Loading...
HomeMy WebLinkAbout05020019 06 P105 Erosion Control Plan1 DRAWN BY: PRC 1 ESTRIDGE DEVELOPMENT COMPANY, INC. CARMEL, INDIANA SHEET TITLE: EROSION CONTROL PLAN DRAWING FILES: R: \5K \5076 \001 \DWGS \P105 XREF: PRE3 XREF: 5076001S SHEET NO.: po-- 05 [Y1 ZY INDIAI DATE: 02/18/05 PROJECT NO.: 5076.001 DRAWN BY: PRC CHECKED BY: JCC SHEET TITLE: EROSION CONTROL PLAN DRAWING FILES: R: \5K \5076 \001 \DWGS \P105 XREF: PRE3 XREF: 5076001S SHEET NO.: po-- 05 PRO` EC t lIL ��4Nl1► mw►r�w.Nipl w.. MI �s1 vM�B�.7t.- aasr.�v� �v. 1s4 .�OS4n�i7�►�e.1l�.ay`r.1►.01∎11 1: r ap.. ts► �sew_m��at+w- ��.�wa���a►trs�s� �s.�a�.�a�.!��.��,��e► -ar w�► �4. �mo.��sA��.��� rm.�e►' Dper► sa�a��tn�. mowmop►o��maia►oiva w�wasm RIP RAP SEE LAKE #2 DETAIL 11) ORMAL PQOL ELEV =905 50 100 YRAIR ELEV 908.00 COMMON AREA "A" J��.i}ll3vv�J�.h_Jl./'� 1'`./ �J'.l 1Jti... �1�. �1_ r�. r`. L/\ i' J�-/ •�/',�h..n`/`.- ir...n- /'w./` BM THE HORIZONTAL AND VERTICAL LOCATION DATA SHOWN ON THIS SURVEY ARE BASED UPON A POSITIONAL SOLUTION DERIVED FROM GLOBAL POSITIONING SYSTEM (GPS) OBSERVATIONS PROCESSED BY NATIONAL GEODETIC SURVEY (NGS) UTILIZING THEIR ONLINE POSITIONING USER SERVICE (OPUS) SOFTWARE. THE COORDINATE VALUES SHOWN ARE IN THE INDIANA STATE PLANE COORDINATE SYSTEM EAST ZONE ON THE 1983 NORTH AMERICAN DATUM (NAD83) UTILIZING THE CONTINUOUSLY OPERATING REFERENCE STATION (CORS) ADJUSTMENT AS DETERMINED BY NGS. OPUS POINT #200 ELEVATION 910.88 FT (NAD83) TBM 1 CUT "X N. BONNET BOLT, FIRE HYDRANT 40 FEET SOUTH OF THE NORTHEAST BOUNDARY CORNER, 50 FEET EAST OF CENTERLINE OF TOWNE ROAD ELEVATION 914.55 FT TBM 2 CUT "X S. BONNET BOLT, FIRE HYDRANT 30 FEET NORTH OF THE SOUTHWEST BOUNDARY CORNER ELEVATION 915.39 FT TBM 3 CUT "X N. BONNET BOLT, FIRE HYDRANT 40 FEET NORTH OF CENTERLINE OF 141ST STREET, CENTER OF SITE ELEVATION 914.54 FT TBM 4 CUT "X S. BONNET BOLT, FIRE HYDRANT 30 FEET NORTH OF CENTERLINE 141ST STREET, 100 FEET WEST OF TOWNE ROAD ELEVATION 911.98 FT DUSTING 12' WATERLINE LAKE #1 ORMAL POOL ELEV= 903.50 1 00 AR ELEV D6.75 COMMON AR "E" Existing Storm Sewer New Storm Sewer Existing Sanitary Sewer New Sanitary Sewer 000 Existing Contour Flow Arrow w Water Main ILIECTIE2NED) HATCH PATTERN DENOTES TEMPORARY SEEDING HATCH PATTERN DENOTES PERMANENT SEEDING HATCH PATTERN DENOTES EROSION CONTROL BLANKET MATCH LINE SEE SHEET P106 HOLEY MOLEY SAYS DON'T DIG BLIND "IT'S THE LAW" CALL 2 WORKING DAYS BEFORE YOU DIG 1- 800- 382 -5544 CALL TOLL FREE PER INDIANA STATE LAW IS -69 -1991. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING WORK. ASSUMED NORTH SCALE: 1"=60' EROSION CONTROL AND SEQUENCING 1, CONTRACTOR SHALL INSTALL ALL REQUIRED SILT FENCES, SILT TRAPS, TREE PROTECTION AND INLET PROTECTION FOR EXISTING INLETS PRIOR TO THE START OF ANY EARTH MOVING OR STRIPPING. 2. CONTRACTOR SHALL INSTALL A STONE CONSTRUCTION ENTRANCE OR SOME OTHER DEVICE PRIOR TO THE START OF EARTHWORK AS NECESSARY TO PREVENT SOIL FROM BEING TRACKED OR WASHED INTO EXISTING ROADWAYS. 3. LAND ALTERATIONS WHICH STRIP THE LAND OF VEGETATION, INCLUDING REGRADING, SHALL BE DONE IN A WAY THAT WILL MINIMIZE EROSION. WHENEVER FEASIBLE, NATURAL VEGETATION SHALL BE RETAINED AND PROTECTED. AS GRADING IS DONE, INSTALL SILT TRAPS, SILT FENCES, SLOPE DRAINS, TEMPORARY DIVERSIONS AND OTHER RUNOFF CONTROL MEASURES AT APPROPRIATE LOCATIONS TO KEEP SEDIMENT CONTAINED ON SITE. 4. ALL DISTURBED AREAS SHALL BEE SEEDED AND STRAW MULCHED AS SHOWN ON THE PLANS IMMEDIATELY AFTER COMPLETION OF GROUND ACTIVITY. FOR LARGE PROJECTS, THIS SEEDING SHOULD BE COMPLETED IN PHASES AS THE DIFFERENT AREAS OF THE SITE ARE COMPLETED. 5. THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM DEPENDING UPON THE WEATHER. IF CONSTRUCTION ACTIVITY IS TO CEASE FOR MORE THAN TWO WEEKS, THE DISTURBED AREAS SHALL BE TEMPORARILY SEEDED. 6. ALL STORM SEWER INLET PROTECTION DEVICES SHALL BE PUT IN PLACE AT THE TIME EACH INLET IS CONSTRUCTED. 7. CONTRACTOR SHALL MAINTAIN EROSION CONTROL MEASURES AND DEVICES DURING CONSTRUCTION AND UNTIL SILTATION OF THE STREETS AND STORM SEWERS WILL NO LONGER OCCUR. 8. ONCE ONSITE EROSION AND SILTATION OF THE STREETS AND STORM SEWERS WILL NO LONGER OCCUR, THE CONTRACTOR SHALL REMOVE AND DISPOSE OF THE TEMPORARY EROSION CONTROL DEVICES. 9. THESE GENERAL PROCEDURES MAY NOT COVER ALL SITUATIONS. REFER TO EROSION CONTROL PLANS FOR SPECIFIC NOTES AND ADDITIONAL DETAILS. DATE: THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF THE SCHNEIDER CORPORATION, AND ARE NOT TO BE USED OR REPRODUCED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER CORPORATION. COPYRIGHTED BY THE SCHNEIDER CORP. (2005) Schneider THE SCHNEIDER CORPORATION Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 -1037 Telephone: 317.826.7100 Fax: 317.826.7200 www.schneidercorp.com Architecture Civil Engineering Environmental Engineering Geotechnical Services GIS LIS Home Builder Services Interior Design Land Surveying Landscape Architecture Transportation Engineering