HomeMy WebLinkAboutMinutes TAC 02-21-07CARMEL TECHNICAL ADVISORY COMMITTEE MINUTES
Date: February 21, 2007
Place: Department of Community Services Conference Room
3rd Floor Carmel City Hall
Time: 9:00 AM
9:00 a.m. Applegate Condominiums Tabled
The applicant seeks the following development standards variance and special
use approvals:
Docket No. 07010002 V Section 23D.03.C.3.k(ii) maximum building
height
Docket No. 07010003 V
Docket No. 07010004 V
Docket No. 07010005 V
Docket No. 07010006 V
Section 23D.03.C.3.f(i)
Section 23D.03.C.3.i(i)
Section 23D.03.C.3.a(ii)
Section 23D.03.C.3.e(ii)
parking in front yard
roof pitch
building mass /width
landscape
requirements
Docket No. 07010007 SU Section 10.02.A special uses
Docket No. 07010014 V Section 23D.03.C.3.c.iii(b) lot coverage over
70%
The site is located at 130 Second St. NW, and is zoned R -4 /Residence within the
Old Town Overlay Character Subarea. Filed by Thomas Lazzara for On Track
Properties, Inc.
9:15 a.m. Docket No. 07020003 DP /ADLS: Carmel Orthodontics
The applicant seeks to construct a 2 -story medical office building on 2.59 acres.
The site is located on the southwest corner of Carmel Drive and Guilford Road,
and is zoned M3.
Filed by Ashton Fritz of Schneider Engineering for Carmel Orthodontics.
Present for the Petitioner: Ashton Fritz of Schneider Engineering and Toni
Grimes of Ratio Architects
Overview: Ashton Fritz. This parcel is part of the Carmel Science and Tech
block 11 subdivision that brought through TAC late last year. It is labeled Lot 5
and is located between Guildford and the new City Center Drive on the South
side of Carmel Drive. The application is for a 24000 sq. ft. office building
including an orthodontics office and leasable office space.
Greg Hoyes, Hamilton County Surveyor's Office: Sent letter outlet permit
and send revised set of construction plans.
Ryan Hartman, Clay Township Regional Waster District: Sent letter need
updated application.
Christine Barton Homes, DOCS sent letter, other than what is in letter no
further comments.
S:/ TechnicalAdvisorCommittee /TACMinutes /2007 /Feb21
Shirley Hunter, Duke Energy distributed cards, new business call center for
application for service. Questioned utility easements on the site, will need a
utility easement on the lakeside side of it property. That can be platted or we can
write the easement. Typically it is platted so that it is a utility easement, so that
other utilities can use it also. Cannot bring service from Carmel Drive. Duke
Energy requests a utility easement along east property line. Ms. Hunter asked
when construction will begin. Petitioner responded summer. Duke does not
have anything for temporary power, so the process needs to begin for permanent
power.
Nick Redden, City of Carmel Engineering Still under review, Engineering
will send a letter with comments.
Gary Hoyt, Carmel Fire Department Emailed letter. Need to meet to discuss
a location for the fire department connection for the building, since it was not
noted on the plans. There will be no basement
If the building will have a fire alarm system the fire department requests an
annunciator panel located at the main entrance. Also request a Knox box. These
can be obtained at Knoxbox.com
Karyn Ryg, DOCS Sent a letter. Based on parking ordinance you will need 5
bike parking spaces based on the count, and then looks like you are missing a
sidewalk connection from the cul de sac to the actual building. Included in the
letter we would like to see a connection from Guilford, please look at the
location.
Matt Griffin, DOCS March 20 Plan Commission. We will need the
comments you are getting addressed, by the March 9 th packet deadline.
Especially the comments from our Department, which will come from Christine.
You will receive a letter Scott Brewer the Urban Forester.
End
9:30 a.m. Docket No. 07020007 ADLS: Riverview Medical Park Building 2.
The applicant seeks architecture, design, landscaping, lighting, and signage
approval to build one; one story, 18,785- square foot medical office building on
3.07 acres, within the Riverview Medical Park project.
The site is located at 14555 Hazel Dell Parkway, and is zoned PUD.
Filed by Tim Hull for Plum Creek Partners.
Present for Petitioner: Tim Hull for Plum Creek Partners and Ashton Fritz of
Schneider Engineering
Overview: Southeast corner of Hazel Dell and 146 Street there is currently a
35000 ft building there already. This building will be behind existing medical
bldg, abutting up to the church property. Will finish out and complete the
medical park. Observed that no one received plans.
Matt Griffin, DOCS this was a planned PUD site, so technically the
Development Plan and the ADLS have addressed their access and drainage.
They are coming back to get building approval which is architectural and
landscaping
S:/ TechnicalAdvisorCommittee /TACMinutes /2007 /Feb21 2
Greg Hoyes, Hamilton County Surveyor's Office, requested clarification on
parking.
Petitioner: More parking will be put in.
Ryan Hartman, CTRVVD no comment
Christine Barton- Holmes, DOCS No comments at this time
Shirley Hunter, Duke Energy would like to see a copy of site plan.
Distributed cards with new numbers. A new service request and CAD drawing
was also requested. Shirley will be contact.
Nick Redden, City of Carmel Engineering Engineering would like to see a
set of plans also.
Gary Hoyt, Carmel Fire Department See as set of plans is there any
intention of sprinkling petitioner answered no. The Fire Department will
require a Knox box on the building.
Karyn Ryg, DOCS only comment is regarding sidewalk southeast corner no
connection to that south drive. Please add a connection there. Would like to see
bike parking provided.
Matt Griffin, DOCS how does this building breakout in phases in A B 1St
will you be doing landscaped, etc.
Petitioner: indicated on a visual 1S phase is 10,000 sq. ft; once 1S section is
leased site improvements will be completed landscaped and grass will be
hydoseeded.
Shirley Hunter, Duke Energy indicated that Duke Energy has the address for
this as 14555 used for other bldg. Does it need new address
Matt they will need to coordinate with Bill Akers.
This will be brought to the March 20 Plan Commission Meeting.
END
9:45 a.m. Docket No. 07020009 SP: Cherry Tree Grove
The applicant seeks to plat 34 lots on 20.442 acres.
The site is located at 14400 Cherry Tree Avenue and is zoned PUD.
Filed by Dennis Olmstead of Stoeppelwerth Associates for RDJ Land
Development.
Present for the Petitioner: Brian K. Robinson of Stoeppelwerth
Overview: This a property of 18 acres plus or minus on the east side of Cherry
Creek Road just north of the Cherry Creek estates project. Sanitary sewers,
S:/ TechnicalAdvisorCommittee /TACMinutes /2007 /Feb21
drainage and water we are all getting from the south from CCE. We have
established easements for this. It is a PUD.
Greg Hoyes, Hamilton County Surveyor's Office Sent a comment letter.
Have some issues. Will be doing a site visit soon.
Petitioner: Received letter, has not yet reviewed. Used a visual. Will revise
calculations based on that.
Ryan Hartman, Clay Township Regional Waste District not within service
area.
Christine Barton Holmes, DOCS No comments at this time.
Shirley Hunter, Duke Energy gave card with contact information. Also a
card to call in and make a service request for the subdivision. Duke had
requested a primary plat that the common area off of Cherry Tree Rd. be
dedicated as a utility easement
Petitioner: Common area 1 dedicated as USSL
Shirley Hunter, Duke Energy Contact to know the average sq. footage and to
know if they will be using gas or electric that is very important. We also need an
Auto CAD file, this is very important can email to Shirley.
Nick Redden, City of Carmel Engineering Engineering is still reviewing and
will send their comments soon.
Petitioner asked if the plans have been forwarded to Crossroads
Nick: responded that no they had not.
The petitioner also asked when he might expect a letter
Nick hopefully next week.
Gary Hoyt, Carmel Fire Department I emailed a letter apologize about first
comment. Would like an additional fire hydrant between lots 15 16. It keeps
the fire department from driving all around to get to lot 15 and 16.
Petitioner I do not see a problem with that
Karyn Ryg, DOCS No comments
Matt Griffin you will get a comment letter with some small adds to the plat
itself, docket number, etc.
At the entrance with sidewalk comes off the path, the Department would like to
see we would like to see that at a 90 degree angle if possible.
Questioned if street names have been finalized Bill Akers will be contacted.
S:/ TechnicalAdvisorCommittee /TACMinutes /2007 /Feb21 4
10:00 a.m Docket No. 07020012 Z: 1328 -1440 W. Main Street Rezone
The applicant seeks to create to rezone property from OM /SU and S2 within the
US 31 Overlay to B6 within the US 31 Overlay.
The site is located at the NE corner of US 31 (Meridian) and W. Main Street and
is zoned Old Meridian Special Use (OMSU), S2, and is within the US 31
Overlay.
Filed by Eugene Valanzano of Baker and Daniels for Browning Real Estate
Partners and the City of Carmel.
Present for the Petitioner:
Overview: Property consists of a 17 -acre parcel owned by St. Christopher's
church. We have submitted a rezoning application and a preliminary
development plan, which is really a multi use potential office and medical office
use and perhaps a small retail, have another piece of property that may be
suitable for a small office building. Done some preliminary drainage work which
we submitted to the city engineers and did have a preliminary meeting on that
last week, and came to conclusion on how property should drain, knowing that
there are drainage issues.
We talked about internal road, the uses and circulation plan. We are at the re-
zoning phase only.
Greg Hoyes, Hamilton County Surveyor's Office no comment
Ryan Hartman, Clay Township Regional Waste District this is not our
service area.
Shirley Hunter, Duke Energy no object to rezone.
Nick Redden, City or Carmel Engineering we have no comment on rezone.
Gary Hoyt, Carmel Fire Department no comment.
Karyn Ryg, DOCS no comment.
Matt Griffin, DOCS we support it.
Petitioner we will be following up with a development plan and ADLS after
that it will be parceled likely will be piecemeal.
Plan Commission March 20
END
10:15 a.m Docket No. 07020014 Z: Westmont PUD
The applicant seeks to create to rezone property from S 1 Residential to PUD for
the purpose of creating a single family detached residential subdivision.
The site is located at 2000 West 136th Street and is zoned S1.
Filed by Charlie Frankenberger of Nelson and Frankenberger for Platinum
S:/ TechnicalAdvisorCommittee /TACMinutes /2007 /Feb21
Properties LLC and Pittman Partners Inc
Overview: Charlie Frankenberger Steve Pittman and Paul Rioux in this
request for a change of zoning from S 1 to a Residential PUD ordinance to permit
a upscale, low density subdivision in western Clay Township. Requests pertains
to two parcels of real estate, both of which are east of towne rd and north of
136"'. One is commonly know as the Irsay property or Sweet Charity Farms and
is about 115 acres and the other parcel is owned by Randy and Rona Crook and is
approximately 20 acres. These parcels are shown visual displayed- Charlie
reviewed the visual. We have included both sets of plans for both parcels in the
TAC submittal, so everyone should have plans.
Grey Hoyes, Hamilton County Surveyor's Office Sent a letter to
Ed and copied Steve on it. Don't really have any concerns with the rezone, did
have quite a few comments on preliminary matters. The property has 3 regulated
drains. Have to comply with new manual. Will be a regulated drain. We will
have a meeting tomorrow to discuss some other items involving one on of the
regulated drains. Since Scott is not here, there is a requirement to separate
landscape from easements and drainage easements and not allowed to overlap
anymore. Agreement from last summer. Do not like landscape planning in our
easements.
Ryan Hartman, CTRVVD Have had several inquires about the Crook
property,one concern we may have is how we will divide the sewer service. I
know we have some preliminary plans that show. Out concern is coverage
Petioner do no know which set of plans you saw. There is a manhole here and
wha we are in the process. Indicated on visual map where sewer lines whould be
coming from. Discussion regarding the layout.
Need to have a full set of plans, profile of use.
Christine Barton- Holmes, DOCS —Charlie sent a letter with contents re
architecture no other comments.
Shirley Hunter, Duke Energy no comments at this time.
Nick Redden, City of Carmel Engineering still reviewing this project and
will get comments to you as soon as we can
Gary Hoyt, Carmel Fire Department emailed Ed a letter the other day? any
amenities being planned for the project.
Pet. There is an amenity there a pool house.
Gary Hoyt we will request a Knox box for that
Fire hydrant markers. Since these two parcels don't connect, it might be in the
best interest of public safety is we can separate them by name i.e. Estates of
Westmont and Westmont connecting through Westside estates.
Petitioner have talked to Bill Akers about this, spoke of different options, we
will look at this.
S:/ TechnicalAdvisorCommittee /TACMinutes /2007 /Feb21 6
Karyn Ryg, DOCS sent a letter a couple of weeks ago. Just in looking at
plans at a couple of locations particularly the north side to the east sidewalks did
not connect to the side paths please make sure that connections are made. Show
ada ramps. In looking arieal stopped sidewalks a little short and we want to
make sure that when you finish your sidewalks make full connection
Matt Griffin, DOCS no additional comments at this time.
March 20 public hearing
END
S:/ TechnicalAdvisorCommittee /TACMinutes /2007 /Feb21 7