Loading...
HomeMy WebLinkAbout4 BRK A20.pdf 12/21/10 Burks Residence 2011 Burning Tree Lane Carmel, IN 46032 Issues: Sheet No.: Sheet Contents: Plotted: Checked By: Drawn By: Commission No. 10-0708 SLS JJI 12/21/10 1:07 PM Copyright © 2010 RWA Architects, Inc. All rights reserved. RWA Architects, Inc. 2771 Observatory Avenue Cincinnati, Ohio 45208 Office: 513-321-9506 Fax: 513-321-9507 J.I TECT HCRA STATE OF IDN I ANA TERED S IGER NHOJ I SCH No. 9400134 S Toe kick S Toe kick S Toe kick S Toe kick S Toe kick S Toe kick S Toe kick S Toe kick S Toe kick Toe kick S Toe kick S 9'-8" 37'-0" 16'-0" 10" 1'-10" 10'-8" 1'-10" 10" 88'-2" 4'-0" 23'-0" 18'-0" 28'-8" 14'-6" 8" 21'-8" 8" 3'-2" 10" 14'-0" 10" 27'-0" 10" 41'-8" 13'-8" 26'-0" 2'-0" 2'-2 1/2" 9'-3" 2'-2 1/2" 2'-6 1/2" 9'-3" 2'-6 1/2" 1'-2" 10" 31'-0" 10" 20'-4" 47'-6" 44'-0" 3'-6" 10" 13'-3" 13'-1" 16'-0" 10" 8'-0" 100'-8" 48'-0" 4'-1 5/8" 11'-8 7/8" 4'-1 5/8" 8'-0" 4'-0" 16'-0" 10" 3'-3 5/8" 10" 10" 3'-2" 10" 10" 14'-0" 7'-4" 1'-0" 13'-0" 1'-0" 10" 10" 19'-8" 15'-0" 3'-4" 37'-0" 7'-0" 2'-0" 1'-0" 10" 10" 10" 10" 2" 8" 3'-2" 17'-2" 17'-6" 17'-10" 31'-11" 14'-7" 13'-6" 13'-6" 6" 3'-8" 10'-0" 2'-8" 6" 17'-2" 5'-0" 7'-4" 3'-8" 15'-11" 1'-2" 8" 16'-4" 3'-0" 8" 13'-0" 1'-2" 4" 6" 13'-8" 9'-10" 2'-5" 9'-3" 4" 6" 6" 4" 5 1/2" 5 1/2" 9'-8 1/2" CL door 8'-10 1/2" 3 1/2" 3 1/2" 8'-10 1/2" 4" 6'-8 1/2" 5 1/2" CL door 19'-0" 14'-8" 6" 4" 2'-0" 100'-8" 8" 3'-0" 8" 8"6" 4" 3'-6" 18'-8" 14'-0" 2'-8" 6" 6" 8" 8" 2'-7 5/8" 19'-3" 4" 2" 2" 2'-7 5/8" 6'-5 5/8" 10" 4" 6" 8" 4'-0" 4'-0" 10" 9'-0" 10" 10" 10" 10" 10" 1'-0" 1'-0" 3'-3 5/8" 2'-7 5/8" 3'-8" 10" 3'-0" 4" 8" 13'-0" 20'-0 1/4" 6" 4" 2'-9 3/4" Basement and A2.0Structure Review: 09/20/10 Unfinished Basement 001 Stair 114 Basement/Foundation Plan General Notes: A. Contractor shall adjust framing layout to accommodate light fixtures, plumbing fixtures, and HVAC supply and return locations. Coordinate with electrical plans. B. Pressure treated lumber shall be used at all locations where wood is in contact with concrete. C. Refer to Electrical Plans for smoke detector locations. D. Install Smoke Detectors (110 V hardwired with battery backup) per all applicable codes. E. All elevations are relative to First Floor Subfloor of 100'-0". F. Control joints shall be spaced at 15'-0" max. and shall have a max. aspect ratio of 1.5 : 1. G. Provide sound batt insulation in all interior stud & floor spaces @all toilet, mechanical, office & bedroom spaces -typ. Refer to Specs. H. Provide pressure reduction valve where water line enters house. Basement/Foundation Plan Drawing Notes: 1. Beam: W10x22 -dropped. 2. Post: 3 1/2" O.D. sch. 40 steel column. 3. Footing: 3'-0" x 3'-0" x 1'-0" w/(4) #4 bars each way 3" from bottom. 4. Footing: 4'-0" x 4'-0" x 1'-0" w/(6) #4 bars each way 3" from bottom. 5. Beam: (3) 1 3/4" x 9 1/2" LVL -flush. 6. Not Used. 7. 11 7/8" I-joists @16"o.c., max. continuous. 8. Beam: W10x22 -dropped. Align w/wall above. 9. CMU fireplace foundation, fully grouted. 10. Footing: 4'-8" x 9'-4" x 1'-0" w/#4 bars @12" O.C. each way (mid-depth). 11. Beam Pocket. See specs. 12. 12. Header: (3) 2 x 10 -flush. 13. Concrete slab on grade above -See Building Sections. 14. Beam: (2) 1 3/4" x 9 1/2" LVL -flush. 15. Simpson LUS410 Joist Hanger 16. Beam: (2) 1 3/4" x 9 1/2" LVL -flush. 17. 36" W. x 24" H. crawl space access panel. 18. Refer to fireplace drawings for hearth slab framing above. Maintain 2" min. clear to combustible materials. 19. Beam: W8x18 -dropped. 20. Beam: W8x18 -dropped. 21. Grade beam. 22. Step footing. 23. Ash dump door, see specs. Slope bottom toward door. 24. Shaded area represents extent of sound batt insulation. Refer to Specs for typical locations. 25. Review plumbing manifold layout w/Owner & Architect prior to rough plumbing. 26. Raise top of slab for level floor @Room 115 above. 27. Wine Room conditioner location. Refer to Interior Elevations. 28. Wide footing location @unbraced wall. See 2/A5.0. 29. (2) #5 bent bars @top & bottom of shallow wall corners (12" & 48" legs) -typ. 30. Beam: (2) 1 3/4" x 9 1/2" LVL -flush. 31. Beam: (2) 1 3/4" x 9 1/2" LVL -flush. 32. Header: (2) 1 3/4" x 9 1/2" LVL -flush. 33. Beam: (2) 1 3/4" x 9 1/2" LVL -flush. 34. Coordinate HVAC grille locations w/floor framing layout. 35. Core or cast hole in foundation wall as required to accommodate duct for closet -coordinate location in field. 36. Not Used. 37. Tops of joists are @lower elevation from adjacent joists to allow for stone flooring. T/WallElev: 100'-0" T/WallElev: 98'-10" T/Grade BeamElev: 98'-10" T/WallElev: 99'-0 1/2" T/WallElev: 98'-10" 1 11 13 19 11 11 7 13 30 12 17 22 15 14 7 1 2 4 16 7 15 7 18 109 1 2323 31 88 7 7 7 7 523 13 21 20 11 11 2A4.0 DS DS DS DS DS DS DS DSDS DS DS 1A4.2 T/WallElev: 98'-7" Basement/Foundation PlanScale: 1/4"=1'-0" 1A2.0 1A4.0 UP 16R 42 12 17 23 24 Mechanical Room 002 Wine Storage 003 002-A 003-A FD FD FD 25 tile conc. 2A4.2 6A5.1 2A5.0 1A5.0 sim. Crawl Unexcavated 2A4.1 26 7 27 28 28 28 28 28 28 29 29 29 29 1 1 16 15 15 31 42 23 23 33 33 32 1A4.1 T/WallElev: 98'-10" T/WallElev: 98'-10" 7 T/WallElev: 98'-4 1/2" DS DS DS DS HVAC #1 WH sump sump Foundation Plan 11 11 T/WallElev: 98'-10" T/WallElev: 98'-7" T/WallElev: 98'-7" T/Joist LedgeElev: 98'-7" T/WallElev: 100'-0" T/Brick LedgeElev: 99'-0 1/2" T/WallElev: 100'-0" T/Brick LedgeElev: 99'-0 1/2" T/WallElev: 100'-0" T/WallElev: 98'-10" T/WallElev: 99'-0 1/2" 35 22 22 22 37 21 3 A7.0 1 2 SD 0' 4' 8' 16' N n o r t h 3A5.0 24 T/WallElev: 98'-4 1/2" T/WallElev: 98'-4 1/2" T/WallElev: 98'-4 1/2" 34 34 34 34 34 34 34 34 34 34 34 34 34 34 34 34 34 34 34 34 34 34 34 13 slope 24 24 3A4.1 Permit Set: 10/25/10 Pricing Set: 11/12/10 1 1 32 33 1 34 34 1 1 1 1 1 1 1 1 1 1 1 Rev. 1 Set: 12/20/10 1