Loading...
HomeMy WebLinkAbout036-01 C-201 Paving Plan4 4 e ir" AV EN A .`1 AP/ Arare, rAlr% FM SERV =FM "Are ■VS' py :m707 re, Mil k SIIM VP7 Agfir, AMY N 4207 *VI I STV „r 'Yr ZANY 'W Afar 1 UMW r ri A ro ril r rr I 40201%" PAO/ WM/ sr Are At-TM k‘W Mir AM/ ""a■D_D ttc N .S\X -4:cx \VW\ A .7■%. -im& X Nk. Mk. kVX NN.N•LN.N. X m:kx N A X mh,xx XM:■%. ."4 \WC\ .■■■■X. A ■X. XVI\ XV:.■ mft, 1 1\X NW7L. Ail xx XSVV. At2 \NM. X --NN-N,w X•■■■ NNII■ it\ mft, X".\\X NINW. X:MN.■ AO% NXN\ Nk. ZAV LN.. xv,..■%1 k■.\ IS A xxx `MILVS NiN\XW 4, XXX MEEK, INNED„\ 4■11 RP-RAP 146th STREET FUTURE RETAIL ASPHALT TRAFF. SIGNAL POST ATTACHED CAMERA (TYP.) TRAFF. HANDHOLE 41b General Site Work Notes and Specifications 1. The Contractor shall be responsible for obtaining or verifying that all permits and approvals have been filed for and are valid and in—force from the respective city, county, state, and federal agencies prior to starting construction. 2. It shall be the Contractors responsibility to determine the exact location of all existing utilities in the general project area prior to beginning construction. 3. it shall be the Contractors responsibility to notify and coordinate all construction with respective utility companies. 4. It shall be the responsibility of the Contractor to maintain quality control throughout the duration of construction. Failure to do so may result in the engineer requiring that the defective work be removed and replaced. 5. All work will be performed in accordance with these plans and specifications. Any and all changes to these plans and specifications ll be approved by the engineer in writing or said changes will be subject to removal and replacement aI:. no cost to the developer. 6. The contractor shall be responsible for verification of all plan quantities and plan dimensions as shown herein. 7. Occupational Safety and Health Administration (OSHA) S for Excavation, Final Rule 29 CFR Part 1926, Subpart "P" applies to all excavations exceeding five (5) feet in depth. 8. Any trench excavations exceeding twenty (20) feet in depth shall require a trench safety system that has been designed and/or approved in writing by a registered professional engineer. NORTH GRAPHIC SCALE 60 120 240 IN FEET 1 inch 60 ft. SITE NOTES 0 ASPHALT PARKING LOT TO BE STRIPED WITH 4 WIDE PAINTED WHITE LINES AS INDICATED. CONCRETE PAVED AREAS TO BE PAINTED YELLOW. PAINT SHALL BE SHER1MN lifiLL/AMS "PROMAR TRAFFIC MARKING". 2) CONTRACTOR SHALL COORDINATE AND COMPLY WITH ALL UTILITY COMPANIES INVOLVED IN PROJECT AND PAY ALL REQUIRED FEES AND COSTS. .3) ALL DIMENSIONS ARE TO BACK OF CURB UNLESS OTHERWISE NOTED. 4) ALL RADII SHALL BE 4' UNLESS OTHERIMSE NOTED. 5) ALL CONCRETE SIDEWALKS AND APRONS SHALL RECEIVE EXPANSION JOINTS AT 25'-0" 0.C. UNLESS OTHERWISE NOTED. Light Duty Asphalt Pavement 110#/Syd. #11 Bituminous Surface (1" Thick) 220#/Syd. #8 Bituminous Binder (2" Thick) 6" #5,3 Type "0" Compacted Aggregate Sub-grade to be compacted to 100% Max. Dry Density to a depth of 18 inches Heavy Duty Asphalt Pavement 110#/Syd. ill Bituminous Surface (1" Thick) 330#/Syd, #8 Bituminous Binder (3" Thick) 10" #53 Type "0" Compacted Aggregate Sub-grade to be compacted to 100% Max. Dry Density to a depth of 18 inches Heavy Duty Concrete Pavement 8" Portland Cement Concrete Pavement 4,000 P.S.I. Strength 28 days Sub-grade to be compacted to 100% Max. Dry Density to a depth of 18 inches SHEET CS1 PROJ. #00-113