HomeMy WebLinkAbout036-01 Information Document - Area %0_
0
0
00
RfP -RAP
LOWE'S BUILDING PAD
135.197 SO. FT.
z •ilim
Ni
IIKIJI,
ph, NIIII. NI
1111111111■ Nil
111. 1
N►■ NI
'MOW NI
r
I NIMIL, NI
NEW Nii
N
\i
1 Nil
111.
Ng. \i
imilik. III
tm
\I
NNW NI
WI. NI
N11. 11
MM.. Nil
_1
11► 11
\t NI
NEIL NMI
-\k
listah, I
`Malik NI
Eh.
NEIL. IL
11\ �I
MIL NIII I 1
NIE
WM. NI
NEW NI
NEIL 1 Si
.i
NL
0.
i
RP-RAP
146th STREET
ASPHALT
FUTURE RE TAIL
TRAFF. CONTROLLER
ASPHALT
TRAFF. SIGNAL POST
ATTACHED CAMERA (TYP.)
TRAFF. HANOHOLE
General Site Work Notes and Specifications
1. The Contractor shall be responsible for obtaining or
verifying that all permits and approvals have been filed for
and ire valid and in —force from the respective city, county,
state, and federal agencies prior to starting construction.
2. It shall be the Contractors responsibility to determine
the exact location of all existing utilities in the general
project area prior to beginning construction.
3. It shall be the Contractors responsibility to notify and
coordinate all construction with respective utility companies.
4. I t shall be the responsibility of the Contractor to
maintain quality control throughout the duration of
construction. Failure to do so may result in the engineer
requiring that the defective work be removed and replaced.
5. Ail work will be performed in
and specifications. Any and all
specifications shall be approved
or scid changes will be subject
at no cost to the developer.
6. The contractor shall be responsible for verification of
all pan quantities and plan dimensions as shown herein.
7. Occupational Safety and Health Administration (OSHA)
Stan lards for Excavation, Final Rule 29 CFR Part 1926,
Subpart "P" applies to all excavations exceeding five (5)
feet in depth.
8. Any trench excavations exceeding twenty (20) feet in
depth shall require a trench safety system that has been
designed and /or approved in writing by a registered
professional engineer.
NORTH
accordance with these plans
changes to these plans and
by the engineer in writing
to removal and replacement
SITE NOTES
1) ASPHALT PARKING LOT TO BE STRIPED KITH
4" bWOE PAINTED WHITE LINES AS INDICATED.
CONCRETE PAVED AREAS TO BE PAINTED
YELLOW. PAINT SHALL BE SHERWWN WILLIAMS
"PROMAR TRAFFIC MARKING
2) CONTRACTOR SHALL COORDINATE AND COMPLY
WITH ALL UTILITY COMPANIES INVOL W iN
PROJECT AND PAY ALL REQUIRED FEES AND
COSTS.
4) ALL RADII SHALL BE 4' UNLESS OTHERWISE
NOTED.
Total Surface Parkin. Ara
346,909 sq. ft.
Total Parkin. L. Landsca•in
44,974 sq. ft.
12.9% of Total Surface Parking Area
PUD Requirement is 690
DESCRIPTION
z
V/
w O U
Y U z
SHEET
0
I; a
l
(4)
W
0
Q
Li. CD
J
Cn
U
W
w
z 0
Q
v
c
a)
E
O
0
z
(I)
CSI PROJ. #00-113