Loading...
HomeMy WebLinkAbout04090039 Plans 05 Sheet 5 of 09 Grading Plansa ss, GRAPHIC SCALk C 20 /--0 1 inch 20 ft. 847.65^ 847.13 847.6 847.1 1 1\189°55 O i,j E PROPOSED BUILDING 11,100 s.f. O fb 7 6a..i bo 4 E].. 847.6 847_.1 847:2 847 .,2 55' PROPOSED ROW 5' PROPOSED SET BACK 846.7_ 846.2 +g 1 CURRENT 0 RDINANCE. Nc' H +H° 0 oLF� 848.5 1 +0ha'L 84 t__ 8.0 ao 45' R/W Line per Carmel Thoro, Plan 848.5 ;848 COURTYARD COMMONS 848.4 847.9 846.3 845 L 848.3 847_8 _1, +O a t 1_847.3] l8476_i +,00 848.7 I 848.1 _8487_ 848.6 848.1 848.5 848.0 848.1 848.0 848.3 847.8 848.4 847.9 A9H0 OOOa 847.8 847 848.2 847.8 847.8 847.3 it _847_6~ 8471 847.4 _846,9 4• dommok f $4 6.5 I $46.0 1 845.4_ /i 1 X 8 45. 15) 845.1 1 845. 0 845 r 1 +yo y'J 4 845.0 191 844.7 2 845. 844.7 ri 845.1 844.6_ 845.2 45P 844.7J ati 845.7 845.2 846.31 845.8 846.9 846.4 6 �N 846.4 846.3 845.8: j a 4 +c) 4'4) GRADING GENERAL NOTES: LEGEND GRADING BOX MATCH EXISTING GRADE HIGH POINT FLOW DIRECTION PROPOSED FINISHED FLOOR _886.50 886.00 F.F. EL. 778.1 1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS FROM THE ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 2. THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTOR'S AND /OR UTILITY COMPANIES SO AS NOT TO CAUSE DAMAGE, 3. PROVIDE POSITIVE DRAINAGE WITHOUT PONDING, IN ALL AREAS AFTER INSTALLATION, CONTRACTOR TO TEST FOR, AND CORRECT, IF ANY, "BIRD BATH" CONDITIONS. 4. THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES 72 HOURS BEFORE CONSTRUCTION IS TO START, TO VERIFY IF ANY UTILITIES ARE PRESENT ON SITE. ALL VERIFICATIONS (Location, size, and depth) SHALL BE MADE BY THE APPROPRIATE UTILITY COMPANIES. WHEN EXCAVATING IS AROUND OR OVER EXISTING UTILITIES, THE CONTRACTOR MUST NOTIFY THE UTILITY COMPANY SO A REPRESENTATIVE OF THAT UTILITY COMPANY CAN BE PRESENT TO INSTRUCT +ooa AND OBSERVE DURING CONSTRUCTION. 5. ALL PROPOSED SPOT ELEVATIONS ARE THE FINAL PAVEMENT AND FINAL GRADE ELEVATIONS. 6. TRENCHES FOR ALL STORM PIPES ARE TO BE BACKFILLED COMPLETELY WITH ENGINEERED GRANULAR MATERIAL IF WITHIN 5 FEET OF PAVEMENT. 7. SEE APPROPRIATE DETAILS TO DETERMINE SUBGRADE ELEVATIONS BELOW FINISH GRADE ELEVATIONS INDICATED. 8. CONTACT UTILITY COMPANIES PRIOR TO REMOVAL OR ABANDONING OF ANY EXISTING UTILITY LINE. DON'T DIG BUN 1- 800 382 -5544 CALL 3 -FQR= YOU DIG 1) 0 SCALE: 1" 20' 5 DATE: OCTOBER 6, 2004 PROJECT NO. 2004 -0029 SHEET NO. 0 n J ti 2 a o C. N c) 6 a) .0 as O) U Z LE 2 W Ti; OF 9