HomeMy WebLinkAbout036-01 C-605 Site DetailsEROSION NETTING
170 000
SO. FT
SEEDING
/s-
-4!;47/A C.
SILT FENCE
WOO
L. F
INLET PRO TEC TION
5
E4.
TEMPORARY SEDIMEN T TRAP
El.
TEMPORARY SEDIMENT BASIN
1
1 EA.
TEMPORARY Dl VERSION DI TCH
0
L.F.
3" LAYER OF SHREDDED
HARDWOOD BARK MULCH
CAP PLANTING PIT W /ON
SITE CLAY TOPSOIL PRIOR
TO MULCHING (2-3")
EARTH SAUCER
FIN. GRADE
I E
1_ 1 I
1!I Ili li!
I j 1
1-1
il i lll l
EXISTING SOIL OR
COMPACTED BACKFILL
6" MAX.
SHRUB PLANTING DETAIL
NTS
STAPLE PATTERN "D"
3 staples per sq. yd.
using 6 -inch, 11 gauge
wire "U" staples.
8 -inch and longer staples
may be used for loose soils.
9 gauge staples may be
necessary in hard or
rocky soils.
Erosion netting shall be
required for the Iwlale
bottom. Use North American
Green Blanket No 5-150
or equivalent
STABILIZATION JAN. FEB. MAR. APR. MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC.
PRACTICE
PERMANENT A- *////1//// Ai,
SEEDING MINIM
DORMANT
SEEDING
TEMPORARY
SEEDING
SODDING
MULCHING
B ---ti
G
F /I
A KENTUCKY BLUEGRASS 40 LBS /ACRE; CREEPING RED FESCUE 40 LBS /ACRE;
PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 20 LBS /ACRE.
B KENTUCKY BLUEGRASS 60 LBS /ACRE; CREEPING RED FESCUE 60 LBS /ACRE;
PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 30 LBS /ACRE.
C SPRING OATS 3 BUSHEL /ACRE,
D WHEAT OR RYE 2 BUSHEL /ACRE.
E ANNUAL RYEGRASS 40 LBS /ACRE.
F SOD
G STRAW MULCH 2 TONS /ACRE.
/I IRRIGATION NEEDED DURING JUNE, JULY, AND /OR SEPTEMBER
IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD
SEASONAL SOIL PRO TEC TION CHAR T
*NOTE RIGHT -OF -WAY SHALL BE SEEDED OR SODDED, AND
SHALL ONLY BE MIXTURE "A OR "B'; DEPENDING ON 77ME OF YEAR
FINAL SEEDING RECOMMENDATION
SEED BLEND: 60% TURF TYPE TALL FESCUE (2 -3 VARIETIES)
25% PERENNIAL RYE
10% BLUEGRASS
5% ANNUAL RYE
APPLY FERTILIZER AT A RATE ADEQUATE TO PROVIDE 1 LB. OF ACTUAL NITROGEN
PER 1,000 S.F. OF COMPOSITION 5- .-10 -5.
ADD LIME TO TOPSOIL TO OBTAIN A pH RANGE OF 6.0 TO 7.0.
MULCH SHALL BE APPLIED TO SLOPED AREAS AT THE RATE OF 2 TONS PER ACRE,
�F-
20*
N
X
X X X
6.5'
EROSION NETTING/SLOPE STABIUZA'RON
EROSION NETTING
(NO SCALE)
PLACE SOIL BALL SLIGHTLY
HIGHER THAN FIN. GRADE.
MOUND SOIL OVER BALL,
RHODODENDRONS OTHER
ERICACEOUS PLANTS, PLACE
AND MOUND PEATMOSS
OVER BALL MULCH
HEAVILY.
INSTALL FERTILIZER TABLETS
OR SPI <ES
1 -1
I
I -I j li
I ^Iif I
I i
1 H. L 1 I i_ mP BLOC<
11 -1 FILTER FABRIC
SOIL BACKFILL TO BE 75%
TOPSOIL 25% PEATMOSS
TAMPED TO PREVENT
SETTLEMENT.
I.
DOUBLE STRAND 12 GA.
WIRE TWISHED IN RUBBER
HOSE 6 FROM TOP
STAKES
SUITABLE CORD
BANDING
BURLAP OR HEAVY
CREPE TREE WRAP
MATERIAL
PLACE SOIL BALL
SLIGHTLY HIGHER THAN
EXISTING GRADE, MOUND
SOIL OVER BALL
FINAL GRADE
WEED BLOCK ..I i 1 =111=
11
FILTER FABRIC 11 ii
i
�!1
SOIL BACKFILL TO BE 75%
TOPSOIL 25% PEAT
(TAMPED)
REMOVE BINDING
TREE PLANTING DETAIL
NTS
1" ABOVE 1" LAYER OF SHREDDED FIN. GRADE
GRADE HARDWOOD MULCH
GROUND COVER PLANING SOtiL TO BE 1 PART MANURE,
5 PARTS TOPSOIL AND 4 PARTS PEATMOSS, DEPTH 4".
A FULL LAYER (MIN. COMPLETED DEPTH) OF SHREDDED
FIBROUS PEATMOSS MAY BE USED II\ LIEU OF PLANTING
MIX. INCLUDE FERTILIZER AT APPROVED RATES.
GROUND COVER
OR FLOWER BED DETAIL
NTS
See plan for width
F i i I
I1
OF
H
I_ t i -1 1 1 -1 -I 1 -1 F
I I
COMPACTED GRANULAR SUBGRADE
#2 STONE
GRA DEL CONSTRUCTION ENTRANCE
CAP PLANTING PIT W/
2 -3" OF CLAY TOPSOIL
PRIOR TO MULCHING
3" LAYER OF SHEDDED
HARDWOOD MULCH
INSTALL FERTILIZER
TABLETS OR SPIKES
EARTH SAUCER
-1 -1 1-
I
II
i 1 ;I
F F
iii I I 1 NOTE: STAKE GUY
FI TREES AS SHOWN IF
MAX. SITE CONDITIONS DICTATE
EXISTING SUBSOIL OR
COMPACTED BACKFILL
11 1 I I I I I F I I I I I
1 I I 1! 1 I= 111
I =!fi -11=11 iii` 111_1i1 -11i j1 -rh
I I= I I I I I I
EROS /ON CONTROL SUMMARY
EROSION GON7ROL MAINTT'NANCZ
EROS /ON CONTROL NOTES
1. NO LAND CLEARING OR GRADING SHALL BEGIN
UNTIL EROSION CONTROL MEASURES HAVE
BEEN INSTALLED, IN ACCORDANCE WITH THE
PHASING SEQUENCE SHOWN IN THESE PLANS.
2. ALL EXPOSED AREAS SHALL BE SEEDED AS
SPECIFIED WI THIN 30 DA YS OF FINAL
GRADING,
3. SHOULD CONSTRUCTION STOP FOR LONGER
THAN 15 DAYS, THE SITE SHALL BE SEEDED
AS SPECIFIED.
4. MAINTAIN EROSION CONTROL MEASURES AFTER
EACH RAIN AND AT LEAST ONCE A WEEK.
5. THIS PLAN SHALL NOT BE CONSIDERED ALL
INCLUSIVE AS THE CONTRACTOR SHALL TAKE
ALL NECESSARY PRECAUTIONS TO PREVENT SOIL
SEDIMENT FROM LEAVING THE SITE.
6. CONTRACTOR SHALL COMPLY W/TH ALL STATE
AND LOCAL ORDINANCES THAT APPLY.
7. ADDITIONAL EROSION AND SEDIMENT CONTROL
MEASURES WILL BE INSTALLED IF DEEMED
NECESSARY BY ON SITE INSPECTION.
8. LAND DISTURBING ACTIV /TIES SHALL NOT
COMMENCE UNTIL APPROVAL TO DO SO HAS
BEEN RECEIVED BY GOVERNING AUTHORITIES
9. IF INSTALLATION OF STORM DRAINAGE SYSTEM
SHOULD BE INTERRUPTED BY WEATHER OR
NIGHTFALL, THE. PIPE ENDS SHALL BE COVERED
WITH FILTER FABRIC.
10. ALL EXISTING STRUCTURES, FENCING, TREES,
AND ETC, WITHIN CONSTRUCTION AREA SHALL
BE REMOVED AND DISPOSED OF OFF SITE.
ANY BURNING ON SITE SHALL BE SUBJECT TO
LOCAL ORDINANCES AND LOWES SPECIFICATIONS
11. CONTRACTOR SHALL BE RESPONSIBLE TO TAKE WHATEVER
MEANS NECESSARY TO ESTABLISH PERMANENT SOIL
STABILIZATION.
12. SEDIMENT SHALL BE REMOVED FROM THE SEDIMENT
BASIN BEFORE /T IS 50Z FULL.
13. SEDIMENT BASIN OUTLET STRUCTURE CMP SIZED
TO INCLUDE EMERGENCY SPILLWAY FOR 10 YR. STORM
EROSION CONTROL BLANKET
4 4UR1NG VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY EROSION BELOW THE BLANKET.
2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET COVERING IT, ADD SOIL, RE -SEED
THE AREA, AND RE -LAY AND STAPLE THE BLANKET.
3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY.
PERMANENT SEEDING
1. INSPECT PERIODICALLY, ESPECIALLY AFTER STORM EVENTS, UNTIL THE STAND IS SUCCESSFULLY ESTABLISHED,
2. PLAN TO ADD FERTILIZER THE FOLLOWING GROWING SEASON ACCORDING TO SOIL TEST RECOMMENDATIONS.
3. REPAIR DAMAGED, BARE, OR SPARSE AREAS BY FILLING ANY GULLIES, RE- FERTILIZING, OVER- OR RE- SEEDING,
AND MULCHING.
SILT FENCE
1, INSPECT THE SILT FENCE/EROSION BERM PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE
AFFECTED PORTION IMMEDIATELY.
3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS
CAUSING THE FABRIC TO BULGE.
4. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS,
BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
EROSION BERM /SEDIMENT TRAPS BASINS
1. INSPECT THE EROSION BERM AND SEDIMENT TRAPS PERIODICALLY AND AFTER EACH STORM EVENT.
2. RE -GRADE AND RE- ESTABLISH AS REQUIRED,
3. REMOVE DEPOSITED SEDIMENT BUILD UP ROUTINELY TO INSURE PROPER WORKING ORDER.
4, AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE BERM„ TRAPS AND SEDIMENT DEPOSITS,
BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
1. IN CASE OF DISCREPANCIES BETWEEN THE PLAN
AND THE PLANT LIST, THE PLAN SHALL DICTATE
2. ALL SHRUB PLANTING AREAS TO BE COVERED W/
3" LAYER OF SHREDDED HARDWOOD BARK MULCH.
ALL GROUND COVER BEDS SHALL BE COVERED W/
2" SHREDDED HARDWOOD BARK MULCH. MULCH
SHALL BE APPROVED BY LANDSCAPE ARCHITECT AND SHALL
BE UNIFORM IN TEXTURE AND COLOR AND SHALL
BE OBTAINED FROM SAWMILL OR LUMBERING OPERATION.
NO UTILITY MULCH OR PROCESSED TREE
TRIMMINGS WILL BE ALLOWED.
3. AN APPROVED PRE EMERGENT HERBICIDE SHALL
BE APPLIED IN ALL PLANTING BEDS AT A RATE
SPECIFIED BY MANUFACTURER FOR EACH PLANT
VARIETY.
4. FINAL PLACEMENT OF PLANT MATERIALS, ECT.
SHALL BE APPROVED BY LANDSCAPE ARCHITECT BEFORE
PLANTING OPERATIONS ARE TO PROCEED. ALL
TREE LOCATIONS SHALL BE MARKED WITH A WOOD
STAKE INDICATING VARIETY AND SIZE OF TREE.
ALL GROUND COVER AND PLANTING BED LINES
SHALL BE MARKED W/ HIGHLY VISIBLE PAINT
LINES W/ OCCASIONAL WOOD STAKES FOR REFER-
ENCE. ALL STAKES SHALL BE REMOVED FOLLOWING
PLANTING OPERATIONS. LANDSCAPE ARCHITECT RESERVES
THE RIGHT TO ADJUST PLANT LOCATIONS ON THE SITE.
5. NO SUBSTITUTIONS OF PLANT MATERIALS WILL BE
ALLOWED. IF PLANTS ARE NOT AVAILABLE, THE
CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT
PRIOR TO BID IN WRITING. ALL PLANTS SHALL BE
INSPECTED AND TAGGED WITH PROJECT I.D. AT
NURSERY OR CONTRACTORS OPERATIONS PRIOR
TO MOVING TO JOB SITE. PLANTS MAY BE
INSPECTED AND APPROVED OR REJECTED ON THE
.LOB SITE BY LANDSCAPE ARCHITECT.
6. ALL PLANTS SHALL MEET OR EXCEED AMERICAN
STANDARDS FOR NURSERY STOCK, 1986 EDITION,
AS SET FORTH BY AMERICAN ASSOCIATION OF
NURSERYMEN.
7. PLANTS AND ALL OTHER MATERIALS TO BE STORED
ON SITE WILL BE PLACED WHERE THEY WILL NOT
CONFLICT W/ CONSTRUCTION OPERATIONS AND AS
DIRECTED BY LANDSCAPE ARCHITECT.
8. ALL LANDSCAPE PLANTINGS SHALL BE GUAR-
ANTEED FOR A PERIOD OF ONE YEAR FOLLOWING
FINAL INSPECTION BY LANDSCAPE ARCHITECT. AT THE
END OF THIS PERIOD, PLANT MATERIAL TERMED DEAD
OR UNSATISFACTORY BY LANDSCAPE ARCHITECT SHALL BE
REPLACED AT NO ADDITIONAL. CHARGE BY THE
LANDSCAPE CONTRACTOR.
9. LAWNS SHALL BE SEEDED FOLLOWING SCARIFYING,
FINAL GRADING, FERTILIZING, AND RAKING.
LAWN SHALL BE FERTILIZED W/ 12 -12 -12 ANALYSIS
FERT. AT A RATE OF 10Ibs. /1000s.f.AND LIME
APPLIED AS DICTATED BY SOILS TEST PRIOR TO
SEEDING. LAWNS TO BE SEEDED W/ MECHANICAL
SPREADER AT A RATE OF 5lbs. /1000s.f. APPLY
SEED 1/2 ONE DIRECTION AND 1/2 PERPENDICULAR
TO THE FIRST. LIGHTLY RAKE, ROLL W/ 200Ibs.
ROLLER,AND APPLY HYDROMULCH (NO STRAW MULCH)
AFTER SEEDING.
PLANTING NOTES
10. THE LANDSCAPE CONTRACTOR SHALL OBTAIN AND
PAY FOR ALL PERMITS AND FEES THAT MAY BE
REQUIRED FOR HIS PORTION OF WORK.
11. PEATMOSS TO BE USED ON PROJECT SHALL BE
DOMESTIC OR IMPORTED MATERIAL, CHOCOLATE
BROWN IN COLOR AND COMPOSED OF PARTIALLY
DECOMPOSED VEGETABLE MATERIAL. PEAT MOSS
TO BE MILDLY ACIDIC IN CHARACTER AND SHALL
BE APPROVED BY LANDSCAPE ARCHITECT.
12. LANDSCAPE CONTRACTOR SHALL NOTIFY LASNDSCAPE
ARCHITECT IN WRITING PRIOR TO BID DATE OF ANY
PLANTS HE /SHE FEELS MAY NOT SURVIVE IN LOCATIONS
NOTED ON PLANS.
13. ALL DISTURBED LAWN AREAS SHALL BE SEEDED
OR SODDED AS NOTED. PERMANENT SEEDED LAWNS
AND SODDED LAWNS SHALL BE SEED MIX AS APPROVED
BY LANDSCAPE ARCHITECT. SEED MIX SHALL CONSIST OF
34 POUNDS WABASH OR BARON KENTUCKY
BLUEGRASS, 20 POUNDS PARK KENTUCKY
BLUEGRASS, 10 POUNDS PENNLAWN FESCUE
AND 26 POUNDS CERTIFIED FINE BLADED
PERENNIAL RYEGRASS.
14. ALL LAWNS SHALL BE GUARANTEED TO HAVE A FULL
UNIFORM STAND OF ACCEPTABLE GRASS AT THE END
OF THE ONE YEAR GUARANTEE PERIOD WITH NO
BARE SPOTS COMPRISING MORETHAN 2% OF ANY
LAWN AREA. ANY AREA SO NOTED WILL BE SEEDED OR
SODDED UNTIL AN ACCEPTABLE STAND OF GRASS IS
ESTABLISHED.
15. ALL LANDSCAPE PLANTINGS TO BE MAINTAINED BY
CONTRACTOR FOR 60 DAYS FOLLOWING FINAL INSPECTION BY
LANDSCAPE ARCHITECT. ALL SEEDED LAWNS SHALL BE MAIN-
TAINED FOR 60 DAYS AND SODDED LAWNS 30 DAYS
FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT
AFTER WRITTEN REQUEST FROM THE LANDSCAPE
CONTRACTOR. MAINTENANCE TO INCLUDE WATERING
WEEDING, CULTIVATING, MULCHING, MOWING, AND
ALL OTHER NECESSARY OPERATIONS REQUIRED FOR
PROPER ESTABLISHMENT OF LAWNS AND PLANTINGS.
15. CONTRACTOR TO SUBMIT UNIT PRICES ON EVERY
TYPE OF WORK AS REQUIRED BY LANDSCAPE ARCHITECT.
16. ALL LAWN AREAS WITHIN LAWN LIMIT LINES TO
RECEIVE 4 -6" APPROVED TOPSOIL PRIOR TO
SEEDING OPERATIONS.
17. BACKFILL FOR TREE PLANTING SHALL BE 75%
APPROVED TOPSOIL AND 25% APPROVED PEAT MOSS.
TOP LAYER OF BACKFILL SHALL BE 100% EXISTING
TOPSOIL.. A 5 -10-5 ANALYSIS SLOW RELEASE
FERTILIZER SHALL BE INCORPORATED INTO BACK-
FILL AT APPROVED RATES.
18. ALL EXISTING TREES TO BE RELOCATED SHALL BE
DIRECT TRANSPLANTED BY A MECHANICAL TREE
SPADE IN A PROPER SIZE AS DETERMINED BY
AMERICAN ASSOC. OF NURSERYMEN STANDARDS
FOR PLANT MATERIAL. ALL TRANSPLANTING OF
TREES SHALL BE DONE DURING THE PROER SEASON
FOR EACH SPECIES. TREES SHALL BE RELOCATED
DIRECTLY TO NEW LOCATIONS OR TO HOLDING AREA
FOR LATER TRANSPLANT FOLLOWING CONSTRUCTION.
FINAL LOCATION AND SIZE ARE NOTED ON PLANS.
ROSTN PREVENrlON
1. INSTALL TEMPORARY RISER ON EXISTING 24" RCP OUTFLOW PIPE AT THE SOUTHEAST CORNER
OF EXISTING POND
2, CONSTRUCT TEMPORARY DIVERSION DITCH AT SOUTH END OF SITE,
3. INSTALL SILT FENCE, EROSION BERMS AND TEMPORARY SEDIMENT TRAPS PRIOR TO ANY
EARTHMOVING ACTIVITY,
4. CLEAR AND GRUB SITE
5. STRIP AND STOCKPILE TOPSOIL (IN DESIGNATED AREA)
6, ROUGH GRADE PHASE AND PHASE AREA
7, SEED PHASE AREA
6. BEGIN EXCAVATION OF RE1EW 10N POND #3 LEAVING BERM BETWEEN EASING POND
9, REPLACE REQUIRED FILL FROM POND TO PAD AREA, BRING PHASE I TO PLAN.
10. CONSTRUCT TEMPORARY ACCESS DRIVE AND LAYDOWN AREA,
11, COMMENCE DE-- WATERING AND FIWNG WEST 1/2 OF EXISTING POND.
12, CONSTRUCT RELOCATED INDIANA WATERWAY AND WETLAND AREA FROM DOWNSTREAM END AND
INSTALL CHECK DAMS,
13. CONSTRUCT PONDS AND #2, USING POND #2 AS A TEMPORARY SEDIMENT BASIN
AND INSTALL TEMPORARY INLET PROTECTION AROUND STRUCTURE IN POND #2,
14. SHAPE PARKING LOT, BUILDING PAD AND CONSTRUCT DRAINAGE INFRASTRUCTURE,
15. SEED ROUGH GRADED AREAS THAT %ILL NOT BE PAVED.
16.INSTALL INLET PROTECTION WHEN EACH STRUCTURE IS INSTALLED.
17, REPLACE TOPSOIL UPON COMPLETION OF ROUGH GRADING, FINE GRADE TO PLAN ELEVATIONS,
18, FINAL SEEDING SHOULD BE INSTALLED AS SOON AS POSSIBLE AFTER FINAL GRADING,
IT IS RECOMMENDED THAT NO MORE THAN SEVEN DAYS PASS BEFORE FINAL SEEDING HAS
BEGUN.
19, REMOVAL OF TEMPORARY EROSION CONTROL DEVICES SHALL FOLLOW THE GUIDELINES
OUTLINED IN "EROSION CONTROL MAINTENANCE" PROCEDURES HEREON.
SHEET
REVISIONS
O PRE -BID SET
ISSUE DATE
0 POST BID SET
ISSUE DATE
C -605
CSI PROJ. #00 --113
DATE
DESCRIPTION
12/12
1 O
ADD G.N. /REV. SEQ.
U
7n
.1
r
:tea
r, J 3
#t t.
Y t
rot
82Q6
*TKKO C
CV
iii A.
?hp
s st4
orn r ne
7 tir
D k 1 5 r S ur ve y s j
Inc
n 1
CD
'SITE DETAILS
YI
'r
w
1.1,:i
...c
4_,
co
NI-
O
m
z
Ct
a
0
W
0
U
E_ Lu
((I) Q
c
w
W (.1)
(L
i' Q
1'-- D
v
Qw
z cn
o (1)
3" LAYER OF SHREDDED
HARDWOOD BARK MULCH
CAP PLANTING PIT W /ON
SITE CLAY TOPSOIL PRIOR
TO MULCHING (2-3")
EARTH SAUCER
FIN. GRADE
I E
1_ 1 I
1!I Ili li!
I j 1
1-1
il i lll l
EXISTING SOIL OR
COMPACTED BACKFILL
6" MAX.
SHRUB PLANTING DETAIL
NTS
STAPLE PATTERN "D"
3 staples per sq. yd.
using 6 -inch, 11 gauge
wire "U" staples.
8 -inch and longer staples
may be used for loose soils.
9 gauge staples may be
necessary in hard or
rocky soils.
Erosion netting shall be
required for the Iwlale
bottom. Use North American
Green Blanket No 5-150
or equivalent
STABILIZATION JAN. FEB. MAR. APR. MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC.
PRACTICE
PERMANENT A- *////1//// Ai,
SEEDING MINIM
DORMANT
SEEDING
TEMPORARY
SEEDING
SODDING
MULCHING
B ---ti
G
F /I
A KENTUCKY BLUEGRASS 40 LBS /ACRE; CREEPING RED FESCUE 40 LBS /ACRE;
PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 20 LBS /ACRE.
B KENTUCKY BLUEGRASS 60 LBS /ACRE; CREEPING RED FESCUE 60 LBS /ACRE;
PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 30 LBS /ACRE.
C SPRING OATS 3 BUSHEL /ACRE,
D WHEAT OR RYE 2 BUSHEL /ACRE.
E ANNUAL RYEGRASS 40 LBS /ACRE.
F SOD
G STRAW MULCH 2 TONS /ACRE.
/I IRRIGATION NEEDED DURING JUNE, JULY, AND /OR SEPTEMBER
IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD
SEASONAL SOIL PRO TEC TION CHAR T
*NOTE RIGHT -OF -WAY SHALL BE SEEDED OR SODDED, AND
SHALL ONLY BE MIXTURE "A OR "B'; DEPENDING ON 77ME OF YEAR
FINAL SEEDING RECOMMENDATION
SEED BLEND: 60% TURF TYPE TALL FESCUE (2 -3 VARIETIES)
25% PERENNIAL RYE
10% BLUEGRASS
5% ANNUAL RYE
APPLY FERTILIZER AT A RATE ADEQUATE TO PROVIDE 1 LB. OF ACTUAL NITROGEN
PER 1,000 S.F. OF COMPOSITION 5- .-10 -5.
ADD LIME TO TOPSOIL TO OBTAIN A pH RANGE OF 6.0 TO 7.0.
MULCH SHALL BE APPLIED TO SLOPED AREAS AT THE RATE OF 2 TONS PER ACRE,
�F-
20*
N
X
X X X
6.5'
EROSION NETTING/SLOPE STABIUZA'RON
EROSION NETTING
(NO SCALE)
PLACE SOIL BALL SLIGHTLY
HIGHER THAN FIN. GRADE.
MOUND SOIL OVER BALL,
RHODODENDRONS OTHER
ERICACEOUS PLANTS, PLACE
AND MOUND PEATMOSS
OVER BALL MULCH
HEAVILY.
INSTALL FERTILIZER TABLETS
OR SPI <ES
1 -1
I
I -I j li
I ^Iif I
I i
1 H. L 1 I i_ mP BLOC<
11 -1 FILTER FABRIC
SOIL BACKFILL TO BE 75%
TOPSOIL 25% PEATMOSS
TAMPED TO PREVENT
SETTLEMENT.
I.
DOUBLE STRAND 12 GA.
WIRE TWISHED IN RUBBER
HOSE 6 FROM TOP
STAKES
SUITABLE CORD
BANDING
BURLAP OR HEAVY
CREPE TREE WRAP
MATERIAL
PLACE SOIL BALL
SLIGHTLY HIGHER THAN
EXISTING GRADE, MOUND
SOIL OVER BALL
FINAL GRADE
WEED BLOCK ..I i 1 =111=
11
FILTER FABRIC 11 ii
i
�!1
SOIL BACKFILL TO BE 75%
TOPSOIL 25% PEAT
(TAMPED)
REMOVE BINDING
TREE PLANTING DETAIL
NTS
1" ABOVE 1" LAYER OF SHREDDED FIN. GRADE
GRADE HARDWOOD MULCH
GROUND COVER PLANING SOtiL TO BE 1 PART MANURE,
5 PARTS TOPSOIL AND 4 PARTS PEATMOSS, DEPTH 4".
A FULL LAYER (MIN. COMPLETED DEPTH) OF SHREDDED
FIBROUS PEATMOSS MAY BE USED II\ LIEU OF PLANTING
MIX. INCLUDE FERTILIZER AT APPROVED RATES.
GROUND COVER
OR FLOWER BED DETAIL
NTS
See plan for width
F i i I
I1
OF
H
I_ t i -1 1 1 -1 -I 1 -1 F
I I
COMPACTED GRANULAR SUBGRADE
#2 STONE
GRA DEL CONSTRUCTION ENTRANCE
CAP PLANTING PIT W/
2 -3" OF CLAY TOPSOIL
PRIOR TO MULCHING
3" LAYER OF SHEDDED
HARDWOOD MULCH
INSTALL FERTILIZER
TABLETS OR SPIKES
EARTH SAUCER
-1 -1 1-
I
II
i 1 ;I
F F
iii I I 1 NOTE: STAKE GUY
FI TREES AS SHOWN IF
MAX. SITE CONDITIONS DICTATE
EXISTING SUBSOIL OR
COMPACTED BACKFILL
11 1 I I I I I F I I I I I
1 I I 1! 1 I= 111
I =!fi -11=11 iii` 111_1i1 -11i j1 -rh
I I= I I I I I I
EROS /ON CONTROL SUMMARY
EROSION GON7ROL MAINTT'NANCZ
EROS /ON CONTROL NOTES
1. NO LAND CLEARING OR GRADING SHALL BEGIN
UNTIL EROSION CONTROL MEASURES HAVE
BEEN INSTALLED, IN ACCORDANCE WITH THE
PHASING SEQUENCE SHOWN IN THESE PLANS.
2. ALL EXPOSED AREAS SHALL BE SEEDED AS
SPECIFIED WI THIN 30 DA YS OF FINAL
GRADING,
3. SHOULD CONSTRUCTION STOP FOR LONGER
THAN 15 DAYS, THE SITE SHALL BE SEEDED
AS SPECIFIED.
4. MAINTAIN EROSION CONTROL MEASURES AFTER
EACH RAIN AND AT LEAST ONCE A WEEK.
5. THIS PLAN SHALL NOT BE CONSIDERED ALL
INCLUSIVE AS THE CONTRACTOR SHALL TAKE
ALL NECESSARY PRECAUTIONS TO PREVENT SOIL
SEDIMENT FROM LEAVING THE SITE.
6. CONTRACTOR SHALL COMPLY W/TH ALL STATE
AND LOCAL ORDINANCES THAT APPLY.
7. ADDITIONAL EROSION AND SEDIMENT CONTROL
MEASURES WILL BE INSTALLED IF DEEMED
NECESSARY BY ON SITE INSPECTION.
8. LAND DISTURBING ACTIV /TIES SHALL NOT
COMMENCE UNTIL APPROVAL TO DO SO HAS
BEEN RECEIVED BY GOVERNING AUTHORITIES
9. IF INSTALLATION OF STORM DRAINAGE SYSTEM
SHOULD BE INTERRUPTED BY WEATHER OR
NIGHTFALL, THE. PIPE ENDS SHALL BE COVERED
WITH FILTER FABRIC.
10. ALL EXISTING STRUCTURES, FENCING, TREES,
AND ETC, WITHIN CONSTRUCTION AREA SHALL
BE REMOVED AND DISPOSED OF OFF SITE.
ANY BURNING ON SITE SHALL BE SUBJECT TO
LOCAL ORDINANCES AND LOWES SPECIFICATIONS
11. CONTRACTOR SHALL BE RESPONSIBLE TO TAKE WHATEVER
MEANS NECESSARY TO ESTABLISH PERMANENT SOIL
STABILIZATION.
12. SEDIMENT SHALL BE REMOVED FROM THE SEDIMENT
BASIN BEFORE /T IS 50Z FULL.
13. SEDIMENT BASIN OUTLET STRUCTURE CMP SIZED
TO INCLUDE EMERGENCY SPILLWAY FOR 10 YR. STORM
EROSION CONTROL BLANKET
4 4UR1NG VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY EROSION BELOW THE BLANKET.
2. IF ANY AREA SHOWS EROSION, PULL BACK THAT PORTION OF THE BLANKET COVERING IT, ADD SOIL, RE -SEED
THE AREA, AND RE -LAY AND STAPLE THE BLANKET.
3. AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY.
PERMANENT SEEDING
1. INSPECT PERIODICALLY, ESPECIALLY AFTER STORM EVENTS, UNTIL THE STAND IS SUCCESSFULLY ESTABLISHED,
2. PLAN TO ADD FERTILIZER THE FOLLOWING GROWING SEASON ACCORDING TO SOIL TEST RECOMMENDATIONS.
3. REPAIR DAMAGED, BARE, OR SPARSE AREAS BY FILLING ANY GULLIES, RE- FERTILIZING, OVER- OR RE- SEEDING,
AND MULCHING.
SILT FENCE
1, INSPECT THE SILT FENCE/EROSION BERM PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE
AFFECTED PORTION IMMEDIATELY.
3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS
CAUSING THE FABRIC TO BULGE.
4. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS,
BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
EROSION BERM /SEDIMENT TRAPS BASINS
1. INSPECT THE EROSION BERM AND SEDIMENT TRAPS PERIODICALLY AND AFTER EACH STORM EVENT.
2. RE -GRADE AND RE- ESTABLISH AS REQUIRED,
3. REMOVE DEPOSITED SEDIMENT BUILD UP ROUTINELY TO INSURE PROPER WORKING ORDER.
4, AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE BERM„ TRAPS AND SEDIMENT DEPOSITS,
BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
1. IN CASE OF DISCREPANCIES BETWEEN THE PLAN
AND THE PLANT LIST, THE PLAN SHALL DICTATE
2. ALL SHRUB PLANTING AREAS TO BE COVERED W/
3" LAYER OF SHREDDED HARDWOOD BARK MULCH.
ALL GROUND COVER BEDS SHALL BE COVERED W/
2" SHREDDED HARDWOOD BARK MULCH. MULCH
SHALL BE APPROVED BY LANDSCAPE ARCHITECT AND SHALL
BE UNIFORM IN TEXTURE AND COLOR AND SHALL
BE OBTAINED FROM SAWMILL OR LUMBERING OPERATION.
NO UTILITY MULCH OR PROCESSED TREE
TRIMMINGS WILL BE ALLOWED.
3. AN APPROVED PRE EMERGENT HERBICIDE SHALL
BE APPLIED IN ALL PLANTING BEDS AT A RATE
SPECIFIED BY MANUFACTURER FOR EACH PLANT
VARIETY.
4. FINAL PLACEMENT OF PLANT MATERIALS, ECT.
SHALL BE APPROVED BY LANDSCAPE ARCHITECT BEFORE
PLANTING OPERATIONS ARE TO PROCEED. ALL
TREE LOCATIONS SHALL BE MARKED WITH A WOOD
STAKE INDICATING VARIETY AND SIZE OF TREE.
ALL GROUND COVER AND PLANTING BED LINES
SHALL BE MARKED W/ HIGHLY VISIBLE PAINT
LINES W/ OCCASIONAL WOOD STAKES FOR REFER-
ENCE. ALL STAKES SHALL BE REMOVED FOLLOWING
PLANTING OPERATIONS. LANDSCAPE ARCHITECT RESERVES
THE RIGHT TO ADJUST PLANT LOCATIONS ON THE SITE.
5. NO SUBSTITUTIONS OF PLANT MATERIALS WILL BE
ALLOWED. IF PLANTS ARE NOT AVAILABLE, THE
CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT
PRIOR TO BID IN WRITING. ALL PLANTS SHALL BE
INSPECTED AND TAGGED WITH PROJECT I.D. AT
NURSERY OR CONTRACTORS OPERATIONS PRIOR
TO MOVING TO JOB SITE. PLANTS MAY BE
INSPECTED AND APPROVED OR REJECTED ON THE
.LOB SITE BY LANDSCAPE ARCHITECT.
6. ALL PLANTS SHALL MEET OR EXCEED AMERICAN
STANDARDS FOR NURSERY STOCK, 1986 EDITION,
AS SET FORTH BY AMERICAN ASSOCIATION OF
NURSERYMEN.
7. PLANTS AND ALL OTHER MATERIALS TO BE STORED
ON SITE WILL BE PLACED WHERE THEY WILL NOT
CONFLICT W/ CONSTRUCTION OPERATIONS AND AS
DIRECTED BY LANDSCAPE ARCHITECT.
8. ALL LANDSCAPE PLANTINGS SHALL BE GUAR-
ANTEED FOR A PERIOD OF ONE YEAR FOLLOWING
FINAL INSPECTION BY LANDSCAPE ARCHITECT. AT THE
END OF THIS PERIOD, PLANT MATERIAL TERMED DEAD
OR UNSATISFACTORY BY LANDSCAPE ARCHITECT SHALL BE
REPLACED AT NO ADDITIONAL. CHARGE BY THE
LANDSCAPE CONTRACTOR.
9. LAWNS SHALL BE SEEDED FOLLOWING SCARIFYING,
FINAL GRADING, FERTILIZING, AND RAKING.
LAWN SHALL BE FERTILIZED W/ 12 -12 -12 ANALYSIS
FERT. AT A RATE OF 10Ibs. /1000s.f.AND LIME
APPLIED AS DICTATED BY SOILS TEST PRIOR TO
SEEDING. LAWNS TO BE SEEDED W/ MECHANICAL
SPREADER AT A RATE OF 5lbs. /1000s.f. APPLY
SEED 1/2 ONE DIRECTION AND 1/2 PERPENDICULAR
TO THE FIRST. LIGHTLY RAKE, ROLL W/ 200Ibs.
ROLLER,AND APPLY HYDROMULCH (NO STRAW MULCH)
AFTER SEEDING.
PLANTING NOTES
10. THE LANDSCAPE CONTRACTOR SHALL OBTAIN AND
PAY FOR ALL PERMITS AND FEES THAT MAY BE
REQUIRED FOR HIS PORTION OF WORK.
11. PEATMOSS TO BE USED ON PROJECT SHALL BE
DOMESTIC OR IMPORTED MATERIAL, CHOCOLATE
BROWN IN COLOR AND COMPOSED OF PARTIALLY
DECOMPOSED VEGETABLE MATERIAL. PEAT MOSS
TO BE MILDLY ACIDIC IN CHARACTER AND SHALL
BE APPROVED BY LANDSCAPE ARCHITECT.
12. LANDSCAPE CONTRACTOR SHALL NOTIFY LASNDSCAPE
ARCHITECT IN WRITING PRIOR TO BID DATE OF ANY
PLANTS HE /SHE FEELS MAY NOT SURVIVE IN LOCATIONS
NOTED ON PLANS.
13. ALL DISTURBED LAWN AREAS SHALL BE SEEDED
OR SODDED AS NOTED. PERMANENT SEEDED LAWNS
AND SODDED LAWNS SHALL BE SEED MIX AS APPROVED
BY LANDSCAPE ARCHITECT. SEED MIX SHALL CONSIST OF
34 POUNDS WABASH OR BARON KENTUCKY
BLUEGRASS, 20 POUNDS PARK KENTUCKY
BLUEGRASS, 10 POUNDS PENNLAWN FESCUE
AND 26 POUNDS CERTIFIED FINE BLADED
PERENNIAL RYEGRASS.
14. ALL LAWNS SHALL BE GUARANTEED TO HAVE A FULL
UNIFORM STAND OF ACCEPTABLE GRASS AT THE END
OF THE ONE YEAR GUARANTEE PERIOD WITH NO
BARE SPOTS COMPRISING MORETHAN 2% OF ANY
LAWN AREA. ANY AREA SO NOTED WILL BE SEEDED OR
SODDED UNTIL AN ACCEPTABLE STAND OF GRASS IS
ESTABLISHED.
15. ALL LANDSCAPE PLANTINGS TO BE MAINTAINED BY
CONTRACTOR FOR 60 DAYS FOLLOWING FINAL INSPECTION BY
LANDSCAPE ARCHITECT. ALL SEEDED LAWNS SHALL BE MAIN-
TAINED FOR 60 DAYS AND SODDED LAWNS 30 DAYS
FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT
AFTER WRITTEN REQUEST FROM THE LANDSCAPE
CONTRACTOR. MAINTENANCE TO INCLUDE WATERING
WEEDING, CULTIVATING, MULCHING, MOWING, AND
ALL OTHER NECESSARY OPERATIONS REQUIRED FOR
PROPER ESTABLISHMENT OF LAWNS AND PLANTINGS.
15. CONTRACTOR TO SUBMIT UNIT PRICES ON EVERY
TYPE OF WORK AS REQUIRED BY LANDSCAPE ARCHITECT.
16. ALL LAWN AREAS WITHIN LAWN LIMIT LINES TO
RECEIVE 4 -6" APPROVED TOPSOIL PRIOR TO
SEEDING OPERATIONS.
17. BACKFILL FOR TREE PLANTING SHALL BE 75%
APPROVED TOPSOIL AND 25% APPROVED PEAT MOSS.
TOP LAYER OF BACKFILL SHALL BE 100% EXISTING
TOPSOIL.. A 5 -10-5 ANALYSIS SLOW RELEASE
FERTILIZER SHALL BE INCORPORATED INTO BACK-
FILL AT APPROVED RATES.
18. ALL EXISTING TREES TO BE RELOCATED SHALL BE
DIRECT TRANSPLANTED BY A MECHANICAL TREE
SPADE IN A PROPER SIZE AS DETERMINED BY
AMERICAN ASSOC. OF NURSERYMEN STANDARDS
FOR PLANT MATERIAL. ALL TRANSPLANTING OF
TREES SHALL BE DONE DURING THE PROER SEASON
FOR EACH SPECIES. TREES SHALL BE RELOCATED
DIRECTLY TO NEW LOCATIONS OR TO HOLDING AREA
FOR LATER TRANSPLANT FOLLOWING CONSTRUCTION.
FINAL LOCATION AND SIZE ARE NOTED ON PLANS.
ROSTN PREVENrlON
1. INSTALL TEMPORARY RISER ON EXISTING 24" RCP OUTFLOW PIPE AT THE SOUTHEAST CORNER
OF EXISTING POND
2, CONSTRUCT TEMPORARY DIVERSION DITCH AT SOUTH END OF SITE,
3. INSTALL SILT FENCE, EROSION BERMS AND TEMPORARY SEDIMENT TRAPS PRIOR TO ANY
EARTHMOVING ACTIVITY,
4. CLEAR AND GRUB SITE
5. STRIP AND STOCKPILE TOPSOIL (IN DESIGNATED AREA)
6, ROUGH GRADE PHASE AND PHASE AREA
7, SEED PHASE AREA
6. BEGIN EXCAVATION OF RE1EW 10N POND #3 LEAVING BERM BETWEEN EASING POND
9, REPLACE REQUIRED FILL FROM POND TO PAD AREA, BRING PHASE I TO PLAN.
10. CONSTRUCT TEMPORARY ACCESS DRIVE AND LAYDOWN AREA,
11, COMMENCE DE-- WATERING AND FIWNG WEST 1/2 OF EXISTING POND.
12, CONSTRUCT RELOCATED INDIANA WATERWAY AND WETLAND AREA FROM DOWNSTREAM END AND
INSTALL CHECK DAMS,
13. CONSTRUCT PONDS AND #2, USING POND #2 AS A TEMPORARY SEDIMENT BASIN
AND INSTALL TEMPORARY INLET PROTECTION AROUND STRUCTURE IN POND #2,
14. SHAPE PARKING LOT, BUILDING PAD AND CONSTRUCT DRAINAGE INFRASTRUCTURE,
15. SEED ROUGH GRADED AREAS THAT %ILL NOT BE PAVED.
16.INSTALL INLET PROTECTION WHEN EACH STRUCTURE IS INSTALLED.
17, REPLACE TOPSOIL UPON COMPLETION OF ROUGH GRADING, FINE GRADE TO PLAN ELEVATIONS,
18, FINAL SEEDING SHOULD BE INSTALLED AS SOON AS POSSIBLE AFTER FINAL GRADING,
IT IS RECOMMENDED THAT NO MORE THAN SEVEN DAYS PASS BEFORE FINAL SEEDING HAS
BEGUN.
19, REMOVAL OF TEMPORARY EROSION CONTROL DEVICES SHALL FOLLOW THE GUIDELINES
OUTLINED IN "EROSION CONTROL MAINTENANCE" PROCEDURES HEREON.
SHEET
REVISIONS
O PRE -BID SET
ISSUE DATE
0 POST BID SET
ISSUE DATE
C -605
CSI PROJ. #00 --113