HomeMy WebLinkAbout036-01 C-202 Phase I - Site Utilitiesi
N
0
0
0
0
LANDSC
Str. 6
Str. #15
UC
Roof Drains typ.
GAS METER ON
OUTS/DE OF BUILDING
W/BOLLARDS
CUSTONFR 1OAwINA CANOPY
10 "0 for Downspouts
STARIN*. AREA
ELECTRIC
TRANSFORMER PAD
GENERATOR 90
15 "0 P. V.C. for Downspouts
FIRE MAIN TO BE STUBBED ONE
FOOT ABOVE FINISHED FLOOR
OF SPRINKLER ROOM
E./ ZONE S
112 114
BACKFLOW PREVENTION DEI4CE
TO BE LOCATED IN SPRINKLER ROOM
FIRE DEPT.
CONNECTION KNOCK BOX
METER FOR 2" DOMESTICRFCFMN.. AR
IN BREAK ROOM
APPWNCE ELECTRONI
116
Cleanout
$FAS nNA1
CPI AY AREA
Cleanout
OPFN AREA
1
Str. #33\
Str. #31
RE TEN TI ON
POND 1
Str. #34
Str. #35
6" PVC Conduit Str. #29
s"SS
Str. #28
Cleanout
EDGE OF CANO
Str. #10
Str.#18
Str. ;2
Str. #36
Str. #37
DE TEN TI ON
POND 2 Str. #21
2U'0TILI TY
1�.
LIMITS OF SITE
CONTRACT
ROADWAY BY OTHERS
Str. #39
"Holey Mole) says
"DON'T DIG BLIND"
i
emewomo
1
Call Monday through Friday -7 AM to 6 PM
1 -800- 382 -5544 1-800- 428 -5200
Within Indiana Outside Indiana
PER INDIANA STATE LAW IS -89 -1991, IT IS
AGAINST THE LAW TO EXCAVATE WITHOUT
NOTIFYING THE UNDERGROUND LOCATION SERVICE
TWO (2) WORKING DAYS BEFORE COMMENCING WORK.
1
PHASE 1 i
Str. #13
tr #14
1
1 I
cs)
SADDLE TAP REQUIRED
=,Str. #17
.02
146th STREET
DRY TAP REQUIRED
2" DOMESTIC
WA
SADDLE TAP REQUIRED
2 x 190 Ift, 30"0 RCP
FUTURE RETAIL
NOTES:
FOR MORE DETAILED INFORMATION ON
PLAN, PROFILE INVERTS SEE SHEET
FOR MORE DETAILED INFORMATION ON
PLAN, PROFILE INVERTS SEE SHEET
DLUGE
SANITARY
NO. C -500
STORM SEWER
NO. C -400 TO C-402
111 PHASE 1
PHASE 2
Str. #38
STUB AT RIGHT-
OF-WAY LINE
UTILITY PLAN NOTES
UTILITY DESIGN BASED ON INFORMATION SUPPLIED FROM
SCHIEMER ENGINEERING CORPORATION'S "LOCATION
ANALYSIS REPORT DATED JUNE 13, 2000.
UTILITIES WILL BE CONSTRUCTED FOR BOTH PHASES
DURING THIS CONSTRUCTION
"Ir
ALL STORM DRAINAGE UTILITIES SHALL BE EXTENDED
TO WITHIN 5' OF BUILDING PAD.
1.) SEE ARCHITECTURAL PLUMBING PLANS FOR PLUMBING DETAILS TO
AREAS FIVE (5) FEET OUTSIDE AND INSIDE OF THE PROPOSED
STRUCTURE
2.) LOCATION OF SITE UTILITIES SHALL BE VERIFIED WITH PROPER
UTILITY COMPANY PROVIDING SERVICE.
3.) UTILITY CONTRACTOR SHALL PROVIDE 2' X 2' X 8" THICK CONCRETE
APRON AT ALL CLEANOUTS OUTSIDE OF BUILDING.
4.) UTILITY CONTRACTOR WILL BE RESPONSIBLE FOR ALL TAP AND TIE
ON FEES REQUIRED, AS WELL AS COST OF UNDERGROUND SERVICE
CONNECTIONS TO THE BUILDING.
5.) ELECTRICAL SERVICE TO PAD MOUNTED TRANSFORMER SHALL BE
RUN UNDERGROUND, FROM ROAD RIGHT -OF -WAY TO TRANSFORMER
LOCATION. ASSOCIATED COST BY UTILITY CONTRACTOR.
6.) UTILITY CONTRACTOR SHALL FURNISH (2) 4" TELEPHONE
CONDUIT(S) AS SHOWN ON PLAN VERIFY LOCATION OF TIE IN AT
TELEPHONE COMPANIES SERVICE LINE. PROVIDE NYLON PULL CORD
INSIDE CONDUIT.
WATER MAINS
1.) ALL WATER MAINS SHALL BE DUCTILE UCTILE CAST IRON PRESSURE PIPE
WITH MEGA LUGS ON ALL MECHANICAL JOINTS.
2. PIPE SHALL CONFORM TO ANSI A -21.51 OR AWWA C -151 AND AT A
MINIMUM SHALL BE PRESSURE CLASS 350.
3.) FITTINGS FOR DUCTILE CAT IRON PRESSURE PIPE SHALL BE DUCTILE
CAST IRON AND CONFORM TO ANSI A -21.10 OR AWWA C -110 AND SHALL
HAVE A THICKNESS CLASS OF 53.
4.) FITTINGS FOR 4 -INCH TO 12 -INCH SHALL BE CAST IRON (PUSH -ON TYPE
OR MECHANICAL JOINT) AND CONFORM TO ANSI OR AWWA.
5.) PIPE AND FITTINGS 3" AND SMALLER TO BE EITHER P.V.C. SCHE. 40
W /SOLVENT WELD JOINTS OR SOFT K- COPPER.
6.) ALL WATER MAINS SHALL HAVE A MINIMUM COVER OF 48" ABOVE
TOP OF PIPE.
7.) THE MINIMUM HORIZONTAL SEPARATION BETWEEN THE CLOSEST
TWO POINTS OF THE WATER AND SEWER LINE IS TEN FEET (10 THE
MINIMUM VERTICAL SEPARATION BETWEEN THE CLOSEST TWO
P. NTS IF T W R kD S R NE I EIG EE NCH S (1:"
8.) THRUST BLOCKS SHALL BE PROVIDED AT ALL BENDS, TEES, AND FIRE
HYD NTS (DRY BLO KS ON! Y, 0 PO RED ONC'ETE)
9.) DIMENSIONS SHOWN ARE TO CENTERLINE OF PIPE OR FITTING.
10.) ALL SPRINKLERS, DOMESTIC AND SANITARY LEADS TO BUILDING
SHALL END AS SHOWN ON PLAN AND SHALL BE PROVIDED WITH A
TEMPORARY PLUG AT END (FOR OTHERS TO REMOVE AND EXTEND AS
N CESS•RY
11.) ALL FIRE HYDRANTS SHALL BE PROVIDED WITH AN APPROVED GAT
VALV A M XIM OF 5' -0" ROM HYD NT 'ND B NDE
To
TO
E.
12.) ALL WATER MAINS SHALL BE HYDROSTATICALLY TESTED AND
DISINFECTED BEFORE ACCEPTANCE. SEE SITE WORK
SPECIFICATIONS.
13.) ALL GATE VALVES SHALL BE PROVIDED WITH A ROADWAY SCREW
TYPE CAST IRON VALVE BOX. BOXES FOR VALVES 3" AND SMALLER
SHALL HAVE ARCH BASE.
14.) VALVES 3/4" THROUGH 3" SHALL BE BRONZE WEDGE TYPE GATE
VALVE. VALVES SHALL HAVE NON- RISING STEM WITH SOLID TEE
HEAD OPERATING NUT.
15.) VALVES 4" AND LARGER SHALL BE CAST IRON WITH PARALLEL
DOUBLE DISC GATE VALVE. VALVES SHALL HAVE MECHANICAL JOINT
ENDS AND NON- RISING STEM WITH SQUARE OPERATING NUT.
16.) ALL TRENCHING, PIPE LAYING, AND BACKFILLING SHALL BE IN
ACCORDANCE WIT FEDERAL OSHA REGULATIONS.
17.) SEE SITE SPECIFICATIONS SITE UTILITIES" FOR BACKFILLING AND
COMPACTION REQUIREMENTS.
18.) UTILITY CONTRACTOR SHALL HAVE APPROVAL OF ALL GOVERNING
AGENCIES HAVING JURISDICTION OVER THIS SYSTEM PRIOR TO
INSTALLATION.
19.) ALL WORK OF THIS PLAN SHALL BE DONE IN STRICT ACCORDANCE
WITH SITE WORK SPECIFICATIONS.
20.) REFER TO SHEETS FP -1 FP -2 FOR LOCATION AND DETAIL OF FIRE
LINE LEAD IN.
21.) WATER AND SEWER LINE AS- GUILTS SHALL BE SUBMITTED TO CARMEL
UTILITIES PRIOR TO TURNING WATER LINES ON.
LEGEND
-EX W- Exist, Water Line
EX_G Exist. Gas Line
EX_UGT- Exist. Underground Telephone Line
EX_UGE- Exist. Underground Electric Line
-w� Prop. Water Line
-G- Prop. Gas Line
UGT- Prop. Underground Telephone Line
UGE- Prop. Underground Electric Line
-ss- Prop. Sanitary Sewer Line
Sanitary Sewer Manhole
Fire Hydrant
r T Prop. Hydrant
Prop. 90 Elbow
�4 e Prop. 45 Elbow
Prop. Valve
0
23
SEWER PIPE
NORTH
1.) ALL SEWER PIPE SHALL BE PVC PIPE MIN. SDR 35.
2.) FOR PIPE 15- INCHES DIAMETER AND SMALLER: PIPE, FITTINGS, AND
JOINTING SYSTEMS SHALL CONFORM TO ASTM D-3034 EXCEPT THAT
THE STANDARD DIMENSION RATIO OF THE OUTSIDE DIAMETER OF
THE PIPE TO WALL THICKNESS SHALL NOT EXCEED 35.
3.) FOR PIPE 18- INCHES DIAMETER AND LARGER: PIPE, FITTINGS, AND
JOINTING SYSTEMS SHALL CONFORM TO ASTM F -679 WITH A T -1 WALL
THICKNESS.
4.) JOINT SYSTEMS SHALL BE ELASTOMERIC SEAL (GASKET) TYPE. SEALS
SHALL CONFORM TO ASTM F -477 REQUIREMENTS. JOINT MATERIALS
AND TESTING SHALL CONFORM TO ASTM 0 -3212 REQUIREMENTS.
5.) ALL SERVICE CONNECTIONS SHALL BE MADE USING A WYE AND BEND.
TEES SHALL BE USED ONLY AS DIRECTED BY THE CITY. TEES AND
WYES SHALL BE DIE CAST OR FACTORY FABRICATED. ALL SERVICE
PIPE SHALL BE SDR 35.
6.) CONNECTIONS TO EXISTING PIPING SHALL BE MADE USING FLEXIBLE
REPAIR COUPLINGS BY FERNCO OR EQUIVALENT.
ALL WATER MAIN AND SEWER PIPING SHALL BE TESTED IN ACCORDANCE
WITH INDIANA CODE AND IDEM REGULATIONS.
AIR PRESSURE ACEPTANCE TEST
1.) CONTRACTOR SHALL PERFORM AN AIR PRESSURE TEST ON ALL
GRAVITY SEWER PIPE IN ACCORDANCE WITH ASTM F -1417
SPECIFI CATIONS.
2.) THE CONTRACTOR SHALL FURNISH ALL EQUIPMENT, MATERIALS,
LABOR, AND CONDUCT THE TEST UNDER OBSERVATION OF CITY
PERSONNEL.
3.) TEST METHOD:
A.) LOW PRESSURE AIR TEST METHOD SHALL BE THE TIME
PRESSURE DROP METHOD. THE PRESSURE USED IN THE
TEST SHALL BE THE STATED PRESSURE GREATER THAN
THE AVERAGE BACK PRESSURE OF ANY GROUND WATER
ABOVE THE PIPE
B.) THE TIME REQUIRED FOR THE PRESSURE IN THE TEST
SECTION TO DROP 1.0 PSIG SHALL BE MEASURED USING A
STOPWATCH. IF THE TIME EXCEEDS THE TIME
DETERMINED FROM ASTM F -1417 THE SECTION FAILS.
FORCE MAIN AND WATER MAIN PRESSURE AND LEAKAGE TESTS
1.) CONTRACTOR SHALL FURNISH ALL EQUIPMENT, LABOR, AND
MATERIALS NECESSARY FOR THE HYDROSTATIC PRESSURE AND
LEAKAGE TEST ON ALL MAINS UNDER THE SUPERVISION OF THE CITY
PERSONNEL.
2.) TESTS PRESSURE SHALL BE 100 PSI OR 150% OF NORMAL PIPE
OPERATING PRESSURE, WHICH EVER IS GREATER.
3.) LEAKAGE TEST PRESSURE SHALL NOT BE LESS THAN THE MAXIMUM
OPERATING PRESSURE OF THE PIPE. THE DURATION OF THE LEAKAGE
TEST SHALL NOT BE LESS THAN TWO HOURS. ALLOWABLE LEAKAGE
SHALL NOT EXCEED 9 GAL /IN OF PIPE DIAMETER PER MILE OF PIPE IN
24HR.
DEFLECTION TEST OF PVC SEWER PIPE
1.) VERTICAL RING DEFLECTION BEFORE FINAL ACCEPTANCE OF
SEWER LINES, ALL SECTIONS OF SEWER PIPE 8- INCHES AND LARGER
SPECIFIED DIAMETER SHALL BE MEASURED FOR VERTICAL RING
DEFLECTION BY THE CONTRACTOR AND WITNESSED BY THE CITY.
MAXIMUM DEFLECTION UNDER FULL LOAD SHALL NOT EXCEED 5% OF
THE ASTM DESIGNATED AVERAGE INSIDE DIAMETER AS DETERMINED
BY THE LABORATORY FOR THE SPECIFIED PIPING.
2.) FAILURES SHOULD A PIPE EXCEED THE ALLOWABLE DEFLECTION,
THE CONTRACTOR SHALL REPLACE THOSE PIPES AND RETEST THE
SECTION.
3.) EQUIPMENT TESTING SHALL BE GO -NO -GO PULL THROUGH GAUGES
OF A TYPE APPROVED BY THE CITY. A METAL OR PLASTIC GAUGING
RING OF DIAMETER EQUAL TO 95% OF THE SPECIFIED AVERAGE
INSIDE PIPE DIAMETER SHALL BE WITH EACH GAUGE.
4.) THE CONTRACTOR SHALL FURNISH TESTING EQUIPMENT AND
PERSONNEL AND PERFORM THE REQUIRED TESTS. TESTS MUST BE
WITNESSED BY CITY PERSONNEL.
5.) USE OF MECHANICAL PULLING DEVICES IS NOT PERMITTED.
6.) DEFLECTION TESTING SHALL NOT BE PERFORMED UNTIL THE
COMPLETED AND ACCEPTED TRENCH BACKFILL HAS BEEN IN PLACE
FOR AT LEAST 30 DAYS
1.) CONCTRACTOR TO VERIFY PROPOSED GAS PIPING IS SIZED TO MEET
2 PSIG INTIAL PRESSURE WITH LESS THAN 10% PRESSURE DROP PRIOR
TO INSTALLATION. COORDINATE METER PRESSURE REQUIREMENTS WITH
LOCAL SERVING UTILITY.
GA
GRAPHIC SCALE
50 180
200
DATE
12/12
No i
gat, 8206
s
�4
6
s
i
s
i .mss
7!".1t14 wa4 7 rt
ak. eel
SHEET
REVISIONS
o PRE -BID SET
ISSUE DATE
POST BID SET
ISSUE DATE
z
J
wo
y U Z
DESCRIPTION
ADD GNRL. NOTES /VALVES
0
O 0
O CO
co
ti CO
4 3. I LL
Q
r e
W
0 �ot
W r
bb vas
hS
c
Eco
0
O N
co co Q)
•'ra1ro
CJ 0
c._ 1 Lt) O
LO
N N
N
Iii ui v
O O N.�iN
h c x
o
o
c o
I
F- W I w
CO c V)<
Z Y I^-
W W
CY U p (t)
C -202
0
IN FEET)
1 inch 50 ft. CSI PROJ. #00 -113