Loading...
191880 11/10/2010 CITY OF CARMEL, INDIANA VENDOR: 362171 Page 1 of 1 ONE CIVIC SQUARE WALSH CONSTRUCTION CO CARMEL, INDIANA 46032 CHECK AMOUNT: $293,670.70 2749 N STATE ROAD 39 L _off io LA PORTE IN 46350 CHECK NUMBER: 191880 CHECK DATE: 11/10/2010 DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION 920 4470504 9 293,670.70 RETAINAGE CITY OF CARMEL PROJECT NO. 07 -08E Keystone Parkway Main Street Interchange Progress Estimate Summary Sheet Et Signature Page Progress Estimate No 9 Partial X Final Earned to date 11,487,608.41 Previous payments 11 ,3 0 7, 1 28.87 Earnings this estimate 180,479.54 Retainage (2 67 Amount due Contractor 474,150.24 CONTRACTOR: DATE: Wa Construction Company Phone: (219) 324 -4320 2749 North State Road 39 Fax: (219) 324 -4719 LaPorte, IN 46350 CONSULTANT: DATE: 11 i AM ICAN STRUCTUREPOINT, INC. Phone: (317) 547 -5580 7260 Shadeland Station Fax: (317) 543 -0270 Indianapolis, Indiana 46256 -3957 APPROVED BY: Z"��z DATE: CITY OF CARMEL Construction Pay Estimate Report 11/5/2010 9.01 AM City of Carmel FieldManager 4.5a Contract: _07 -08E, Keystone Parkway and Main Street Interchange Estimate Estimate Entered Estimate Managing No. Date By Type Office 9 11!312010 David Machala MONTHLY American Structurepoint, Inc. All Contract Construction Prime Contractor Work Completed Started Date Walsh Construction Company 2749 North State Road 39 Laporte IN 46350 Comments Item Usage Summary Project: 07 -08E, Keystone Parkway and Main Street Interchange Category: 1, Keystone Parkway and Main Street Interchange Prop. Project Item Mod. Item Description Unit Item Code Ln. Line No. Type No. Quantity Item Price Dollar Amount Payment Adjustment, PG Asphalt DLRS 0706 0002 0010 00 000 100.610 1.00 $100.61 Binder Excavation, Common CYD _0008 0012 0060 00 000 10,970.300 8.64 $94,783.39 HMA Intermediate, Type D TON _0324 0037 0185 00 000 143.110 46.00 $6,583,06 Asphalt for Tack Coat TON _0327 0040 0200 00 000 6.700 527.00 $3,530.90 Barrier Delineator EACH _0032 0054 0270 00 000 53.000 15.00 $795.00 Curb Ramp, Concrete, G SYD _0349 0059 0295 00 000 10.700 105.00 $1,123.50 Sidewalk, Concrete, 4 in. SYD _0357 0063 0315 00 000 35.600 29.00 $1,032.40 PCCP for Approaches, 6 in. SYD _0716 0073 0365 00 000 66.786 37.00 $2,471.08 Seal Coat, Graffiti Resistant SFT _0388 0095 0475 00 000 9,802.420 0.44 $4,313.06 Surface Seal SFT _0389 0096 0480 00 000 9,802.420 0.32 $3,136.77 Adjust Meter Pit to Grade EACH _0725 0115 0575 00 000 1.000 736.60 $736.60 Sign, Sheet, Encapsulated Lens SFT 0449 0169 0845 00 000 17.370 14.00 $243.18 with Legend, 0.080 in. Thickness Conduit, Steel, Galvanized, 2 in. LFT _0461 0176 0880 00 000 5.000 11.50 $57.50 Light Standard Foundation, 3 it. EACH 0464 0180 0900 00 000 3.000 988.00 $2,964.00 DIA x 8 ft. Conduit, PVC, 2 in., Schedule 40, LFT 0738 0184 0920 00 000 90.000 5.50 $495.00 for Electric Pole Circuit Cable, 1 C No. 10 LFT 0477 0195 0975 00 000 602.500 0.50 $301.25 Stranded Copper Conduit, PVC, 2 in. LFT _0457 0257 1285 00 000 90.000 5.00 450.00 Gravity Retaining Wall SFT _0822 0267 1331 CO 001 725.060 35.31 $25,601.87 Rework at Structure 129 LS _0834 0274 1338 CO 003 -1.000 7,496.86 7,496.86 Premium Time for Sunday Work LS _0835 0281 1345 CO 004 1.000 6,441.11 $6,441.11 Change Existing Panel Sign LS _0836 0282 1346 CO 004 1.000 6,934.62 $6,934.62 Locations at 106th Street Contract ID: _07 -08E Estimate: 9 Page 1 of 3 Construction Pay Estimate Report 1115/2010 9:01 AM City of Carmel FieldManager 4.5a Item Usage Summary Project: 07 -08E, Keystone Parkway and Main Street Interchange Category: 1, Keystone Parkway and Main Street Interchange Prop. Project Item Mod. Item Description Unit Item Code Ln. Line No. Type No. Quantity Item Price Dollar Amount Additional Work at North End of LS _0854 0283 1347 CO 004 1.000 1,126.98 $1,126.98 NWR Adjacent the Gravity Wall Construction Sign, Type D EACH _0838 0284 1348 CO 004 5.000 55.76 $278.80 Rework at Structure 129 LS _0853 0285 1349 CO 004 1.000 5,087.55 $5,087.55 Payment Adjustment Regrade Ditch North of Structure LS _0840 0286 1350 CO 004 1.000 2,408.97 $2,408.97 129 due to Conflict with Private Water Line Install New Culvert Pipe at STA LS _0841 0287 1351 CO 004 1.000 2,761.50 $2,761.50 56 +73, Rt. (Lamar Property) Additional Riprap Installed at LS _0842 0288 1352 CO 004 1.000 4,425.90 $4,425.90 Outfall of Structure 129 Rework Side Ditches on South LS _0843 0289 1353 CO 004 1.000 3,153.95 $3,153.95 End of Project on East and West Sides Regrade Concrete Curb Ramp on LS _0844 0290 1354 CO 004 1.000 525.94 $525.94 NE Corner of Main /Harrowgate Prepare Grade for Sidewalk Along LS _0845 0291 1355 CO 004 1.000 1,889.35 $1,889.35 East Side of Carlin South of Main Street Extend Riprap to North at STA LS 0846 0292 1356 CO 004 1.000 852.39 $852.39 585 +50, Rt. Additional Riprap Installed at LS _0847 0293 1357 CO 004 1.000 367.63 $367.63 Outfall of Structure 132 Additional Riprap Installed at LS 0848 0294 1358 CO 004 1.000 1,434.08 $1,434.08 North End of MSE Wall C Additional Modular Block Wall at LS 0852 0295 1359 CO 004 1.000 2,468.46 $2,468.46 Augenburg Property Subtotal for Category 1: $180,479.54 Subtotal for Project 07 -0aE: $180,479.54 Total Estimated Item Payment: $1 Time Charges Site Site Description Site Method Days Charged Liq. Damages 00 Overall Contract Site Completion Date -231 $0 Total Liquidated Damages: $0 Contract ID: _07 -08E Estimate: 9 Page 2 of 3 ACCOUNTS PAYABLE VOUCHER CITY OF CARMEL An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc. Payee Walsh Construction Company Purchase Order No. 21372 2749 North State Road 39 Terms LaPorte IN 46350 Date Due Invoice Invoice Description Amount Date Number (or note attached invoice(s) or bill(s)) 11/05/10 Pay Ap 9 Keystone Reconstruction Project $293,670.70 Keystone Parkway 131st St Interchange Construction Project 07 -08 Retainage Paid: $293,670.70 Retainage Remaining: $293,370.69 1 Total $293 I hereby certify that the attached invoice(s), or bills(s), is (are) true and correct and I have audited same in accordance with IC 5- 11- 10 -1.6. 20 Clerk- Treasurer f J VOUCHER NO. WARRANT NO. Walsh Construction Company ALLOWED 20 2749 North State Road 39 IN THE SUM OF LaPorte IN 46350 293,670.70 ON ACCOUNT OF APPROPRIATION FOR Walsh Construction Company PO# or INVOICE NO. ACCT #/TITLE AMOUNT Board Members DEPT.# 21372 Pay Ap 9 4470504 $293,670.70 1 hereby certify that the attched invoice(s), or bill(s) is (are) true and correct and that the materials or services itemized thereon for which charge is made were ordered and received except November 8, 20 10 Totaf $293,670.70 ignature Cost distribution ledger classification if City Engineer claim paid motor vehicle highway fund Title