HomeMy WebLinkAboutApplication Stormwater Mgmt PermitProject Name:
AutoZone Store 4533
Project Location: 10560 North Michigan Road
Quarter: Section: Township: Range:
NW 7 17N 3E
Project Site Owner Name: Title/Position:
Jeff Kauerz Store Development
Company:
AutoZone Stores, Inc
Address:
123 Front Street, Third Floor
City: State: TN Zip: 3 8 7 0 6
Memphis
Phone: Fax: E -mail Address:
901 495 8771 901 495 8300 jeff.kauerz @autozone.com
SWPPP Contact Person: Company Name:
Store Help Line AutoZone Stores, Inc
Affiliation to Project Site Owner:
24 Hour Emergency Contact for AutoZone Corporation
Address (If different from above):
123 Front Street, Third Floor
City: State: TN Zip: 38706
Memphis
Phone: Fax: Fax: 901 495 3800 E-mail Address:
Estimated Project Duration:
12 Months
City of Carmel
STORMWATER MANAGEMENT PERMIT APPLICATION
/NDIM p
Submission of this application constitutes notice that the project site owner is applying for coverage under the Carmel City Code §6 -180
through §6 -209 for stormwater discharges associated with construction activity disturbing '/a acre or more of land. Permitted project site
owners are required to comply with all terms and conditions of the Carmel City Code.
By signing this application, I certify the following:
A. The storm water quality measures included in the Storm Water Pollution Prevention Plan (SWPPP) comply with the requirements of
§6 -180 through *6-209 of the Carmel City Code, the City of Carmel Stormwater Technical Standards Manual, and all applicable
federal, state, and local stormwater requirements;
B. The measures required by the Stormwater Pollution Prevention Plan (SWPPP) shall be implemented;
C. Stormwater quality measures beyond those specified in the Stormwater Pollution Prevention Plan (SWPPP) will be implemented
during the life of the permit if necessary to comply with the Carmel City Code; and
D. Implementation of stormwater quality measures will be inspected by trained individuals;
E. Pursuant to Carmel City Code 6 -205, the City reserves the right to inspect and /or implement the stormwater quality measures
outlined in the Stormwater Pollution Prevention Plan (SWPPP) or provide maintenance thereto, at my expense, if not performed.
(1 k ;:c 2 a vro Zv. J F FF k A u E 1'L- Foa- 4 �r'ro�^"F
re of Proj t Owner
Clg
Permit Approved: Engineering Department
Printed Name
Date
Permit
10
Date
Approval of this application constitutes acceptance of the Storm Water Pollution Prevention Plan SWPPP) by the City of Carmel.