Loading...
HomeMy WebLinkAbout036-01 C-605 Site DetailsEROSION NETTING 170 000 SO. FT SEEDING /s- -4!;47/A C. SILT FENCE WOO L. F INLET PRO TEC TION 5 E4. TEMPORARY SEDIMEN T TRAP El. TEMPORARY SEDIMENT BASIN 1 1 EA. TEMPORARY Dl VERSION DI TCH 0 L.F. 3" LAYER OF SHREDDED HARDWOOD BARK MULCH CAP PLANTING PIT W /ON SITE CLAY TOPSOIL PRIOR TO MULCHING (2-3") EARTH SAUCER FIN. GRADE I E 1_ 1 I 1!I Ili li! I j 1 1-1 il i lll l EXISTING SOIL OR COMPACTED BACKFILL 6" MAX. SHRUB PLANTING DETAIL NTS STAPLE PATTERN "D" 3 staples per sq. yd. using 6 -inch, 11 gauge wire "U" staples. 8 -inch and longer staples may be used for loose soils. 9 gauge staples may be necessary in hard or rocky soils. Erosion netting shall be required for the Iwlale bottom. Use North American Green Blanket No 5-150 or equivalent STABILIZATION JAN. FEB. MAR. APR. MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC. PRACTICE PERMANENT A- *////1//// Ai, SEEDING MINIM DORMANT SEEDING TEMPORARY SEEDING SODDING MULCHING B ---ti G F /I A KENTUCKY BLUEGRASS 40 LBS /ACRE; CREEPING RED FESCUE 40 LBS /ACRE; PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 20 LBS /ACRE. B KENTUCKY BLUEGRASS 60 LBS /ACRE; CREEPING RED FESCUE 60 LBS /ACRE; PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 30 LBS /ACRE. C SPRING OATS 3 BUSHEL /ACRE, D WHEAT OR RYE 2 BUSHEL /ACRE. E ANNUAL RYEGRASS 40 LBS /ACRE. F SOD G STRAW MULCH 2 TONS /ACRE. /I IRRIGATION NEEDED DURING JUNE, JULY, AND /OR SEPTEMBER IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD SEASONAL SOIL PRO TEC TION CHAR T *NOTE RIGHT -OF -WAY SHALL BE SEEDED OR SODDED, AND SHALL ONLY BE MIXTURE "A OR "B'; DEPENDING ON 77ME OF YEAR FINAL SEEDING RECOMMENDATION SEED BLEND: 60% TURF TYPE TALL FESCUE (2 -3 VARIETIES) 25% PERENNIAL RYE 10% BLUEGRASS 5% ANNUAL RYE APPLY FERTILIZER AT A RATE ADEQUATE TO PROVIDE 1 LB. OF ACTUAL NITROGEN PER 1,000 S.F. OF COMPOSITION 5- .-10 -5. ADD LIME TO TOPSOIL TO OBTAIN A pH RANGE OF 6.0 TO 7.0. MULCH SHALL BE APPLIED TO SLOPED AREAS AT THE RATE OF 2 TONS PER ACRE, �F- 20* N X X X X 6.5' EROSION NETTING/SLOPE STABIUZA'RON EROSION NETTING (NO SCALE) PLACE SOIL BALL SLIGHTLY HIGHER THAN FIN. GRADE. MOUND SOIL OVER BALL, RHODODENDRONS OTHER ERICACEOUS PLANTS, PLACE AND MOUND PEATMOSS OVER BALL MULCH HEAVILY. INSTALL FERTILIZER TABLETS OR SPI <ES 1 -1 I I -I j li I ^Iif I I i 1 H. L 1 I i_ mP BLOC< 11 -1 FILTER FABRIC SOIL BACKFILL TO BE 75% TOPSOIL 25% PEATMOSS TAMPED TO PREVENT SETTLEMENT. I. DOUBLE STRAND 12 GA. WIRE TWISHED IN RUBBER HOSE 6 FROM TOP STAKES SUITABLE CORD BANDING BURLAP OR HEAVY CREPE TREE WRAP MATERIAL PLACE SOIL BALL SLIGHTLY HIGHER THAN EXISTING GRADE, MOUND SOIL OVER BALL FINAL GRADE WEED BLOCK ..I i 1 =111= 11 FILTER FABRIC 11 ii i �!1 SOIL BACKFILL TO BE 75% TOPSOIL 25% PEAT (TAMPED) REMOVE BINDING TREE PLANTING DETAIL NTS 1" ABOVE 1" LAYER OF SHREDDED FIN. GRADE GRADE HARDWOOD MULCH GROUND COVER PLANING SOtiL TO BE 1 PART MANURE, 5 PARTS TOPSOIL AND 4 PARTS PEATMOSS, DEPTH 4". A FULL LAYER (MIN. COMPLETED DEPTH) OF SHREDDED FIBROUS PEATMOSS MAY BE USED II\ LIEU OF PLANTING MIX. INCLUDE FERTILIZER AT APPROVED RATES. GROUND COVER OR FLOWER BED DETAIL NTS See plan for width F i i I I1 OF H I_ t i -1 1 1 -1 -I 1 -1 F I I COMPACTED GRANULAR SUBGRADE #2 STONE GRA DEL CONSTRUCTION ENTRANCE CAP PLANTING PIT W/ 2 -3" OF CLAY TOPSOIL PRIOR TO MULCHING 3" LAYER OF SHEDDED HARDWOOD MULCH INSTALL FERTILIZER TABLETS OR SPIKES EARTH SAUCER -1 -1 1- I II i 1 ;I F F iii I I 1 NOTE: STAKE GUY FI TREES AS SHOWN IF MAX. SITE CONDITIONS DICTATE EXISTING SUBSOIL OR COMPACTED BACKFILL 11 1 I I I I I F I I I I I 1 I I 1! 1 I= 111 I =!fi -11=11 iii` 111_1i1 -11i j1 -rh I I= I I I I I I EROS /ON CONTROL SUMMARY EROSION GON7ROL MAINTT'NANCZ EROS /ON CONTROL NOTES 1. NO LAND CLEARING OR GRADING SHALL BEGIN UNTIL EROSION CONTROL MEASURES HAVE BEEN INSTALLED, IN ACCORDANCE WITH THE PHASING SEQUENCE SHOWN IN THESE PLANS. 2. ALL EXPOSED AREAS SHALL BE SEEDED AS SPECIFIED WI THIN 30 DA YS OF FINAL GRADING, 3. SHOULD CONSTRUCTION STOP FOR LONGER THAN 15 DAYS, THE SITE SHALL BE SEEDED AS SPECIFIED. 4. MAINTAIN EROSION CONTROL MEASURES AFTER EACH RAIN AND AT LEAST ONCE A WEEK. 5. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SOIL SEDIMENT FROM LEAVING THE SITE. 6. CONTRACTOR SHALL COMPLY W/TH ALL STATE AND LOCAL ORDINANCES THAT APPLY. 7. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED IF DEEMED NECESSARY BY ON SITE INSPECTION. 8. LAND DISTURBING ACTIV /TIES SHALL NOT COMMENCE UNTIL APPROVAL TO DO SO HAS BEEN RECEIVED BY GOVERNING AUTHORITIES 9. IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED BY WEATHER OR NIGHTFALL, THE. PIPE ENDS SHALL BE COVERED WITH FILTER FABRIC. 10. ALL EXISTING STRUCTURES, FENCING, TREES, AND ETC, WITHIN CONSTRUCTION AREA SHALL BE REMOVED AND DISPOSED OF OFF SITE. ANY BURNING ON SITE SHALL BE SUBJECT TO LOCAL ORDINANCES AND LOWES SPECIFICATIONS 11. CONTRACTOR SHALL BE RESPONSIBLE TO TAKE WHATEVER MEANS NECESSARY TO ESTABLISH PERMANENT SOIL STABILIZATION. 12. SEDIMENT SHALL BE REMOVED FROM THE SEDIMENT BASIN BEFORE /T IS 50Z FULL. 13. SEDIMENT BASIN OUTLET STRUCTURE CMP SIZED TO INCLUDE EMERGENCY SPILLWAY FOR 10 YR. STORM EROSION CONTROL BLANKET 4 4UR1NG VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY EROSION BELOW THE BLANKET. 2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET. 3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY. PERMANENT SEEDING 1. INSPECT PERIODICALLY, ESPECIALLY AFTER STORM EVENTS, UNTIL THE STAND IS SUCCESSFULLY ESTABLISHED, 2. PLAN TO ADD FERTILIZER THE FOLLOWING GROWING SEASON ACCORDING TO SOIL TEST RECOMMENDATIONS. 3. REPAIR DAMAGED, BARE, OR SPARSE AREAS BY FILLING ANY GULLIES, RE- FERTILIZING, OVER- OR RE- SEEDING, AND MULCHING. SILT FENCE 1, INSPECT THE SILT FENCE/EROSION BERM PERIODICALLY AND AFTER EACH STORM EVENT. 2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. 4. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE. EROSION BERM /SEDIMENT TRAPS BASINS 1. INSPECT THE EROSION BERM AND SEDIMENT TRAPS PERIODICALLY AND AFTER EACH STORM EVENT. 2. RE -GRADE AND RE- ESTABLISH AS REQUIRED, 3. REMOVE DEPOSITED SEDIMENT BUILD UP ROUTINELY TO INSURE PROPER WORKING ORDER. 4, AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE BERM„ TRAPS AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE. 1. IN CASE OF DISCREPANCIES BETWEEN THE PLAN AND THE PLANT LIST, THE PLAN SHALL DICTATE 2. ALL SHRUB PLANTING AREAS TO BE COVERED W/ 3" LAYER OF SHREDDED HARDWOOD BARK MULCH. ALL GROUND COVER BEDS SHALL BE COVERED W/ 2" SHREDDED HARDWOOD BARK MULCH. MULCH SHALL BE APPROVED BY LANDSCAPE ARCHITECT AND SHALL BE UNIFORM IN TEXTURE AND COLOR AND SHALL BE OBTAINED FROM SAWMILL OR LUMBERING OPERATION. NO UTILITY MULCH OR PROCESSED TREE TRIMMINGS WILL BE ALLOWED. 3. AN APPROVED PRE EMERGENT HERBICIDE SHALL BE APPLIED IN ALL PLANTING BEDS AT A RATE SPECIFIED BY MANUFACTURER FOR EACH PLANT VARIETY. 4. FINAL PLACEMENT OF PLANT MATERIALS, ECT. SHALL BE APPROVED BY LANDSCAPE ARCHITECT BEFORE PLANTING OPERATIONS ARE TO PROCEED. ALL TREE LOCATIONS SHALL BE MARKED WITH A WOOD STAKE INDICATING VARIETY AND SIZE OF TREE. ALL GROUND COVER AND PLANTING BED LINES SHALL BE MARKED W/ HIGHLY VISIBLE PAINT LINES W/ OCCASIONAL WOOD STAKES FOR REFER- ENCE. ALL STAKES SHALL BE REMOVED FOLLOWING PLANTING OPERATIONS. LANDSCAPE ARCHITECT RESERVES THE RIGHT TO ADJUST PLANT LOCATIONS ON THE SITE. 5. NO SUBSTITUTIONS OF PLANT MATERIALS WILL BE ALLOWED. IF PLANTS ARE NOT AVAILABLE, THE CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT PRIOR TO BID IN WRITING. ALL PLANTS SHALL BE INSPECTED AND TAGGED WITH PROJECT I.D. AT NURSERY OR CONTRACTORS OPERATIONS PRIOR TO MOVING TO JOB SITE. PLANTS MAY BE INSPECTED AND APPROVED OR REJECTED ON THE .LOB SITE BY LANDSCAPE ARCHITECT. 6. ALL PLANTS SHALL MEET OR EXCEED AMERICAN STANDARDS FOR NURSERY STOCK, 1986 EDITION, AS SET FORTH BY AMERICAN ASSOCIATION OF NURSERYMEN. 7. PLANTS AND ALL OTHER MATERIALS TO BE STORED ON SITE WILL BE PLACED WHERE THEY WILL NOT CONFLICT W/ CONSTRUCTION OPERATIONS AND AS DIRECTED BY LANDSCAPE ARCHITECT. 8. ALL LANDSCAPE PLANTINGS SHALL BE GUAR- ANTEED FOR A PERIOD OF ONE YEAR FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT. AT THE END OF THIS PERIOD, PLANT MATERIAL TERMED DEAD OR UNSATISFACTORY BY LANDSCAPE ARCHITECT SHALL BE REPLACED AT NO ADDITIONAL. CHARGE BY THE LANDSCAPE CONTRACTOR. 9. LAWNS SHALL BE SEEDED FOLLOWING SCARIFYING, FINAL GRADING, FERTILIZING, AND RAKING. LAWN SHALL BE FERTILIZED W/ 12 -12 -12 ANALYSIS FERT. AT A RATE OF 10Ibs. /1000s.f.AND LIME APPLIED AS DICTATED BY SOILS TEST PRIOR TO SEEDING. LAWNS TO BE SEEDED W/ MECHANICAL SPREADER AT A RATE OF 5lbs. /1000s.f. APPLY SEED 1/2 ONE DIRECTION AND 1/2 PERPENDICULAR TO THE FIRST. LIGHTLY RAKE, ROLL W/ 200Ibs. ROLLER,AND APPLY HYDROMULCH (NO STRAW MULCH) AFTER SEEDING. PLANTING NOTES 10. THE LANDSCAPE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND FEES THAT MAY BE REQUIRED FOR HIS PORTION OF WORK. 11. PEATMOSS TO BE USED ON PROJECT SHALL BE DOMESTIC OR IMPORTED MATERIAL, CHOCOLATE BROWN IN COLOR AND COMPOSED OF PARTIALLY DECOMPOSED VEGETABLE MATERIAL. PEAT MOSS TO BE MILDLY ACIDIC IN CHARACTER AND SHALL BE APPROVED BY LANDSCAPE ARCHITECT. 12. LANDSCAPE CONTRACTOR SHALL NOTIFY LASNDSCAPE ARCHITECT IN WRITING PRIOR TO BID DATE OF ANY PLANTS HE /SHE FEELS MAY NOT SURVIVE IN LOCATIONS NOTED ON PLANS. 13. ALL DISTURBED LAWN AREAS SHALL BE SEEDED OR SODDED AS NOTED. PERMANENT SEEDED LAWNS AND SODDED LAWNS SHALL BE SEED MIX AS APPROVED BY LANDSCAPE ARCHITECT. SEED MIX SHALL CONSIST OF 34 POUNDS WABASH OR BARON KENTUCKY BLUEGRASS, 20 POUNDS PARK KENTUCKY BLUEGRASS, 10 POUNDS PENNLAWN FESCUE AND 26 POUNDS CERTIFIED FINE BLADED PERENNIAL RYEGRASS. 14. ALL LAWNS SHALL BE GUARANTEED TO HAVE A FULL UNIFORM STAND OF ACCEPTABLE GRASS AT THE END OF THE ONE YEAR GUARANTEE PERIOD WITH NO BARE SPOTS COMPRISING MORETHAN 2% OF ANY LAWN AREA. ANY AREA SO NOTED WILL BE SEEDED OR SODDED UNTIL AN ACCEPTABLE STAND OF GRASS IS ESTABLISHED. 15. ALL LANDSCAPE PLANTINGS TO BE MAINTAINED BY CONTRACTOR FOR 60 DAYS FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT. ALL SEEDED LAWNS SHALL BE MAIN- TAINED FOR 60 DAYS AND SODDED LAWNS 30 DAYS FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT AFTER WRITTEN REQUEST FROM THE LANDSCAPE CONTRACTOR. MAINTENANCE TO INCLUDE WATERING WEEDING, CULTIVATING, MULCHING, MOWING, AND ALL OTHER NECESSARY OPERATIONS REQUIRED FOR PROPER ESTABLISHMENT OF LAWNS AND PLANTINGS. 15. CONTRACTOR TO SUBMIT UNIT PRICES ON EVERY TYPE OF WORK AS REQUIRED BY LANDSCAPE ARCHITECT. 16. ALL LAWN AREAS WITHIN LAWN LIMIT LINES TO RECEIVE 4 -6" APPROVED TOPSOIL PRIOR TO SEEDING OPERATIONS. 17. BACKFILL FOR TREE PLANTING SHALL BE 75% APPROVED TOPSOIL AND 25% APPROVED PEAT MOSS. TOP LAYER OF BACKFILL SHALL BE 100% EXISTING TOPSOIL.. A 5 -10-5 ANALYSIS SLOW RELEASE FERTILIZER SHALL BE INCORPORATED INTO BACK- FILL AT APPROVED RATES. 18. ALL EXISTING TREES TO BE RELOCATED SHALL BE DIRECT TRANSPLANTED BY A MECHANICAL TREE SPADE IN A PROPER SIZE AS DETERMINED BY AMERICAN ASSOC. OF NURSERYMEN STANDARDS FOR PLANT MATERIAL. ALL TRANSPLANTING OF TREES SHALL BE DONE DURING THE PROER SEASON FOR EACH SPECIES. TREES SHALL BE RELOCATED DIRECTLY TO NEW LOCATIONS OR TO HOLDING AREA FOR LATER TRANSPLANT FOLLOWING CONSTRUCTION. FINAL LOCATION AND SIZE ARE NOTED ON PLANS. ROSTN PREVENrlON 1. INSTALL TEMPORARY RISER ON EXISTING 24" RCP OUTFLOW PIPE AT THE SOUTHEAST CORNER OF EXISTING POND 2, CONSTRUCT TEMPORARY DIVERSION DITCH AT SOUTH END OF SITE, 3. INSTALL SILT FENCE, EROSION BERMS AND TEMPORARY SEDIMENT TRAPS PRIOR TO ANY EARTHMOVING ACTIVITY, 4. CLEAR AND GRUB SITE 5. STRIP AND STOCKPILE TOPSOIL (IN DESIGNATED AREA) 6, ROUGH GRADE PHASE AND PHASE AREA 7, SEED PHASE AREA 6. BEGIN EXCAVATION OF RE1EW 10N POND #3 LEAVING BERM BETWEEN EASING POND 9, REPLACE REQUIRED FILL FROM POND TO PAD AREA, BRING PHASE I TO PLAN. 10. CONSTRUCT TEMPORARY ACCESS DRIVE AND LAYDOWN AREA, 11, COMMENCE DE-- WATERING AND FIWNG WEST 1/2 OF EXISTING POND. 12, CONSTRUCT RELOCATED INDIANA WATERWAY AND WETLAND AREA FROM DOWNSTREAM END AND INSTALL CHECK DAMS, 13. CONSTRUCT PONDS AND #2, USING POND #2 AS A TEMPORARY SEDIMENT BASIN AND INSTALL TEMPORARY INLET PROTECTION AROUND STRUCTURE IN POND #2, 14. SHAPE PARKING LOT, BUILDING PAD AND CONSTRUCT DRAINAGE INFRASTRUCTURE, 15. SEED ROUGH GRADED AREAS THAT %ILL NOT BE PAVED. 16.INSTALL INLET PROTECTION WHEN EACH STRUCTURE IS INSTALLED. 17, REPLACE TOPSOIL UPON COMPLETION OF ROUGH GRADING, FINE GRADE TO PLAN ELEVATIONS, 18, FINAL SEEDING SHOULD BE INSTALLED AS SOON AS POSSIBLE AFTER FINAL GRADING, IT IS RECOMMENDED THAT NO MORE THAN SEVEN DAYS PASS BEFORE FINAL SEEDING HAS BEGUN. 19, REMOVAL OF TEMPORARY EROSION CONTROL DEVICES SHALL FOLLOW THE GUIDELINES OUTLINED IN "EROSION CONTROL MAINTENANCE" PROCEDURES HEREON. SHEET REVISIONS O PRE -BID SET ISSUE DATE 0 POST BID SET ISSUE DATE C -605 CSI PROJ. #00 --113 DATE DESCRIPTION 12/12 1 O ADD G.N. /REV. SEQ. U 7n .1 r :tea r, J 3 #t t. Y t rot 82Q6 *TKKO C CV iii A. ?hp s st4 orn r ne 7 tir D k 1 5 r S ur ve y s j Inc n 1 CD 'SITE DETAILS YI 'r w 1.1,:i ...c 4_, co NI- O m z Ct a 0 W 0 U E_ Lu ((I) Q c w W (.1) (L i' Q 1'-- D v Qw z cn o (1) 3" LAYER OF SHREDDED HARDWOOD BARK MULCH CAP PLANTING PIT W /ON SITE CLAY TOPSOIL PRIOR TO MULCHING (2-3") EARTH SAUCER FIN. GRADE I E 1_ 1 I 1!I Ili li! I j 1 1-1 il i lll l EXISTING SOIL OR COMPACTED BACKFILL 6" MAX. SHRUB PLANTING DETAIL NTS STAPLE PATTERN "D" 3 staples per sq. yd. using 6 -inch, 11 gauge wire "U" staples. 8 -inch and longer staples may be used for loose soils. 9 gauge staples may be necessary in hard or rocky soils. Erosion netting shall be required for the Iwlale bottom. Use North American Green Blanket No 5-150 or equivalent STABILIZATION JAN. FEB. MAR. APR. MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC. PRACTICE PERMANENT A- *////1//// Ai, SEEDING MINIM DORMANT SEEDING TEMPORARY SEEDING SODDING MULCHING B ---ti G F /I A KENTUCKY BLUEGRASS 40 LBS /ACRE; CREEPING RED FESCUE 40 LBS /ACRE; PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 20 LBS /ACRE. B KENTUCKY BLUEGRASS 60 LBS /ACRE; CREEPING RED FESCUE 60 LBS /ACRE; PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 30 LBS /ACRE. C SPRING OATS 3 BUSHEL /ACRE, D WHEAT OR RYE 2 BUSHEL /ACRE. E ANNUAL RYEGRASS 40 LBS /ACRE. F SOD G STRAW MULCH 2 TONS /ACRE. /I IRRIGATION NEEDED DURING JUNE, JULY, AND /OR SEPTEMBER IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD SEASONAL SOIL PRO TEC TION CHAR T *NOTE RIGHT -OF -WAY SHALL BE SEEDED OR SODDED, AND SHALL ONLY BE MIXTURE "A OR "B'; DEPENDING ON 77ME OF YEAR FINAL SEEDING RECOMMENDATION SEED BLEND: 60% TURF TYPE TALL FESCUE (2 -3 VARIETIES) 25% PERENNIAL RYE 10% BLUEGRASS 5% ANNUAL RYE APPLY FERTILIZER AT A RATE ADEQUATE TO PROVIDE 1 LB. OF ACTUAL NITROGEN PER 1,000 S.F. OF COMPOSITION 5- .-10 -5. ADD LIME TO TOPSOIL TO OBTAIN A pH RANGE OF 6.0 TO 7.0. MULCH SHALL BE APPLIED TO SLOPED AREAS AT THE RATE OF 2 TONS PER ACRE, �F- 20* N X X X X 6.5' EROSION NETTING/SLOPE STABIUZA'RON EROSION NETTING (NO SCALE) PLACE SOIL BALL SLIGHTLY HIGHER THAN FIN. GRADE. MOUND SOIL OVER BALL, RHODODENDRONS OTHER ERICACEOUS PLANTS, PLACE AND MOUND PEATMOSS OVER BALL MULCH HEAVILY. INSTALL FERTILIZER TABLETS OR SPI <ES 1 -1 I I -I j li I ^Iif I I i 1 H. L 1 I i_ mP BLOC< 11 -1 FILTER FABRIC SOIL BACKFILL TO BE 75% TOPSOIL 25% PEATMOSS TAMPED TO PREVENT SETTLEMENT. I. DOUBLE STRAND 12 GA. WIRE TWISHED IN RUBBER HOSE 6 FROM TOP STAKES SUITABLE CORD BANDING BURLAP OR HEAVY CREPE TREE WRAP MATERIAL PLACE SOIL BALL SLIGHTLY HIGHER THAN EXISTING GRADE, MOUND SOIL OVER BALL FINAL GRADE WEED BLOCK ..I i 1 =111= 11 FILTER FABRIC 11 ii i �!1 SOIL BACKFILL TO BE 75% TOPSOIL 25% PEAT (TAMPED) REMOVE BINDING TREE PLANTING DETAIL NTS 1" ABOVE 1" LAYER OF SHREDDED FIN. GRADE GRADE HARDWOOD MULCH GROUND COVER PLANING SOtiL TO BE 1 PART MANURE, 5 PARTS TOPSOIL AND 4 PARTS PEATMOSS, DEPTH 4". A FULL LAYER (MIN. COMPLETED DEPTH) OF SHREDDED FIBROUS PEATMOSS MAY BE USED II\ LIEU OF PLANTING MIX. INCLUDE FERTILIZER AT APPROVED RATES. GROUND COVER OR FLOWER BED DETAIL NTS See plan for width F i i I I1 OF H I_ t i -1 1 1 -1 -I 1 -1 F I I COMPACTED GRANULAR SUBGRADE #2 STONE GRA DEL CONSTRUCTION ENTRANCE CAP PLANTING PIT W/ 2 -3" OF CLAY TOPSOIL PRIOR TO MULCHING 3" LAYER OF SHEDDED HARDWOOD MULCH INSTALL FERTILIZER TABLETS OR SPIKES EARTH SAUCER -1 -1 1- I II i 1 ;I F F iii I I 1 NOTE: STAKE GUY FI TREES AS SHOWN IF MAX. SITE CONDITIONS DICTATE EXISTING SUBSOIL OR COMPACTED BACKFILL 11 1 I I I I I F I I I I I 1 I I 1! 1 I= 111 I =!fi -11=11 iii` 111_1i1 -11i j1 -rh I I= I I I I I I EROS /ON CONTROL SUMMARY EROSION GON7ROL MAINTT'NANCZ EROS /ON CONTROL NOTES 1. NO LAND CLEARING OR GRADING SHALL BEGIN UNTIL EROSION CONTROL MEASURES HAVE BEEN INSTALLED, IN ACCORDANCE WITH THE PHASING SEQUENCE SHOWN IN THESE PLANS. 2. ALL EXPOSED AREAS SHALL BE SEEDED AS SPECIFIED WI THIN 30 DA YS OF FINAL GRADING, 3. SHOULD CONSTRUCTION STOP FOR LONGER THAN 15 DAYS, THE SITE SHALL BE SEEDED AS SPECIFIED. 4. MAINTAIN EROSION CONTROL MEASURES AFTER EACH RAIN AND AT LEAST ONCE A WEEK. 5. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SOIL SEDIMENT FROM LEAVING THE SITE. 6. CONTRACTOR SHALL COMPLY W/TH ALL STATE AND LOCAL ORDINANCES THAT APPLY. 7. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED IF DEEMED NECESSARY BY ON SITE INSPECTION. 8. LAND DISTURBING ACTIV /TIES SHALL NOT COMMENCE UNTIL APPROVAL TO DO SO HAS BEEN RECEIVED BY GOVERNING AUTHORITIES 9. IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED BY WEATHER OR NIGHTFALL, THE. PIPE ENDS SHALL BE COVERED WITH FILTER FABRIC. 10. ALL EXISTING STRUCTURES, FENCING, TREES, AND ETC, WITHIN CONSTRUCTION AREA SHALL BE REMOVED AND DISPOSED OF OFF SITE. ANY BURNING ON SITE SHALL BE SUBJECT TO LOCAL ORDINANCES AND LOWES SPECIFICATIONS 11. CONTRACTOR SHALL BE RESPONSIBLE TO TAKE WHATEVER MEANS NECESSARY TO ESTABLISH PERMANENT SOIL STABILIZATION. 12. SEDIMENT SHALL BE REMOVED FROM THE SEDIMENT BASIN BEFORE /T IS 50Z FULL. 13. SEDIMENT BASIN OUTLET STRUCTURE CMP SIZED TO INCLUDE EMERGENCY SPILLWAY FOR 10 YR. STORM EROSION CONTROL BLANKET 4 4UR1NG VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY EROSION BELOW THE BLANKET. 2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET COVERING IT, ADD SOIL, RE -SEED THE AREA, AND RE -LAY AND STAPLE THE BLANKET. 3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY. PERMANENT SEEDING 1. INSPECT PERIODICALLY, ESPECIALLY AFTER STORM EVENTS, UNTIL THE STAND IS SUCCESSFULLY ESTABLISHED, 2. PLAN TO ADD FERTILIZER THE FOLLOWING GROWING SEASON ACCORDING TO SOIL TEST RECOMMENDATIONS. 3. REPAIR DAMAGED, BARE, OR SPARSE AREAS BY FILLING ANY GULLIES, RE- FERTILIZING, OVER- OR RE- SEEDING, AND MULCHING. SILT FENCE 1, INSPECT THE SILT FENCE/EROSION BERM PERIODICALLY AND AFTER EACH STORM EVENT. 2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. 4. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE. EROSION BERM /SEDIMENT TRAPS BASINS 1. INSPECT THE EROSION BERM AND SEDIMENT TRAPS PERIODICALLY AND AFTER EACH STORM EVENT. 2. RE -GRADE AND RE- ESTABLISH AS REQUIRED, 3. REMOVE DEPOSITED SEDIMENT BUILD UP ROUTINELY TO INSURE PROPER WORKING ORDER. 4, AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE BERM„ TRAPS AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE. 1. IN CASE OF DISCREPANCIES BETWEEN THE PLAN AND THE PLANT LIST, THE PLAN SHALL DICTATE 2. ALL SHRUB PLANTING AREAS TO BE COVERED W/ 3" LAYER OF SHREDDED HARDWOOD BARK MULCH. ALL GROUND COVER BEDS SHALL BE COVERED W/ 2" SHREDDED HARDWOOD BARK MULCH. MULCH SHALL BE APPROVED BY LANDSCAPE ARCHITECT AND SHALL BE UNIFORM IN TEXTURE AND COLOR AND SHALL BE OBTAINED FROM SAWMILL OR LUMBERING OPERATION. NO UTILITY MULCH OR PROCESSED TREE TRIMMINGS WILL BE ALLOWED. 3. AN APPROVED PRE EMERGENT HERBICIDE SHALL BE APPLIED IN ALL PLANTING BEDS AT A RATE SPECIFIED BY MANUFACTURER FOR EACH PLANT VARIETY. 4. FINAL PLACEMENT OF PLANT MATERIALS, ECT. SHALL BE APPROVED BY LANDSCAPE ARCHITECT BEFORE PLANTING OPERATIONS ARE TO PROCEED. ALL TREE LOCATIONS SHALL BE MARKED WITH A WOOD STAKE INDICATING VARIETY AND SIZE OF TREE. ALL GROUND COVER AND PLANTING BED LINES SHALL BE MARKED W/ HIGHLY VISIBLE PAINT LINES W/ OCCASIONAL WOOD STAKES FOR REFER- ENCE. ALL STAKES SHALL BE REMOVED FOLLOWING PLANTING OPERATIONS. LANDSCAPE ARCHITECT RESERVES THE RIGHT TO ADJUST PLANT LOCATIONS ON THE SITE. 5. NO SUBSTITUTIONS OF PLANT MATERIALS WILL BE ALLOWED. IF PLANTS ARE NOT AVAILABLE, THE CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT PRIOR TO BID IN WRITING. ALL PLANTS SHALL BE INSPECTED AND TAGGED WITH PROJECT I.D. AT NURSERY OR CONTRACTORS OPERATIONS PRIOR TO MOVING TO JOB SITE. PLANTS MAY BE INSPECTED AND APPROVED OR REJECTED ON THE .LOB SITE BY LANDSCAPE ARCHITECT. 6. ALL PLANTS SHALL MEET OR EXCEED AMERICAN STANDARDS FOR NURSERY STOCK, 1986 EDITION, AS SET FORTH BY AMERICAN ASSOCIATION OF NURSERYMEN. 7. PLANTS AND ALL OTHER MATERIALS TO BE STORED ON SITE WILL BE PLACED WHERE THEY WILL NOT CONFLICT W/ CONSTRUCTION OPERATIONS AND AS DIRECTED BY LANDSCAPE ARCHITECT. 8. ALL LANDSCAPE PLANTINGS SHALL BE GUAR- ANTEED FOR A PERIOD OF ONE YEAR FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT. AT THE END OF THIS PERIOD, PLANT MATERIAL TERMED DEAD OR UNSATISFACTORY BY LANDSCAPE ARCHITECT SHALL BE REPLACED AT NO ADDITIONAL. CHARGE BY THE LANDSCAPE CONTRACTOR. 9. LAWNS SHALL BE SEEDED FOLLOWING SCARIFYING, FINAL GRADING, FERTILIZING, AND RAKING. LAWN SHALL BE FERTILIZED W/ 12 -12 -12 ANALYSIS FERT. AT A RATE OF 10Ibs. /1000s.f.AND LIME APPLIED AS DICTATED BY SOILS TEST PRIOR TO SEEDING. LAWNS TO BE SEEDED W/ MECHANICAL SPREADER AT A RATE OF 5lbs. /1000s.f. APPLY SEED 1/2 ONE DIRECTION AND 1/2 PERPENDICULAR TO THE FIRST. LIGHTLY RAKE, ROLL W/ 200Ibs. ROLLER,AND APPLY HYDROMULCH (NO STRAW MULCH) AFTER SEEDING. PLANTING NOTES 10. THE LANDSCAPE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND FEES THAT MAY BE REQUIRED FOR HIS PORTION OF WORK. 11. PEATMOSS TO BE USED ON PROJECT SHALL BE DOMESTIC OR IMPORTED MATERIAL, CHOCOLATE BROWN IN COLOR AND COMPOSED OF PARTIALLY DECOMPOSED VEGETABLE MATERIAL. PEAT MOSS TO BE MILDLY ACIDIC IN CHARACTER AND SHALL BE APPROVED BY LANDSCAPE ARCHITECT. 12. LANDSCAPE CONTRACTOR SHALL NOTIFY LASNDSCAPE ARCHITECT IN WRITING PRIOR TO BID DATE OF ANY PLANTS HE /SHE FEELS MAY NOT SURVIVE IN LOCATIONS NOTED ON PLANS. 13. ALL DISTURBED LAWN AREAS SHALL BE SEEDED OR SODDED AS NOTED. PERMANENT SEEDED LAWNS AND SODDED LAWNS SHALL BE SEED MIX AS APPROVED BY LANDSCAPE ARCHITECT. SEED MIX SHALL CONSIST OF 34 POUNDS WABASH OR BARON KENTUCKY BLUEGRASS, 20 POUNDS PARK KENTUCKY BLUEGRASS, 10 POUNDS PENNLAWN FESCUE AND 26 POUNDS CERTIFIED FINE BLADED PERENNIAL RYEGRASS. 14. ALL LAWNS SHALL BE GUARANTEED TO HAVE A FULL UNIFORM STAND OF ACCEPTABLE GRASS AT THE END OF THE ONE YEAR GUARANTEE PERIOD WITH NO BARE SPOTS COMPRISING MORETHAN 2% OF ANY LAWN AREA. ANY AREA SO NOTED WILL BE SEEDED OR SODDED UNTIL AN ACCEPTABLE STAND OF GRASS IS ESTABLISHED. 15. ALL LANDSCAPE PLANTINGS TO BE MAINTAINED BY CONTRACTOR FOR 60 DAYS FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT. ALL SEEDED LAWNS SHALL BE MAIN- TAINED FOR 60 DAYS AND SODDED LAWNS 30 DAYS FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT AFTER WRITTEN REQUEST FROM THE LANDSCAPE CONTRACTOR. MAINTENANCE TO INCLUDE WATERING WEEDING, CULTIVATING, MULCHING, MOWING, AND ALL OTHER NECESSARY OPERATIONS REQUIRED FOR PROPER ESTABLISHMENT OF LAWNS AND PLANTINGS. 15. CONTRACTOR TO SUBMIT UNIT PRICES ON EVERY TYPE OF WORK AS REQUIRED BY LANDSCAPE ARCHITECT. 16. ALL LAWN AREAS WITHIN LAWN LIMIT LINES TO RECEIVE 4 -6" APPROVED TOPSOIL PRIOR TO SEEDING OPERATIONS. 17. BACKFILL FOR TREE PLANTING SHALL BE 75% APPROVED TOPSOIL AND 25% APPROVED PEAT MOSS. TOP LAYER OF BACKFILL SHALL BE 100% EXISTING TOPSOIL.. A 5 -10-5 ANALYSIS SLOW RELEASE FERTILIZER SHALL BE INCORPORATED INTO BACK- FILL AT APPROVED RATES. 18. ALL EXISTING TREES TO BE RELOCATED SHALL BE DIRECT TRANSPLANTED BY A MECHANICAL TREE SPADE IN A PROPER SIZE AS DETERMINED BY AMERICAN ASSOC. OF NURSERYMEN STANDARDS FOR PLANT MATERIAL. ALL TRANSPLANTING OF TREES SHALL BE DONE DURING THE PROER SEASON FOR EACH SPECIES. TREES SHALL BE RELOCATED DIRECTLY TO NEW LOCATIONS OR TO HOLDING AREA FOR LATER TRANSPLANT FOLLOWING CONSTRUCTION. FINAL LOCATION AND SIZE ARE NOTED ON PLANS. ROSTN PREVENrlON 1. INSTALL TEMPORARY RISER ON EXISTING 24" RCP OUTFLOW PIPE AT THE SOUTHEAST CORNER OF EXISTING POND 2, CONSTRUCT TEMPORARY DIVERSION DITCH AT SOUTH END OF SITE, 3. INSTALL SILT FENCE, EROSION BERMS AND TEMPORARY SEDIMENT TRAPS PRIOR TO ANY EARTHMOVING ACTIVITY, 4. CLEAR AND GRUB SITE 5. STRIP AND STOCKPILE TOPSOIL (IN DESIGNATED AREA) 6, ROUGH GRADE PHASE AND PHASE AREA 7, SEED PHASE AREA 6. BEGIN EXCAVATION OF RE1EW 10N POND #3 LEAVING BERM BETWEEN EASING POND 9, REPLACE REQUIRED FILL FROM POND TO PAD AREA, BRING PHASE I TO PLAN. 10. CONSTRUCT TEMPORARY ACCESS DRIVE AND LAYDOWN AREA, 11, COMMENCE DE-- WATERING AND FIWNG WEST 1/2 OF EXISTING POND. 12, CONSTRUCT RELOCATED INDIANA WATERWAY AND WETLAND AREA FROM DOWNSTREAM END AND INSTALL CHECK DAMS, 13. CONSTRUCT PONDS AND #2, USING POND #2 AS A TEMPORARY SEDIMENT BASIN AND INSTALL TEMPORARY INLET PROTECTION AROUND STRUCTURE IN POND #2, 14. SHAPE PARKING LOT, BUILDING PAD AND CONSTRUCT DRAINAGE INFRASTRUCTURE, 15. SEED ROUGH GRADED AREAS THAT %ILL NOT BE PAVED. 16.INSTALL INLET PROTECTION WHEN EACH STRUCTURE IS INSTALLED. 17, REPLACE TOPSOIL UPON COMPLETION OF ROUGH GRADING, FINE GRADE TO PLAN ELEVATIONS, 18, FINAL SEEDING SHOULD BE INSTALLED AS SOON AS POSSIBLE AFTER FINAL GRADING, IT IS RECOMMENDED THAT NO MORE THAN SEVEN DAYS PASS BEFORE FINAL SEEDING HAS BEGUN. 19, REMOVAL OF TEMPORARY EROSION CONTROL DEVICES SHALL FOLLOW THE GUIDELINES OUTLINED IN "EROSION CONTROL MAINTENANCE" PROCEDURES HEREON. SHEET REVISIONS O PRE -BID SET ISSUE DATE 0 POST BID SET ISSUE DATE C -605 CSI PROJ. #00 --113