Loading...
HomeMy WebLinkAboutC805 Street DetailsCA\V CUT FOR -LEAN BREAK ��,e SURFACE EXISTING PAVEMENT OR X A, x X A, Do TT NOTE TO CONTRACTOR: cS �S -HALK 4 TRICK aO THE CITY OF CARMEL AND THE �F\ IL LEN _FT AUD\ �F\ HAMILTON COUNTY SURVEYOR'S x OFFICE REQUIRE DOUBLE WALL HANCOR HI -0 SSD PIPE OR ��4 N 12" PL -OFORITE EQUAL TO BE USED. MAUSCAL TO BE FINISHED le" BELOW THE EIISTING PAVEMENT BOTH SIDES -PORARY SEEDING SHALL BE DONE OF TRENCH IN ACCORDA 11 TH SECTION 621 PLOWABLE FILL TO BE PLACED OF FECH. SPECIFICA DIF-IN ENT IRE TRENCH TO BOTTOM OF THE STREET RIGHT-OF-l-. NOTE CONCRETE ELEVATION. 1. NE SURFACE IS TO BE SLOPED AT THE SAME RATE AS THE FRISTING SURFACE. NOTE 2 E ISTING PAVEMENT IS TO BE SAW CUT FOR A CLEA BREAK. THAT ALL CONCRETE AND BITUMINOUS MATERIAL PRODUCTION, 3, TRENCH SPOIL IS TO BE REMOVED FROM SITE TRANSPORT AND DELIVERY, PAVING AND PLACEMENT OPERATION, P I S" H.A #11 SURFACE FOR IMPROVEMENTS LOCATED WITHIN EXISTING OR FUTURE CITY OF b BITUMINOUS TACK APPLIED A' PER "INDIFrl, DEPT. DF FIGHKOALS STANDARD SPECIFICATION CARMEL RIGHT —OF —WAY SHALL CONFORM TI-) THE REOUIREJAENTS OF 40 F, 902. THE INDOT STANDARD AND SUPPLEMENTAL SPECIFICATIONS, LATEST C ALL LANE MARKINGS, STRIPING, 'TOP BARS, EDITION. ETC. DISTURBED OR REMOVED DURING E X C AVATION ACTIVITIES, SHALL BE RETURNED TO THE ORIGIN CONDITION E 13 1 7 P CCNCGETE IS TO B E FINISHED 1 5" ISTI BELOW THE ER a PI'AE Al ENT 8 CU T SHA F BE STEEL PLATED DURING CO CURE TIME AND UNTIL ASPHALT IS ADD SLOPE ASPHALT PATH TO ROAD ITV 1/4 O F T IN oR TOWARD TOP OF BANK OF DITCH TYPICAL ASPHALT ASPHAL PATH 110 SF PITUM SURF4CE NO 11, LIJ ON PEDESTRIAN PATH X—SECTION 2�0# IYE BITUM BINDER NO 8 LV ON COMP AGGREGATE BASE, SIZE NO. 5- MAX. 50' AIAG, 50' TIP IF cIRB I- II-ENT TIINSo VTIAIAIABE OANT1A7T WHEN BUILT IN CONDUCTION WITH CONCRETE PAVEMENT, EAPAUISIOI] AND CONTRACTION JOINTS SHOULD BE PLACED AT THE SAME LOCATIONS AS IN TH PA/EMENT SLABS THE CURB AND GUTTER SHOULD BE TIED TO THE PAVEMENT BY 1/2" ROUND DEFORMED BARS AT ABOUT 3 FOOT INTERVALS. IF NO CONCRETE PAVEMENT IS BEING STILL AT THE TIME THE CURB IS CONSTRUCTED, EXPANSION JOINTS SHDFUD BE PLACED AT THE ENDS OF ALL RETURN AN AT INTERVALS NO TO EXCEED 50 FEET. CONTRACTION JOINTS IN TANGEN SECTION I SHOULD BE INSTALLED AT 10 FOOT MAX SPACING. CONTRACTION JOINTS ON RADII SHOULD BE INSTALLED AT 5 FC OF MAX. SPACIFI CURB JOINT DETAIL HA IF 200E F 1 33 IN 11-1 U INDEL IF 11 111 17, no I U MI IF IND �o l:S 0 �l INIF FIF I �1' -1 1111 .1 IYPICAL SIDWIALB SECTION I INI I- BEHIND IN' I IUII III IN IF KILLER 'IT' OIRRI ELRATION AND RONPACES IN DEFER5 RATERRU M TLE O F "T TO G F, SUaRBAar OR EASE JUDER IF F-S SIDEAALIA AND DRDES BE CORIACTED IN ACCO— SECTANN 20CCX OF TUL 5AI-I S11,711"BlED n A IR- T U7 L PIPE 7 r A "-F-I F 7 —A UNDIBURAIN CT IF,W%UNU,) REMNTS -1 SECTION 206,17 HIST. H LL FOR-1 UC A-I E 0 F SGH- E SHALL ECTFICIBOIS IN— NSBBDID ROPH IIICI r PAIIIIEND WHORE REQUIREI CITY OB CARMEL STANDARDS D 1� G, T-11 CONCIRETE DE-K CITY OF CARMEL STANDARDS SUD-111K 7717177��"' 14 SUBSUREACL GRoN I'll NOTES @I n,= E, D B -1-RU, �A. al -N, I hHO-I z� pay 1,H. a B- 5lenaard Drawing E E.1— 1 B, FAIA.-I, -a— -1, 11 1. -.1 H- F SNESMEND1 ;7� hI—N mN0 /-S a A "R,,G na .T I TA111 111 n �ILI� 1 Aldo axa CONYTE7E SOL e1oS? GI TTER u- oO' R/W 30'-0' 2�—O" 2'— 0 13'-0" 13'-0" S LOPE A /A FT SLOPE _MN 1/4 FT RUN ,A A A ET1TNEN'FJ'1'1EEX`NU1V E 'TNNEN' UNDER 'cure CAN PICTEP _C11DE ALL PAVING IS TO BE COMPLETED IN ONE PAVING SEASON. 1.5 P.AG, AUFF—E #11 2 H. A.C. BINDER 118 3" H.A.G. BASE BAD 7 COMPACTED jj 53 STONE 1OF—CTEG SUBGRACE PAVEMENT COMPOSITIONS NOT-TC-SCALE 4'-0" 5'-0" 1'-0" SIDE-TS 4" THAD- SLOPE 1 FT. ROLL CURE GUTTER TYPE I L/ L Final bcOkfill for water mains, Voter service laterals, sanitar mains and sanitar service laterals under and within —feet of pFEvern2rit shall at E—Barrow for Structure EDEkfill meetin the material re of the INDOT and shall be compacted in 6—inch rnEl,imurn lifts to not less than 957 Standard Proctor Densit for the entire depth of the material placed. The bockfill for the top 6—inches 3f the excavation below the start of the a subbase of the pavement shall be No Si Stone meetin the material re of the INDOT and shall be compacted to not less then 95% Standard Proctor Densit If the standard practice of the utilit that his jurisdiction over the installation his a more strin final Lockfill re the more strin re shall g overn. 'PF T)N?EH FTYPIEFF "D IT a =D— IFEE L lid 1. Th. I,U1, p N DI ..p and fla-di hdi-d bY Ih- Blt- ii Z, ahall E, INE,IdAd. fia Al at,i, -11 b. —d. 8. Ti Rhal b Iii- shall bl� I �Rffhi HB. Z.1 a- Pin NOTES SE -E. A. -U, -H- K-- RAMP CONSTRUCTION DETAIL A NOTES 1 01 Se5 tlND -11, I A.-I OA 15 BES-1--r- AR.-I I F -A-D 13 1-14, 10. a. N. a. I- I S-1 Co, 1 IN i. AS,- 'I EII'DIIIL 19358 STATE OF ON N o C) S� ('0 1 :z T U) V) m Y CC 48 LL Old of! DO F5 L1 Z `A W w U) I-- I-- to 0 Lid Ld l LI Ll Z 2) I p I Ll 0 Ld U) Cl) 0 -i 0805