: R R H
SCALE: 1" 6O'
DATE: 09/19/03
PROJECT NUMBER
03-488
DESIGN PHASE
DEVELOPMENT
PLAN NUMBER
C
SHEET OF
DESCRIPTION:
DETAIL /SH.
4#;''i 1
;z�*4oi
PROPOSED GRAVEL CONST. ENTRANCE
DETAIL 01/C4.1
4
A
.0.
1 h.
PROPOSED EROSION CONTROL MAT
DETAIL 02/C4.1
PROPOSED RIPRAP
DETAIL 03/C4.1
rr
PROPOSED STRAW BALE INLET PROTECTION
DETAIL 04/C4.1
c+
PROPOSED SAND BAG INLET PROTECTION
DETAIL 05/C4.1
E
PROPOSED DITCH EROSION CONTROL
DETAIL 06/C4.1
SF
PROPOSED SILT FENCE
DETAIL 07/C4.1
SOIL BOUNDARY
CrA
CROSBY SILT LOAM. 0 3% SLOPES
Br
BROOKSTON -SILTY CLAY LOAM
<3
?v" s,n.tory rc.11
inv. s 875.42
ono. 6 79.56,.
i'
e33
rn h
11 594.49 895.82
i,. 985.99
899-
882.9`/
IT
-a9
1 1
d
p� G
5
I
6,
II
v
I
I I
1 r
1 f
r
f
1.
1 ,c 1
l
1 t .,01‘
r
;l a 5 .1;
1 h, 1 ,01 0;
I ;1
'C q'
d 1 1 0 1 p
'11 �Qp TM 1 hµ
11' 1't
i 1 1
j 1 1 0'r
11;� 1 1
1,
1.11 11
W q,
1 1'111 t-'' ii
1 I 'I'
1 ,I
I I e
my' ,t
r i 0'' 1 V
4
1131---
r�= 892.88
`0 a
.c�
��O 156
893.,8
r
•0 T
aa�.,�t a
MIND 01.1F1
C.
not,tcry 811
II
i
STONE CHECK DAM
4 ib
87 5
a 0,0
873.23
\\Z
EROSION CONTROL NOTES
1. ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO CURRENT
STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE, COUNTY, CITY OR
LOCAL REQUIREMENTS, WHICHEVER HAS JURISDICTION.
2. LAND ALTERATION WHICH STRIPS THE LAND OF VEGETATION, INCLUDING
REGRADING, SHALL BE DONE IN A WAY THAT WILL MINIMIZE EROSION.
3. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE CONTRACTOR
SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SOIL SEDIMENT
FROM LEAVING THE SITE. ADDITIONAL EROSION AND SEDIMENT CONTROL
MEASURES WILL BE INSTALLED IF DEEMED NECESSARY BY ON-SITE INSPECTION.
4. SEDIMENT LADEN WATER SHALL BE DETAINED BY EROSION CONTROL
PRACTICES AS NEEDED TO MINIMIZE SEDIMENTATION IN THE RECEIVING
STREAM. NO STORM WATER SHALL BE DISCHARGED FROM THE SITE IN A
MANNER THAT CAUSES EROSION AT THE POINT OF DISCHARGE.
5. WASTES AND UNUSED BUILDING MATERIALS SHALL NOT BE ALLOWED TO BE
CARRIED FROM THE SITE BY STORMWATER RUNOFF. PROPER DISPOSAL OF
ALL WASTES AND UNUSED BUILDING MATERIALS IS REQUIRED.
6. SEDIMENT BEING TRACED ONTO PUBLIC OR PRIVATE ROADWAYS SHALL BE
MINIMIZED. CLEARING OF ACCUMULATED SEDIMENT SHALL NOT INCLUDE
FLUSHING WITH WATER. CLEARED SEDIMENT SHALL BE RETURNED TO THE
SITE FOR DISPOSAL.
7. SOIL WHICH HAS ACCUMULATED NEXT TO EROSION CONTROL DEVICES SHALL
BE COLLECTED AND REDISTRIBUTED ON SITE AFTER EACH RAINFALL EVENT,
AND AT LEAST ONCE A WEEK.
8. IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED BY
WEATHER OR NIGHTFALL, THE PIPE ENDS SHALL BE COVERED WITH FILTER
FABRIC.
9. ALL EXISTING STRUCTURES, FENCING, TREES AND ETC., WITHIN CONSTRUCTION
AREA SHALL BE REMOVED AND DISPOSED OF OFF SITE. BURNING IS NOT
ALLOWED ON-SITE.
10. SCHEDULE OF EARTHWORK ACTIVITIES:
a) THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE
KEPT TO A PRACTICAL MINIMUM. THE AREA SHALL BE STABILIZED
SOON AS POSSIBLE. TEMPORARY VEGETATION OR MULCHING SHALL
BE USED TO PROTECT EXPOSED AREAS IF PERMANENT VEGETATION
CANNOT BE SEEDED WITHIN 14 DAYS OR ACTIVITY CEASES FOR MORE
THAN 21 DAYS OR AS DIRECTED BY THE ENGINEER.
b) TOPSOIL REPLACEMENT SHALL TAKE PLACE FROM MARCH 1 TO
OCTOBER 31. STOCKPILE TOPSOIL AT ALL OTHER TIME OF THE YEAR.
PERMANENT AND FINAL VEGETATION AND STRUCTURAL EROSION
CONTROL DEVICES SHALL BE INSTALLED WITHIN SEVEN (7) DAYS AFTER
FINAL GRADING OR AS SOON AS POSSIBLE.
tc 893.58
"DON'T
DIG
BLIND"
Survey and boundary information provided
by AMERICAN CONSULTING, INC.. Survey
dated 11/15/02.
"HOLEY MOLEY"
SEZ:
INDIANA UNDERGROUND PROTECTION SERVICE INC.
CALL TWO WORKING DAYS BEFORE YOU DIG
1-800-382-5544
CALL TOLL FREE
1-800-428-5200
FOR CALLS OUTSIDE OF INDIANA
UTILITY STATEMENT:
The underground utilities shown have been located from field survey
information and existing drawings. The surveyor makes no guarantees
that the underground utilities comprise all such utilities in the area,
either in-service or abandoned. The surveyor further does not
warrant that the underground utilities shown are in the exact location
indicated although the surveyor does certify that they are located as
accurately as possible from information available. The surveyor has
not physically located the underground utilities.
VICINITY MAP
NOT TO SCALE
NORTH
1 inch 60 ft.
EXISTING LEGEND:
DESCRIPTION:
EXISTING ASPHALT
EXISTING BRICK
EXISTING CONCRETE
TEMPORARY BENCH MARK
SECTION CORNER
MONUMENT
REBAR FOUND/REBAR SET
PK NAIL FOUND
POWER POLE
GUY WIRE
TELEPHONE PEDESTAL
TRAFFIC POLE
SANITARY MANHOLE
BORING
STAND PIPE
DESCRIPTION:
1)."'
elec-
WATER VALVE
FIRE HYDRANT
SIGN
MAILBOX
BEEHIVE INLET
INLET
DRAINAGE MANHOLE
CURB INLET
DECIDUOUS TREE
CONIFEROUS TREE
OVERHEAD ELECTRIC LINE
UNDERGROUND ELECTRIC
UNDERGROUND TELEPHONE
WATER LINE
GAS LINE
PROPOSED EROSION CONTROL LEGEND:
TOM #10
S.W. BOLT OF FIRE HYDRANT ON E. SIDE OF MICHIGAN ROAD, 150'± S.
OF 106th STREET, WEST OF WALGREENS (MICHIGAN ROAD PROJECT)
ELEV 895.60
TBM #77
A CHISELED "X" ON TOP OF CURB ON
300'± W. OF MICHIGAN ROAD, N. SIDE
NORTHWEST PLAZA
S. SIDE NORTHWESTERN DR.,
CURB ISLAND ENTRANCE TO
ELEV 891.30
IBM #7a
A CHISELED "X" ON S. SIDE CONC. LIGHT POLE BASE, S. SIDE
PEARSON FORD DEALERSHIP, N. SIDE OF 106th STREET, E. SIDE OF
ENTRANCE DRIVE, 400'± W. OF MICHIGAN ROAD.