HomeMy WebLinkAbout036-01 C-206 Erosion Control - Preliminary0
co
Temporary Access Drive All weather surface 24 foot typical width
EN Q
P
1
5� P,
EXIST. 12" RC
W /END SECTION
INV. EL. 809.25 (IN)
AREA OF RELOCATED INDIANA
WATERWAY AND WETLANDS
EXIST 24" RCP
W /END SECTION
INV. EL. 809.12
(OUTLET)
INSTALL TEMP. RISER
SEE DETAIL SHEET NO. C -603
EXIST. 24" RCP
NV. EL. SECTION (IN)
fkON__
TOP SOIL STORAGE AREA
0
l AREA OF RELOCATED INDIANA
WATERWAY AND WETLANDS
80
nstall Temp, Gate
(See Specifications)
0 40 80
LEGEND
GRAPHIC SCALE
180
IN FEET
1 inch 80 ft.
—EX_W— Exist. Water Line
—EX_G— Exist. Gas Line
EX_UGT— Exist. Underground Telephone Line
EX_UGE— Exist, Underground Electric Line
NOTES: FOR EROSION CONTROL QUAN TIN TY SUMMARY
SEE SHEET C -605
FOR SEQUENCE OF CONSTRUCTION OPERATIONS
SEES ET -605
ADDITIONAL EROSION CONTROL MEASURES
MAYBE REQUIRED BY FIELD INSPECTOR
AS CONDITIONS WARRANT
O
EROSION CONTROL LEGEND
cZ instaii erosion control blanket on all slope areas greater than 4:1
and in ditch channels,
Install seeding per Seeding Chart on all areas not to be
immediately paved
SF Install Silt Fencing where indicated
(i/nstc,ll erosion /silt barriers around inlets,
0 1,800 sq. ft. (min,) Temporary Sediment Trap Req d,
Install Temporary Sediment Basins
°Install Temporary Diverson Ditch where indicated
®InstaII Temporary Riprap Check Dam 500' oa
Install Laydown Area and Construction Entrance
(6 #2 Coarse Aggregate)
380 /Syd. QC /QA HMA Base (3" Thick) on
9" Comp. Agg. Base, Type "0 No. 53
320
SEQUENCE OF CONSTRUCTION OPERA TIONS EROSION PREVENTION 0
1, INSTALL TEMPORARY RISER ON EXISTING 24" RCP OUTFLOW PIPE AT THE SOUTHEAST CORNER
OF EXISTING POND
2. CONSTRUCT TEMPORARY DIVERSION DITCH AT SOUTH END OF SITE.
3, INSTALL SILT FENCE, EROSION BERMS AND TEMPORARY SEDIMENT TRAPS PRIOR TO ANY
EARTHMOVING ACTIVITY.
4. CLEAR AND GRUB SITE
5. STRIP AND STOCKPILE TOPSOIL (IN DESIGNATED AREA)
6. ROUGH GRADE PHASE I AND PHASE II AREA
7, SEED PHASE II AREA
8, BEGIN EXCAVATION OF RETENTION POND #3 LEAVING BERM BETWEEN EXISTING POND
9. REPLACE REQUIRED FILL FROM POND TO PAD AREA, BRING PHASE I TO PLAN.
10. CONSTRUCT TEMPORARY ACCESS DRIVE AND LAYDOWN AREA.
11. COMMENCE DE- WATERING AND FILLING WEST 1/2 OF EXISTING POND,
12. CONSTRUCT RELOCATED INDIANA WATERWAY AND WETLAND AREA FROM DOWNSTREAM END AND
INSTALL CHECK DAMS.
13, CONSTRUCT PONDS #1 AND #2, USING POND #2 AS A TEMPORARY SEDIMENT BASIN
AND INSTALL TEMPORARY INLET PROTECTION AROUND STRUCTURE IN POND #2.
14. SHAPE PARKING LOT, BUILDING PAD AND CONSTRUCT DRAINAGE INFRASTRUCTURE,
15. SEED ROUGH GRADED AREAS THAT WILL NOT BE PAVED.
16.INSTALL INLET PROTECTION WHEN EACH STRUCTURE IS INSTALLED.
17. REPLACE TOPSOIL UPON COMPLETION OF ROUGH GRADING. FINE GRADE TO PLAN ELEVATIONS.
18. FINAL SEEDING SHOULD BE INSTALLED AS SOON AS POSSIBLE AFTER FINAL GRADING,
IT IS RECOMMENDED THAT NO MORE THAN SEVEN DAYS PASS BEFORE FINAL SEEDING HAS
BEGUN.
19, REMOVAL OF TEMPORARY EROSION CONTROL DEVICES SHALL FOLLOW THE GUIDELINES
OUTLINED IN "EROSION CONTROL MAINTENANCE" PROCEDURES HEREON,
REVISIONS
O PRE -BID
ISSUE
L POST
SET
DATE
BID SET
DATE
ISSUE
DATE
DESCRIPTION
12/12
O
ADD G.N. /REV. SEQ.
".;vgiT F
r
a:o. 4
?of w
18206 I,
11:.96% STATE OF c
V 9.► 4 r
i DIAL q p
1
s--
0
U
O
0
Q
L.L
0
co
Temporary Access Drive All weather surface 24 foot typical width
EN Q
P
1
5� P,
EXIST. 12" RC
W /END SECTION
INV. EL. 809.25 (IN)
AREA OF RELOCATED INDIANA
WATERWAY AND WETLANDS
EXIST 24" RCP
W /END SECTION
INV. EL. 809.12
(OUTLET)
INSTALL TEMP. RISER
SEE DETAIL SHEET NO. C -603
EXIST. 24" RCP
NV. EL. SECTION (IN)
fkON__
TOP SOIL STORAGE AREA
0
l AREA OF RELOCATED INDIANA
WATERWAY AND WETLANDS
80
nstall Temp, Gate
(See Specifications)
0 40 80
LEGEND
GRAPHIC SCALE
180
IN FEET
1 inch 80 ft.
—EX_W— Exist. Water Line
—EX_G— Exist. Gas Line
EX_UGT— Exist. Underground Telephone Line
EX_UGE— Exist, Underground Electric Line
NOTES: FOR EROSION CONTROL QUAN TIN TY SUMMARY
SEE SHEET C -605
FOR SEQUENCE OF CONSTRUCTION OPERATIONS
SEES ET -605
ADDITIONAL EROSION CONTROL MEASURES
MAYBE REQUIRED BY FIELD INSPECTOR
AS CONDITIONS WARRANT
O
EROSION CONTROL LEGEND
cZ instaii erosion control blanket on all slope areas greater than 4:1
and in ditch channels,
Install seeding per Seeding Chart on all areas not to be
immediately paved
SF Install Silt Fencing where indicated
(i/nstc,ll erosion /silt barriers around inlets,
0 1,800 sq. ft. (min,) Temporary Sediment Trap Req d,
Install Temporary Sediment Basins
°Install Temporary Diverson Ditch where indicated
®InstaII Temporary Riprap Check Dam 500' oa
Install Laydown Area and Construction Entrance
(6 #2 Coarse Aggregate)
380 /Syd. QC /QA HMA Base (3" Thick) on
9" Comp. Agg. Base, Type "0 No. 53
320
SEQUENCE OF CONSTRUCTION OPERA TIONS EROSION PREVENTION 0
1, INSTALL TEMPORARY RISER ON EXISTING 24" RCP OUTFLOW PIPE AT THE SOUTHEAST CORNER
OF EXISTING POND
2. CONSTRUCT TEMPORARY DIVERSION DITCH AT SOUTH END OF SITE.
3, INSTALL SILT FENCE, EROSION BERMS AND TEMPORARY SEDIMENT TRAPS PRIOR TO ANY
EARTHMOVING ACTIVITY.
4. CLEAR AND GRUB SITE
5. STRIP AND STOCKPILE TOPSOIL (IN DESIGNATED AREA)
6. ROUGH GRADE PHASE I AND PHASE II AREA
7, SEED PHASE II AREA
8, BEGIN EXCAVATION OF RETENTION POND #3 LEAVING BERM BETWEEN EXISTING POND
9. REPLACE REQUIRED FILL FROM POND TO PAD AREA, BRING PHASE I TO PLAN.
10. CONSTRUCT TEMPORARY ACCESS DRIVE AND LAYDOWN AREA.
11. COMMENCE DE- WATERING AND FILLING WEST 1/2 OF EXISTING POND,
12. CONSTRUCT RELOCATED INDIANA WATERWAY AND WETLAND AREA FROM DOWNSTREAM END AND
INSTALL CHECK DAMS.
13, CONSTRUCT PONDS #1 AND #2, USING POND #2 AS A TEMPORARY SEDIMENT BASIN
AND INSTALL TEMPORARY INLET PROTECTION AROUND STRUCTURE IN POND #2.
14. SHAPE PARKING LOT, BUILDING PAD AND CONSTRUCT DRAINAGE INFRASTRUCTURE,
15. SEED ROUGH GRADED AREAS THAT WILL NOT BE PAVED.
16.INSTALL INLET PROTECTION WHEN EACH STRUCTURE IS INSTALLED.
17. REPLACE TOPSOIL UPON COMPLETION OF ROUGH GRADING. FINE GRADE TO PLAN ELEVATIONS.
18. FINAL SEEDING SHOULD BE INSTALLED AS SOON AS POSSIBLE AFTER FINAL GRADING,
IT IS RECOMMENDED THAT NO MORE THAN SEVEN DAYS PASS BEFORE FINAL SEEDING HAS
BEGUN.
19, REMOVAL OF TEMPORARY EROSION CONTROL DEVICES SHALL FOLLOW THE GUIDELINES
OUTLINED IN "EROSION CONTROL MAINTENANCE" PROCEDURES HEREON,