REAR CURB
GUARD FLAP
WITH MAGNETIC
TIE —DOWNS
REPLACEABLE SEDIMENT
BAGS WITH GEOTEXTILE
FILTER FABRIC
TYPICAL FLAT /RECTANGULAR /ROLLED CURB
INLET FILTER
JNSTALLATION:
1. REMOVE GRATE
2. DROP FLEXSTORM INLET FILTER
ONTO LOAD BEARING LIP OF
CASTING OR CONCRETE STRUCTURE
3. REPLACE GRATE
FLIXSTORM Inlet Filter Specifications
WOVEN Geotextile Sediment Bag Specs (2 ft oI)
Material Property Test Method Value (ave)
Grab Tensile ASTM D 4632 255 x275
Puncture Strength ASTM D 4833 135 Ibs
Trapezoidal Tear ASTM D 4533 75 Ibs
UV Resistance ASTM D 4355 90%
App Open Size (AOS) ASTM D 4751 20 sieve
Permittivity ASTM D 4491 1.51 sec
Water Flow Rate ASTM D 4491 200 gpm/sqft
Sediment Removal ASTM D 7351 82%
Efficiency (8% mix)
I W" ALL PRODUCTS MANUFACTURED
CHECKED BY INLET PIPE PROTECTION, INC
DISTRIBUTED BY ADS
QA WWW.INLETFILTERS.COM
MFG 866 287 -8655 PH
630 355 -3477 FX
APPROVED IN FO 'INLETFILTERS.COM
Sly DWG NO REV
C FLEXSTORM
SCALE I IsHEET 1 OF 1
NOTE:
EXTEND ROCK DONUT UNTIL TOP MEETS
EXISTING GRADE AT THE SAME ELEVATION.
STABILIZATION
PRACTICE: JAN. FEB. MAR. APR. MAY
A KENTUCKY BLUEGRASS 40%, TURF TYPE TALL FESCUE 40%, ANNUAL RYEGRASS 20%
PLUS 2 TONS OF STRAW MULCH/ ACRE
APPLY MIXTURE AT A RATE OF 2 LBS. PER 1000 SQ.FT.
B SPRING OATS 3 BUSHEL PER ACRE
C WHEAT OR RYE 2 BUSHEL PER ACRE
PLUS 90 LBS. STRAW MULCH
D ANNUAL RYEGRASS (1 LB. PER 1 000 SQ. FT.) I
E STRAW MULCH (90 LBS. PER 1000 SQ.FT.)
I IRRIGATION NEEDED DURING JUNE, JULY, AND OR SEPTEMBER.
IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD
NOTE: ALL SEEDING SHALL HAVE 12 -12 -12 FERTILIZER APPLIED
400 -600 LBS. PER ACRE OR AS SPECIFIED.
410 4110
1441401 �•1`��.-
b
��4�4 01.40 4 0
•�•_A*�•�•�••�
04,01;00. 4 0,010d1
NOTE:
i STONE SIZE SHALL CONFORM TO ASTM D48
SIZE #1 (1 1/2" TO 3 1/2" DIA.).
2. GEOTEXTILE FABRIC SHALL BE PLACED BENEATH
THE STONE LAYER.
3. PERIODIC 2" STONE TOP DRESSING WASHING
AS REQUESTED BY COUNTY /CITY.
TEMPORARY CONSTRUCTION
ENTRANCE DETAIL
EROSION CONTROL SCHEDULE
EROSION CONTROL MEASURE MAINTENANCE INSTALLATION SEQUENCE
INSPECT WEEKLY, AFTER STORM EVENTS, AND AFTER HEAVY USE;
STONE ENTRANCE RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL; PRIOR TO CLEARING AND GRADING
TOPDRESS WITH CLEAN STONE AS NEEDED; REMOVE ALL MUD AND
SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS IMMEDIATELY
INSPECT AFTER STORM EVENTS; REPAIR ANY AREAS OF DECOMPOSITION
SILT FENCE OR DAMAGE TO FENCE MATERIAL; REMOVE SEDIMENT AT DEPTH OF ONE PRIOR TO CLEARING AND GRADING
HALF FENCE HEIGHT AT LOWEST POINT OR IF FABRIC BULGES; AVOID
UNDERMINING DURING CLEANOUT
EXISTING INLET PROTECTION WEEKLY, AFTER STORM EVENTS, AND AS NEEDED PRIOR TO CLEARING AND GRADING
INSPECT PERIODICALLY TO VERIFY ADEQUATE ESTABLISHMENT OF
VEGETATIVE STANDS; RESEED AND MULCH AS NEEDED; INSPECT AFTER
TEMPORARY SEEDING STORM EVENTS AND REPAIR EROSION DAMAGE; TOPDRESS FALL SEEDED AFTER ROUGH GRADING
WHEAT OR RYE SEEDINGS WITH 50 LBS /AC OF NITROGEN IN FEBRUARY
OR MARCH IF NITROGEN DEFICIENCY IS APPARENT; WATER AS NEEDED
INSPECT PERIODICALLY AND AFTER STORM EVENTS UNTIL VEGETATIVE
STAND IS ESTABLISHED; ADD FERTILIZER AFTER GROWING SEASON PER
PERMANENT SEEDING SOIL TEST RECOMMENDATIONS; REPAIR DAMAGED, BARE, OR SPARSE AFTER FINISH GRADING OF EACH AREA
AREAS BY FIWNG, REPREPARING THE SEED BED, FERTILIZING, AND /OR
SEEDING AND MULCHING
INSPECT FOR AREAS OF EROSION BELOW THE BLANKET AFTER EACH
EROSION CONTROL BLANKET STORM EVENT; REPAIR AREAS OF EROSION BY REMOVING AFFECTED AFTER FINISH GRADING
PORTION OF BLANKET, ADD SOIL, RESEED, RELAY AND STAPLE BLANKET;
INSPECT PERIODICALLY AFTER VEGETATION IS ESTABLISHED
INSPECT FABRIC BARRIER AFTER STORM EVENTS AND MAKE NEEDED
INLET PROTECTION REPAIRS IMMEDIATELY; REMOVE SEDIMENT FROM THE POOL AREA WHILE AFTER EACH INLET IS PLACED
AVOIDING DAMAGING OR UNDERCUTTING THE FABRIC
SEED, SOD LANDSCAPE KEEP SOD MOIST UNTIL FULLY ROOTED; WATER AS NEEDED AFTER FINISHED GRADING AROUND FINISHED UNITS
AROUND UNITS FINISHED
REMOVAL OF STRAW BALES N/A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL. OF INLET PROTECTION N/A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
REMOVAL OF SILT FENCE N/A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
EDGE OF BLANKET SHALL BE
BE ANCHORED IN A 6" DEEP
X 6" WIDE TRENCH.
NON —WOVEN
FILTER FABRIC
EXTENDS INTO TRENCH
LINE ENTIRE WASHOUT WITH
PLASTIC, ANCHOR W/ STAKES
STRAW BALES STACKED 2
HIGH ALONG PERIMETER
NOTE: ALL EROSION CONTROL BLANKETS SHALL BE INSTALLED
PER MANUFACTURER'S RECOMMENDATIONS BASED ON THE
PROPOSED TYPE AND USE.
TYPICAL EROSION CONTROL BLANKET
6" MULCH BOTTOM OVER
NON— PERMEABLE POLY —LINER
EROSION CONTROL BLANKET REQ'D.
NORTH AMERICAN GREEN SC150 OR EQUAL
BLANKET TO BE STAPLED IN PLACE
WITH STAPLES AT 2 PER SQUARE YARD.
EDGE OF BLANKET SHALL BE
BE ANCHORED IN A 6" DEEP
X 6" WIDE TRENCH.
4:1 MAXIMUM SLOPE
EDGE OF BLANKET SHALL BE ANCHORED IN A
12" DEEP X 6" WIDE TRENCH.
TRENCH MU I W von Ur WHEN JOINING TWO OR MORE
DITCH SILT FENCES WRAP THE TWO
END POSTS TOGETHER AND
SILT FENCE DETAIL DRIVE INTO THE GROUND TOGETHER
CONSTRUCT DIVERSIONARY DITCHES
IF STOCKPILE RESTRICTS UPSTREAM
DRAINAGE FLOW
SLOPE CHECK
SILT FENCE
STOCKPILE MATERIAL
l
NO SCALE
DITCH CHECKS REQUIRED
EVERY 400'
STOCKPILE EROSION CONTROL
SLOPE CHECK
SILT FENCE
DRAINAGE
OFFSITE
SEDIMENT TRAP
STONE OUTLET
(SEE DETAIL)
O
A C J G p
1/41
0 V•• R ke
00
Z 00
0
L r
0
0
0
N)
CNI
0
O
5
a
0
0
0
c
cn
w
O
f�
SHEET NO.
C600
m