Loading...
HomeMy WebLinkAbout036-01 C-203 Phase I - Site Grading Plan5' TALL LL tat =821.30 =823.50 823.00 rc=822.04 r 4 El TRENCH DRAIN, 181 El SEE PLUMING A.•r avait uceriazir BC=82 .5a TC =24.00 BC=823.50 \T =82 .60 TC =824.08 i23 68 TC=823.60 1� TQE 2326 =822.31 Tc :2330 821.96 BC=821.73 TC=823.62 6C .823.12 =822.84 BC= 821.46 TC=821.23 824.0 ii0 _mon :"_._1._ 442 Lf 15 "m RCP ®O.fi09 Airr AdeIiAT4r hill +1.►11.is ier:►17iii Pii: ►iisi .rl!s►ll, e>.[r c 7411%/211121111511►ri. iii.>.i Cl e nout TC=823.62 BC =822.96 8C= 821.61 BC =821.46 823.0 TC=823 55 Er TC=823.62 BC=823.12 WISER i BC=82312 1.0 RCP 821.0 TC= 822.45 NSPOUT N AR PING, ,S SEE PL :•NG NSPOUT (Ds.) DI U PIPING, SEE KU SHEETS a s TC=823.85 TC=821.3 :ate 31►1 TC=820.1 BC =819.6 BC=820 TC=823.62 C=822.04 821.72 TOP O BF AN 11, \V4i 1\° 822.92 TC =82.04 TC=823.00 TC=823.60 BC=823.10 0.209 822.0 821.72 BC,822.90 11v Ai AIM% air umetrls» .y i n. rinrsm• nri atirrj a TC= 822.22 1111117j CELEnt larEELEF TC =823.3 BC=822. C=823.00 TC BC= 821.46 TC=822.40 TC=823. X40_ Curb is Level around Pond IIIIIIIIIIIIIIIMIIIIIIILIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIKV li ;I. p: r iP: VAL.'/S O •'���riG..�F mac' 16 jrznP7-7- 9 0_ 133 Lit 15 4 219 4 Lit I r r th X41 824 44 Cft r r �rCI1nS S t i 7l 7V MN EMI t24 „t.0 r',rte.� In Alta PIM imume \:a1 P LNNC /E RONIC! �N= 1U11 1rar�l /1L NIM. 'tom IIIIIIIIIIIMIN!• i 1 0 0°' OM �.SI•I l.f�+.t,s, t, /�I�..i 11 1 1 1 1 1 rums ::rrrr NINE MSA= ums. ..-R I: l■;• 1 II 4 row ••tSaN 2 x 90 1ft. 30 RCP 0 0 0 R w (1) z tr.#32 146th STREET 22 0 TURE ETAIL la 50 0 25 50 TRAFFIC HANDHOLE 824•P 8270 26.0 825.0 IN FEET 1 inch 50 ft. L 100 7 GRAPHIC SCALE z 0 w cp z 200 NORTH A.D.S.-N12 MFRD. BY ADVANCED DRAINAGE SYSTEMS, INC. 3300 RIVERSIDE DRIVE, COLUMBUS, OHIO 43221 (614) 457 -3051 OR LANE ENTERPRISES, INC. 34 STROHM ROAD SHiPPENSBURG, PA 17257 (717) 532 -5959 ,General Site Work Notes and Specifications 1. The Contractor shall be responsible for obtaining or verifying that all permits and approvals have been filed for and are valid and in -force from the respective city, county, state, and federal agencies prior to starting construction. 2. I t shall be the Contractors responsibility to determine the exact location of all existing utilities in the general project area prior to beginning construction. 3. It shall be the Contractors responsibility to notify and coordinate all construction with respective utility companies. 4. It shall be the responsibility of the Contractor to maintain quality control throughout the duration of construction. Failure to do so may result in the engineer requiring that the defective work be removed and replaced. 5. All work will be performed in accordance with these plans and specifications. Any and all changes to these plans and specifications shall be approved by the engineer in writing or said changes will be subject to removal and replacement at no cost to the developer. 6. The contractor shall be responsible for verification of all plan quantities and plan dimensions as shown herein. 7. Occupational Safety and Health Administration (OSHA) Standards for Excavation, Final Rule 29 CFR Part 1926, Subpart "P" applies to all excavations exceeding five (5) feet in depth. 8. Any trench excavations exceeding twenty (20) feet in depth shall require a trench safety system that has been designed and /or approved in writing by a registered professional engineer. 9. Phase 2 area to be rough graded and seeded per grading and erosion control plans. General Site Grading Notes 1. All grades at boundary sholl meet existing grades. 2. Topsoil shall be placed in mounding areas and nonstructural fill areas. Upon completion of mass earthwork, topsoil shall be spread to a depth of four to six (4 to 6) inches in areas to be seeded such as lake slopes, mound areas, areas between curb and clearing limits, and all disturbed areas outside of building and parking areas, extra topsoil shall be disposed of offsite. 3. Straw bale dams, sediment pits and silt fences shall be utilized to control erasion. See erosion control plan for additional information. 4. Existing utility locations are approximate, contractor to field verify horizontal and vertical locations prior to major earthwork, within the proposed construction limits. 5. The intent of these plans is to use all fill material onsite. 6. Building pod and pavement areas designated for fill shall be constructed of suitable f ;11 material and compacted per specifications. All fill areas for building areas, pavement areas and streets are to be stripped of topsoil prior to placement of fill. 7. Contractor shall preserve existing trees wherever possible. Owner and owner's representative shall be consulted for clearing limits. Clearing limits shall consist of all trees within street areas, utility installation limits and cut fill areas. 8. Topograprtc and planimetric information was provided by P.1. Cripe, Inc. Any discrepancies shall be reported to the engineer. 9. After permits have been obtained erosion control measures installed, the contractor shall grade building pad, garden center aprons to a tolerance of +0.1 ft. of subgrade as per division 2 compaction specifications. 10. Immediately apply compact stone base for building pad to a tolerance of -L0.04 (1/2') of the concrete subgrade as per division 2 specifications. Stone shall be applied prior to excavating interior perimeter footings. 11. Compact maintain 30,000 sq.ft. of 6" thick stone material Iaydown area 25 foot wide gravel access road to building. Laydown area to be located by Lowe's project manager. 12. All existing structures, unless otherwise noted to remain, fencing, trees, etc., Within construction area shall be removed disposed of off site. Any burning on site shall be subject to local ordinances Lowe's specifications. 13. Contractor shall notify all utility companies having underground utilities on site or in right -of -way prior to excavation. Contractor shall contact utility locating company and locate all utilities prior to grading start. 14. Site grading shall not proceed until erosion control measures have been installed. 15. All concrete pipes shall be in accordance to astm -c -76 class III. 16. All drainage structures shall be pre -cast. 17. All drainage structures and storm sewer pipes shall meet heavy duty traffic (h20) loading and be installed accordingly. 18. SICP Smooth Interior Corrugated Plastic Pipes fittings may be utilized for pipe sizes 12" or smaller, from the following manufacturers: OR "SURE LOCK" MFRD. BY HANCOR INC. 401 ALIVE STREET FINDLAY, OH. 45840 1- 888 -FOR -PIPE SiCP shall be installed per manufacturer's guideline for heavy duty drainage applications. C:\ 00_SITE' ,LOWESV.._23_00\ 9926GRD REVISIONS 0 A DATE DESCRIPTION 12/12 ADDED NOTE #9 E c) AN N o. ?e r i 18206 I t's..; STATE :::c.:‘,,, •rrrrrrrrrs A r 5 /2- I Ws 5' TALL LL tat =821.30 =823.50 823.00 rc=822.04 r 4 El TRENCH DRAIN, 181 El SEE PLUMING A.•r avait uceriazir BC=82 .5a TC =24.00 BC=823.50 \T =82 .60 TC =824.08 i23 68 TC=823.60 1� TQE 2326 =822.31 Tc :2330 821.96 BC=821.73 TC=823.62 6C .823.12 =822.84 BC= 821.46 TC=821.23 824.0 ii0 _mon :"_._1._ 442 Lf 15 "m RCP ®O.fi09 Airr AdeIiAT4r hill +1.►11.is ier:►17iii Pii: ►iisi .rl!s►ll, e>.[r c 7411%/211121111511►ri. iii.>.i Cl e nout TC=823.62 BC =822.96 8C= 821.61 BC =821.46 823.0 TC=823 55 Er TC=823.62 BC=823.12 WISER i BC=82312 1.0 RCP 821.0 TC= 822.45 NSPOUT N AR PING, ,S SEE PL :•NG NSPOUT (Ds.) DI U PIPING, SEE KU SHEETS a s TC=823.85 TC=821.3 :ate 31►1 TC=820.1 BC =819.6 BC=820 TC=823.62 C=822.04 821.72 TOP O BF AN 11, \V4i 1\° 822.92 TC =82.04 TC=823.00 TC=823.60 BC=823.10 0.209 822.0 821.72 BC,822.90 11v Ai AIM% air umetrls» .y i n. rinrsm• nri atirrj a TC= 822.22 1111117j CELEnt larEELEF TC =823.3 BC=822. C=823.00 TC BC= 821.46 TC=822.40 TC=823. X40_ Curb is Level around Pond IIIIIIIIIIIIIIIMIIIIIIILIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIKV li ;I. p: r iP: VAL.'/S O •'���riG..�F mac' 16 jrznP7-7- 9 0_ 133 Lit 15 4 219 4 Lit I r r th X41 824 44 Cft r r �rCI1nS S t i 7l 7V MN EMI t24 „t.0 r',rte.� In Alta PIM imume \:a1 P LNNC /E RONIC! �N= 1U11 1rar�l /1L NIM. 'tom IIIIIIIIIIIMIN!• i 1 0 0°' OM �.SI•I l.f�+.t,s, t, /�I�..i 11 1 1 1 1 1 rums ::rrrr NINE MSA= ums. ..-R I: l■;• 1 II 4 row ••tSaN 2 x 90 1ft. 30 RCP 0 0 0 R w (1) z tr.#32 146th STREET 22 0 TURE ETAIL la 50 0 25 50 TRAFFIC HANDHOLE 824•P 8270 26.0 825.0 IN FEET 1 inch 50 ft. L 100 7 GRAPHIC SCALE z 0 w cp z 200 NORTH A.D.S.-N12 MFRD. BY ADVANCED DRAINAGE SYSTEMS, INC. 3300 RIVERSIDE DRIVE, COLUMBUS, OHIO 43221 (614) 457 -3051 OR LANE ENTERPRISES, INC. 34 STROHM ROAD SHiPPENSBURG, PA 17257 (717) 532 -5959 ,General Site Work Notes and Specifications 1. The Contractor shall be responsible for obtaining or verifying that all permits and approvals have been filed for and are valid and in -force from the respective city, county, state, and federal agencies prior to starting construction. 2. I t shall be the Contractors responsibility to determine the exact location of all existing utilities in the general project area prior to beginning construction. 3. It shall be the Contractors responsibility to notify and coordinate all construction with respective utility companies. 4. It shall be the responsibility of the Contractor to maintain quality control throughout the duration of construction. Failure to do so may result in the engineer requiring that the defective work be removed and replaced. 5. All work will be performed in accordance with these plans and specifications. Any and all changes to these plans and specifications shall be approved by the engineer in writing or said changes will be subject to removal and replacement at no cost to the developer. 6. The contractor shall be responsible for verification of all plan quantities and plan dimensions as shown herein. 7. Occupational Safety and Health Administration (OSHA) Standards for Excavation, Final Rule 29 CFR Part 1926, Subpart "P" applies to all excavations exceeding five (5) feet in depth. 8. Any trench excavations exceeding twenty (20) feet in depth shall require a trench safety system that has been designed and /or approved in writing by a registered professional engineer. 9. Phase 2 area to be rough graded and seeded per grading and erosion control plans. General Site Grading Notes 1. All grades at boundary sholl meet existing grades. 2. Topsoil shall be placed in mounding areas and nonstructural fill areas. Upon completion of mass earthwork, topsoil shall be spread to a depth of four to six (4 to 6) inches in areas to be seeded such as lake slopes, mound areas, areas between curb and clearing limits, and all disturbed areas outside of building and parking areas, extra topsoil shall be disposed of offsite. 3. Straw bale dams, sediment pits and silt fences shall be utilized to control erasion. See erosion control plan for additional information. 4. Existing utility locations are approximate, contractor to field verify horizontal and vertical locations prior to major earthwork, within the proposed construction limits. 5. The intent of these plans is to use all fill material onsite. 6. Building pod and pavement areas designated for fill shall be constructed of suitable f ;11 material and compacted per specifications. All fill areas for building areas, pavement areas and streets are to be stripped of topsoil prior to placement of fill. 7. Contractor shall preserve existing trees wherever possible. Owner and owner's representative shall be consulted for clearing limits. Clearing limits shall consist of all trees within street areas, utility installation limits and cut fill areas. 8. Topograprtc and planimetric information was provided by P.1. Cripe, Inc. Any discrepancies shall be reported to the engineer. 9. After permits have been obtained erosion control measures installed, the contractor shall grade building pad, garden center aprons to a tolerance of +0.1 ft. of subgrade as per division 2 compaction specifications. 10. Immediately apply compact stone base for building pad to a tolerance of -L0.04 (1/2') of the concrete subgrade as per division 2 specifications. Stone shall be applied prior to excavating interior perimeter footings. 11. Compact maintain 30,000 sq.ft. of 6" thick stone material Iaydown area 25 foot wide gravel access road to building. Laydown area to be located by Lowe's project manager. 12. All existing structures, unless otherwise noted to remain, fencing, trees, etc., Within construction area shall be removed disposed of off site. Any burning on site shall be subject to local ordinances Lowe's specifications. 13. Contractor shall notify all utility companies having underground utilities on site or in right -of -way prior to excavation. Contractor shall contact utility locating company and locate all utilities prior to grading start. 14. Site grading shall not proceed until erosion control measures have been installed. 15. All concrete pipes shall be in accordance to astm -c -76 class III. 16. All drainage structures shall be pre -cast. 17. All drainage structures and storm sewer pipes shall meet heavy duty traffic (h20) loading and be installed accordingly. 18. SICP Smooth Interior Corrugated Plastic Pipes fittings may be utilized for pipe sizes 12" or smaller, from the following manufacturers: OR "SURE LOCK" MFRD. BY HANCOR INC. 401 ALIVE STREET FINDLAY, OH. 45840 1- 888 -FOR -PIPE SiCP shall be installed per manufacturer's guideline for heavy duty drainage applications. C:\ 00_SITE' ,LOWESV.._23_00\ 9926GRD