HomeMy WebLinkAbout036-01 C-500 Sanitary Sewer Plan & ProfileUTILITY PLAN NOTES
1.) SEE ARCHITECTURAL PLUMBING PLANS FOR PLUMBING DETAILS TO
AREAS FIVE (5) FEET OUTSIDE AND INSIDE OF THE PROPOSED
STRUCTURE
2.) LOCATION OF SITE UTILITIES SHALL BE VERIFIED WITH PROPER
UTILITY COMPANY PROVIDING SERVICE.
3.) UTILITY CONTRACTOR SHALL PROVIDE 3' X 3' X 8" THICK CONCRETE
APRON AT ALL CLEANOUTS OUTSIDE OF BUILDING.
4.) UTILITY CONTRACTOR WILL BE RESPONSIBLE FOR ALL TAP AND TIE
ON FEES REQUIRED, AS WELL AS COST OF UNDERGROUND SERVICE
CONNECTIONS TO THE BUILDING.
5.) ELECTRICAL SERVICE TO PAD MOUNTED TRANSFORMER SHALL BE
ERGROUND
RUN UNDI FROM ROAD RIGHT-OF-WAY TO TRANSFORMER
LOCATION. ASSOCIATED COST BY UTILITY CONTRACTOR.
6.) UTILITY CONTRACTOR SHALL FURNISH (2) 4" TELEPHONE
CONDUIT(S) AS SHOWN ON PLAN, VERIFY LOCATION OF TIE IN AT
TELEPHONE COMPANIES SERVICE LINE. PROVIDE NYLON PULL CORD
INSIDE CONDUIT.
SEWER PIPE
1.) ALL S PIPE SHALL BE PVC PIPE MIN. SDR 35.
2.) FOR f 15-INCHES DIAMETER AND SMALLER: PIPE, FITTINGS, AND
JOINTING SYSTEMS SHALL CONFORM TO ASTM 0-3034 EXCEPT THAT
THE STANDARD DIMENSION RATIO OF THE OUTSIDE DIAMETER OF
THE PIPE TO WALL THICKNESS SHALL NOT EXCEED 35.
3.) FOR PIPE 18-INCHES DIAMETER AND LARGER: PIPE, FITTINGS, AND
JOINTING SYSTEMS SHALL CONFORM TO ASTM F-679 WITH A T-1 WALL
THICKNESS.
4.) JOINT SYSTEMS SHALL BE ELASTOMERIC SEAL (GASKET) TYPE. SEALS
SHALL CONFORM TO ASTM F-477 REQUIREMENTS. JOINT MATERIALS
AND TESTING SHALL CONFORM TO ASTM D-3212 REQUIREMENTS.
5.) ALL SERVICE CONNECTIONS SHALL BE MADE USING A WYE AND BEND.
TEES SHALL BE USED ONLY AS DIRECTED BY THE CITY. TEES AND
WYES SHALL BE DIE CAST OR FACTORY FABRICATED. ALL SERVICE
PIPE SHALL BE SDR 35.
TYPE 1 CLEANOUT
WI- EL-8125_
1 00+00 101+00
6.) CONNECTIONS TO EXISTING PIPING SHALL BE MADE USING FLEXIBLE
REPAIR COUPLINGS BY FERNCO OR EQUIVALENT.
ALL WATER MAIN AND SEWER PIPING SHALL BE TESTED IN ACCORDANCE
WITH INDIANA CODE AND IDEM REGULATIONS.
AIR PRESSURE ACEPTANCE TEST
1.) CONTRACTOR SHALL PERFORM AN AIR PRESSURE TEST ON ALL
GRAVITY SEWER PIPE IN ACCORDANCE WITH ASTM F-1417
SPECIFICATIONS.
EQU
2.) THE CONTRACTOR SHALL FURNISH ALL IPMENT, MATERIALS,
LABOR, AND CONDUCT TI TEST UNDER OBSERVATION OF CITY
PER
METH
3.) TEST OD:
A. LOW AIR TEST METHOD SHALL BE THE TIME
US
PRE DROP METHOD. THE PRESSURE ED IN THE
TES SHALL BE THE STATED PRESSURE GREATER THAN
THE AVERAGE BACK PRE OF ANY GROUND WATER
ABOVE THE PIPE
B.) THE TIME REQUIRED FOR THE PRESSURE IN THE TEST
SEC TO DROP 1.0 PSIG SHALL BE MEASURED USING A
STOPWATCH. IF THE TIME EXCEEDS THE TIME
DETERMINED FROM ASTM F-1417 THE SECTION FAILS.
FOR MAIN AND WATER MAIN PRESSURE AND LEAKAGE TESTS
1.) CONTRACTOR SHALL FURNISH ALL EQUIPMENT, LABOR, AND
MATERIALS NECESSARY FOR THE HYDROSTATIC PRESSURE AND
LEAKAGE TEST ON ALL MAINS UNDER THE SUPERVISION OF THE CITY
PERSONNEL.
2.) TESTS PRESSURE SHALL BE 100 PSI OR 150% OF NORMAL PIPE
OPERATING PRESSURE, WHICH EVER IS GREATER.
3.) LEAKAGE TEST PRESSURE SHALL NOT BE LESS THAN THE MAXIMUM
OPERATING PRESSURE OF THE PIPE. THE DURATION OF THE LEAKAGE
TEST SHALL NOT BE LESS THAN TWO HOURS. ALLOWABLE LEAKAGE
SHALL NOT EXCEED 9 GAL/IN OF PIPE DIAMETER PER MILE OF PIPE IN
24HR.
154 L.F. of 6" LATERAL
1,0Z: (MIN.)
102+00 103+00
DEFLECTION TEST OF PVC SEWER PIPE
1.) VERTICAL RING DEFLECTION BEFORE FINAL ACCEPTANCE OF
SEWER LINES, ALL SECTIONS OF SEWER PIPE 8-INCHES AND LARGER
SPECIFIED DIAMETER SHALL BE MEASURED FOR VERTICAL RING
DEFLECTION BY THE CONTRACTOR AND WITNESSED BY THE CITY.
MAXIMUM DEFLECTION UNDER FULL LOAD SHALL NOT EXCEED 5% OF
THE ASTM DESIGNATED AVERAGE INSIDE DIAMETER AS DETERMINED
BY THE LABORATORY FOR THE SPECIFIED PIPING.
2.) FAILURES SHOULD A PIPE EXCEED THE ALLOWABLE DEFLECTION,
THE CONTRACTOR SHALL REPLACE THOSE PIPES AND RETEST THE
SECTION.
3.) EQUIPMENT TESTING SHALL BE GO-NO-GO PULL THROUGH GAUGES
OF A TYPE APPROVED BY THE CITY. A METAL OR PLASTIC GAUGING
RING OF DIAMETER EQUAL TO 95% OF THE SPECIFIED AVERAGE
INSIDE PIPE DIAMETER SHALL BE WITH EACH GAUGE.
4.) THE CONTRACTOR SHALL FURNISH TESTING EQUIPMENT AND
PERSONNEL AND PERFORM THE REQUIRED TESTS. TESTS MUST BE
WITNESSED BY CITY PERSONNEL.
5.) USE OF MECHANICAL PULLING DEVICES IS NOT PERMITTED.
6.) DEFLECTION TESTING SHALL NOT BE PERFORMED UNTIL THE
COMPLETED AND ACCEPTED TRENCH BACKFILL HAS BEEN IN PLACE
FOR AT LEAST 30 DAYS
104+00 105+00
RETENTION
POND 1
DETENTION
POND 2
106+00
mulEMor1=1
5119r$K1
LWafficimcpeolgo;
107+00
-w-
S S-
X
TYPE 2 aEANOUT
IAIV. EL. 819.8
I I 014/444"
iffitv Eno
-it
CONCRETE SADDLE
REVD, 0 CROSSING
TYPE 2 CLEANOUT
Mil 4. eq.
Hi I I ,,1!
-FtROP.1 siA *H. 11111 iTa ELI 8'240
1,1 V, 812.08
20' SANITARY SEWER
EASEME:NT
11111111111i
LEGEND
Water Line
Prop, Sanitary Sewer Line
Prop. Sanitary Sewer Manhole
Fire Hydrant
Curb Box Valve
D3 cx
108+00 109+00
0 El Z 0 El El El E1 Z
c o
c e
NOTE: FOR MORE DETAILED INFORMATION
ABOUT WATER LINE SEE SHEET C-202
110+00
1 2 CLEANOUT
INV. EL. 820.5
1 11+00
LOV STORE
13 SO. FT.
(F.F, EL, 824.5)
LIMITS OF SITE
CONTRACT
INV, EL. 820.5
70 L.F. 6" LA7ERAL
#6-PROP. SAN. IVA.
T C. EL. 824.05
INV, EL, 819.1 (EAST)
INV. EL. 819.2 (SOUTH)
BELJEIMI
[7
#5-PR6P, SAN, MA
7: C. EL. 822,50
Il 1 I
Inv. EL. 813 (W.
112+00 113+00
CS)
Scale: 1"= 50'
(Horz.)
5 ICJ
Scale: 1"=
(Vert.)
DESCRIPTION
REVISIONS
PRE-BID SET
ISSUE DATE
A POST Bi 0 SET
ISSUE DATE
SHEET
1-
z
(r)
Cf) Z'
w 0
y 0 Z
C-500
cs_r p
Ill
111
=II
illal
MIMI
MIMI
MIll
MIIIII■
1111111a111111111111111111111
1=1
IMPIIIIMNG004111111
111111111111111111
117
MN
MM
MOM
IIIUIMMN
NM
111
MIMI
SU
las
NM
NIP
WAII
IMP
STEIMII
11111111
NI11
=111
MI
Mal
U
NE!
MO
OM
MIMI
MO
MI=
MIMI
i .11
MI
MI
1111111111111
4;
i
0
800
8 5
805
11
111
11
11111EMI
illi1Mitm
WIIIIIIMIIIIIMIII
1
f.`
11
1/1111
11
II
i
i
C
n
INN
ITIB
1111100E1111101101111111
MOMMIlillummin
=iimm
=I
=I
M11111
NM
Mill
Mall=
maw ff
IMMO_
i
musimium
.11111
al.
MI
all
ME
MI
Mill
ME
1
XISTING
G
DE
fm,,
I
111
l
wili
11
sin
•Nroll
INE111.
mu
l
1111111111111111111111111111111111111110
11
10011WIIINIffill
11111111111111111111011111
M
INIIIMIIIIIIIIIIMIIIIII
1111
MN
NE
I=
EN
11111111
momilmo
NEM
MIME
amo
ME
MIME
111MM
liMrI
m 211111111
alli
NM
ME
•s)
MI
EN
1111
NMI
1
r
mein
Mg
moo
MI
r
ME
.1111
1
----7---------
7
1
ANIFIMMOIN
INV.
1
WM
k\---
liffilimmill
1
I
I
1
MilailliMINI
I
pm
K,
<7_
L
R BACFILL
Mc
IIIIIII: NM
ke,
1
0
L. 809
1
1
mweitarsimi
MN
AMISMI
I --1
r
MI
7
al
.6
ll
111111111111111
BOO
11
Emr.
=I
11■ 11
maga
i iii
EL 8,
NS/DE
DROP
111
r
iii
.2.
1111
I
miimimmi
REM
Milminfrai
al
mom
ME
0.1.111111
MIMI
P 0.1
I0 .1
NM
MIIIIMitdlfifaFillIll
MN
111111•111111111111
ammerims
SAN.1.1.10.14:
0 O.
ill
W
am•IIMII
0
N
SAN.
I I
SEW
.1
SA
SA
SEWER
'i) 0.44X
R 1,0Z
R 0 0,
---0).
III
111111
NM
Qs
MN
111111l
e■
g'..
a
L°.
10
•11111111111111111111111111111611111
EN
07,
UTILITY PLAN NOTES
1.) SEE ARCHITECTURAL PLUMBING PLANS FOR PLUMBING DETAILS TO
AREAS FIVE (5) FEET OUTSIDE AND INSIDE OF THE PROPOSED
STRUCTURE
2.) LOCATION OF SITE UTILITIES SHALL BE VERIFIED WITH PROPER
UTILITY COMPANY PROVIDING SERVICE.
3.) UTILITY CONTRACTOR SHALL PROVIDE 3' X 3' X 8" THICK CONCRETE
APRON AT ALL CLEANOUTS OUTSIDE OF BUILDING.
4.) UTILITY CONTRACTOR WILL BE RESPONSIBLE FOR ALL TAP AND TIE
ON FEES REQUIRED, AS WELL AS COST OF UNDERGROUND SERVICE
CONNECTIONS TO THE BUILDING.
5.) ELECTRICAL SERVICE TO PAD MOUNTED TRANSFORMER SHALL BE
ERGROUND
RUN UNDI FROM ROAD RIGHT-OF-WAY TO TRANSFORMER
LOCATION. ASSOCIATED COST BY UTILITY CONTRACTOR.
6.) UTILITY CONTRACTOR SHALL FURNISH (2) 4" TELEPHONE
CONDUIT(S) AS SHOWN ON PLAN, VERIFY LOCATION OF TIE IN AT
TELEPHONE COMPANIES SERVICE LINE. PROVIDE NYLON PULL CORD
INSIDE CONDUIT.
SEWER PIPE
1.) ALL S PIPE SHALL BE PVC PIPE MIN. SDR 35.
2.) FOR f 15-INCHES DIAMETER AND SMALLER: PIPE, FITTINGS, AND
JOINTING SYSTEMS SHALL CONFORM TO ASTM 0-3034 EXCEPT THAT
THE STANDARD DIMENSION RATIO OF THE OUTSIDE DIAMETER OF
THE PIPE TO WALL THICKNESS SHALL NOT EXCEED 35.
3.) FOR PIPE 18-INCHES DIAMETER AND LARGER: PIPE, FITTINGS, AND
JOINTING SYSTEMS SHALL CONFORM TO ASTM F-679 WITH A T-1 WALL
THICKNESS.
4.) JOINT SYSTEMS SHALL BE ELASTOMERIC SEAL (GASKET) TYPE. SEALS
SHALL CONFORM TO ASTM F-477 REQUIREMENTS. JOINT MATERIALS
AND TESTING SHALL CONFORM TO ASTM D-3212 REQUIREMENTS.
5.) ALL SERVICE CONNECTIONS SHALL BE MADE USING A WYE AND BEND.
TEES SHALL BE USED ONLY AS DIRECTED BY THE CITY. TEES AND
WYES SHALL BE DIE CAST OR FACTORY FABRICATED. ALL SERVICE
PIPE SHALL BE SDR 35.
TYPE 1 CLEANOUT
WI- EL-8125_
1 00+00 101+00
6.) CONNECTIONS TO EXISTING PIPING SHALL BE MADE USING FLEXIBLE
REPAIR COUPLINGS BY FERNCO OR EQUIVALENT.
ALL WATER MAIN AND SEWER PIPING SHALL BE TESTED IN ACCORDANCE
WITH INDIANA CODE AND IDEM REGULATIONS.
AIR PRESSURE ACEPTANCE TEST
1.) CONTRACTOR SHALL PERFORM AN AIR PRESSURE TEST ON ALL
GRAVITY SEWER PIPE IN ACCORDANCE WITH ASTM F-1417
SPECIFICATIONS.
EQU
2.) THE CONTRACTOR SHALL FURNISH ALL IPMENT, MATERIALS,
LABOR, AND CONDUCT TI TEST UNDER OBSERVATION OF CITY
PER
METH
3.) TEST OD:
A. LOW AIR TEST METHOD SHALL BE THE TIME
US
PRE DROP METHOD. THE PRESSURE ED IN THE
TES SHALL BE THE STATED PRESSURE GREATER THAN
THE AVERAGE BACK PRE OF ANY GROUND WATER
ABOVE THE PIPE
B.) THE TIME REQUIRED FOR THE PRESSURE IN THE TEST
SEC TO DROP 1.0 PSIG SHALL BE MEASURED USING A
STOPWATCH. IF THE TIME EXCEEDS THE TIME
DETERMINED FROM ASTM F-1417 THE SECTION FAILS.
FOR MAIN AND WATER MAIN PRESSURE AND LEAKAGE TESTS
1.) CONTRACTOR SHALL FURNISH ALL EQUIPMENT, LABOR, AND
MATERIALS NECESSARY FOR THE HYDROSTATIC PRESSURE AND
LEAKAGE TEST ON ALL MAINS UNDER THE SUPERVISION OF THE CITY
PERSONNEL.
2.) TESTS PRESSURE SHALL BE 100 PSI OR 150% OF NORMAL PIPE
OPERATING PRESSURE, WHICH EVER IS GREATER.
3.) LEAKAGE TEST PRESSURE SHALL NOT BE LESS THAN THE MAXIMUM
OPERATING PRESSURE OF THE PIPE. THE DURATION OF THE LEAKAGE
TEST SHALL NOT BE LESS THAN TWO HOURS. ALLOWABLE LEAKAGE
SHALL NOT EXCEED 9 GAL/IN OF PIPE DIAMETER PER MILE OF PIPE IN
24HR.
154 L.F. of 6" LATERAL
1,0Z: (MIN.)
102+00 103+00
DEFLECTION TEST OF PVC SEWER PIPE
1.) VERTICAL RING DEFLECTION BEFORE FINAL ACCEPTANCE OF
SEWER LINES, ALL SECTIONS OF SEWER PIPE 8-INCHES AND LARGER
SPECIFIED DIAMETER SHALL BE MEASURED FOR VERTICAL RING
DEFLECTION BY THE CONTRACTOR AND WITNESSED BY THE CITY.
MAXIMUM DEFLECTION UNDER FULL LOAD SHALL NOT EXCEED 5% OF
THE ASTM DESIGNATED AVERAGE INSIDE DIAMETER AS DETERMINED
BY THE LABORATORY FOR THE SPECIFIED PIPING.
2.) FAILURES SHOULD A PIPE EXCEED THE ALLOWABLE DEFLECTION,
THE CONTRACTOR SHALL REPLACE THOSE PIPES AND RETEST THE
SECTION.
3.) EQUIPMENT TESTING SHALL BE GO-NO-GO PULL THROUGH GAUGES
OF A TYPE APPROVED BY THE CITY. A METAL OR PLASTIC GAUGING
RING OF DIAMETER EQUAL TO 95% OF THE SPECIFIED AVERAGE
INSIDE PIPE DIAMETER SHALL BE WITH EACH GAUGE.
4.) THE CONTRACTOR SHALL FURNISH TESTING EQUIPMENT AND
PERSONNEL AND PERFORM THE REQUIRED TESTS. TESTS MUST BE
WITNESSED BY CITY PERSONNEL.
5.) USE OF MECHANICAL PULLING DEVICES IS NOT PERMITTED.
6.) DEFLECTION TESTING SHALL NOT BE PERFORMED UNTIL THE
COMPLETED AND ACCEPTED TRENCH BACKFILL HAS BEEN IN PLACE
FOR AT LEAST 30 DAYS
104+00 105+00
RETENTION
POND 1
DETENTION
POND 2
106+00
mulEMor1=1
5119r$K1
LWafficimcpeolgo;
107+00
-w-
S S-
X
TYPE 2 aEANOUT
IAIV. EL. 819.8
I I 014/444"
iffitv Eno
-it
CONCRETE SADDLE
REVD, 0 CROSSING
TYPE 2 CLEANOUT
Mil 4. eq.
Hi I I ,,1!
-FtROP.1 siA *H. 11111 iTa ELI 8'240
1,1 V, 812.08
20' SANITARY SEWER
EASEME:NT
11111111111i
LEGEND
Water Line
Prop, Sanitary Sewer Line
Prop. Sanitary Sewer Manhole
Fire Hydrant
Curb Box Valve
D3 cx
108+00 109+00
0 El Z 0 El El El E1 Z
c o
c e
NOTE: FOR MORE DETAILED INFORMATION
ABOUT WATER LINE SEE SHEET C-202
110+00
1 2 CLEANOUT
INV. EL. 820.5
1 11+00
LOV STORE
13 SO. FT.
(F.F, EL, 824.5)
LIMITS OF SITE
CONTRACT
INV, EL. 820.5
70 L.F. 6" LA7ERAL
#6-PROP. SAN. IVA.
T C. EL. 824.05
INV, EL, 819.1 (EAST)
INV. EL. 819.2 (SOUTH)
BELJEIMI
[7
#5-PR6P, SAN, MA
7: C. EL. 822,50
Il 1 I
Inv. EL. 813 (W.
112+00 113+00
CS)
Scale: 1"= 50'
(Horz.)
5 ICJ
Scale: 1"=
(Vert.)
DESCRIPTION
REVISIONS
PRE-BID SET
ISSUE DATE
A POST Bi 0 SET
ISSUE DATE
SHEET
1-
z
(r)
Cf) Z'
w 0
y 0 Z
C-500
cs_r p