Loading...
HomeMy WebLinkAbout5 BRK A21.pdf 12/21/10 Burks Residence 2011 Burning Tree Lane Carmel, IN 46032 Issues: Sheet No.: Sheet Contents: Plotted: Checked By: Drawn By: Commission No. 10-0708 SLS JJI 12/21/10 1:07 PM Copyright © 2010 RWA Architects, Inc. All rights reserved. RWA Architects, Inc. 2771 Observatory Avenue Cincinnati, Ohio 45208 Office: 513-321-9506 Fax: 513-321-9507 J.I TECT HCRA STATE OF IDN I ANA TERED S IGER NHOJ I SCH No. 9400134 S Toe kick S Toe kick S Toe kick S Toe kick S Toe kick S Toe kick S Toe kick S Toe kick S Toe kick Toe kick S Toe kick S 6" 9'-8" 4 3/8" 4 3/8" 1'-1 5/8" 1'-1 5/8" 20'-0 3/8" 14'-3 1/4" 100'-8" 9'-0" 37'-4" 16'-0" 2'-0" 10" 1'-10" 5'-4" 1'-10" 10" 87'-9" 28'-8" 14'-1" 3'-2" 12'-11 1/2" 5'-0 1/2" 6" 6" 6" 9'-7 1/2" 3'-6 1/2" 5'-1" 14'-11" 7'-8" 3 1/2" 47'-6" 44'-0" 3'-6" 10" 10" 4" 6" 6" 4" 4'-6" 4'-6" 5'-4" 48'-0" 4'-7 1/4" 10'-9 1/2" 4'-7 1/4" 8'-0" 4'-0" 16'-0" 10 1/2" 3'-8 3/4" 2'-3 5/8" 3'-1 1/8" 3'-1 1/8" 2'-3 5/8" 3'-9 1/4" 10" 4'-0" 4'-0" 10" 3'-2" 10" 7'-2" 7'-2" 10" 4" 6 1/2" 6" 4" 6" 4" 4" 6" 4" 6" 14'-4" 2'-11" 3'-7" 3'-7" 2'-11" 3 1/2" 3 1/2" 16'-8" 2'-4 1/2" 11'-7" 5 1/2" 15'-4" 1'-8" 3'-8 1/2" 3 1/2" 6'-6" 6'-6" 13'-0" 7'-4" 4'-4" 3 1/2" 12'-8 1/2" 2'-0" 5 1/2" 11'-3" 3 1/2" 8'-4" 8'-6" 2'-3" 3 1/2" 17'-4 3/4" 2'-1" 3 1/2" 5'-6 3/4" 10'-10 3/4" 5'-4 3/4" 2'-9" 6'-0"6" 1'-10" 9'-4 1/2" 4'-9 1/2" 4'-9 1/2" 8'-2" 3 1/2" 9'-6" CL window CL window 3'-0" 6'-3 1/2" CL door CL window CL CL window window CL window CL window 2'-0" 2'-0" CL 14'-4" 3 1/2" 3'-8 1/2" 2'-3" 5 1/2"4'-2 1/2" CL 1'-7 1/4" 4'-9 3/4" 3'-1" 7'-6" 4'-10" 3'-2" 4" 6" 6'-0" 17'-8" 3 1/2" 1'-10" 3'-3" 3 1/2" 5 1/2" 2'-2" 1'-10" CL window CL window CL window CL window CL window CL window CL window CL window CL window CL window CL window CL window 1'-0" 6" 4" 4" 6" 6" 4" 1'-11 3/4" 1'-11 3/4" 8'-1" 3'-5" 2'-1" 3 1/2" 4'-0" 5 1/2" 2'-10" 2'-6" 3 1/2" 2'-11 1/2" 3 1/2" 6'-10" 3 1/2" 3'-0" 3 1/2" 4'-0" 3 1/2" 5'-0" 9'-9 3/4" 3 1/2" 3'-10 1/2" 3 1/2" 2'-5" 4'-4" 3 1/2" 2'-0" 3'-5" 3'-2" 3'-2" 3'-11" 3'-5" 6" 4" 10" 4'-0" 1'-0 3/4" 6" 6" 3'-4" 6" 6 3/4" 7'-1 1/2" 1'-0 1/2" 4 3/8" 4'-0 3/8" 6" 4" 3'-2" 3'-2" 2'-2 1/2" 1'-9" 5'-4 3/4" 2'-0" 2'-0" 5 1/2" 13'-0 1/2" 5 1/2" 15'-9 1/2" 3'-6" 6" 4" 2'-3 5/8" 2'-0" 6'-0" 6'-0" 6" 4" 4" 6" 13'-0" 2'-0" 6" 6'-1 1/8" 6'-1 1/8" 6" 6 1/2" 15'-8 3/4" 3 1/2" 3 1/2" 3 1/2" 3 1/2" 2'-1" 2'-6" CL 10'-11" 4'-5" 6" 5 1/2" 5'-5" 2'-0" 5 1/2" 4'-0" 6" 4" 3'-0" 10" 1'-6" 3'-3" 2'-1" 2'-1" 6'-8" 10'-11 1/2" 2'-5" 3'-6" 7 1/4" 2'-6 3/4" 2'-9 1/2" CL stair hall CL door /window CL window 100'-8" 4'-0" 23'-0" 18'-0" 5 1/2" 5 1/2" 10'-8" 20'-4" 14'-0" 4'-5" 5 1/2" 6'-1 3/4" 3'-0" 3 1/2" 2'-1" 3 1/2" 1'-2" 3 1/2" 2'-6" 2'-0" 10" 11'-0" 11'-0" 6" 6'-4" 7'-5" CL door 6" 41'-8" 13'-8" 26'-0" 2'-0" 2'-4" 9'-0" 2'-4" 2'-8" 9'-0" 2'-8" 9'-0" 2'-8" 1'-8" 4" 10'-2" 10'-2" CL window 10" 1'-6" 1'-4" CL window CL window CL 3'-6" 7'-3" 7'-3" window 3'-6" 6" 4'-2" 3'-10" 3'-11" 4" 6'-6 1/2" 14'-1" 19'-4" 2'-0" 5 1/2" 4'-3" 13'-8" 2'-4" 5 1/2" 3'-2 1/2" 9'-2" 5 1/2" 1'-1" 6'-2" 1'-1" 1'-8" 4'-0" 4'-0" 3 1/2" 2'-11 1/2" 4'-2 7/8" 4'-3 1/4" 9'-8 5/8" 4'-3 3/4" EQ. 'A' EQ. 'A' 1'-0" 5'-0" 6" 3 1/2" 4'-6 1/2" Eq. 8'-1" Eq. 3 1/2" 9'-1" 3 1/2" 6" 4" 6" 4" 105-3 123-A First Floor Plan A2.1 Books Books 4'-0" Dresser Linen Mirror Appliance Garage Linen Entry DN Pantry Buffet /Bookshelf 104 Master Bath 108 Master Closet 110 Stair Hall 113 Stair 114 Kitchen 103 Hall 105 Sun Porch 106 Master Bedroom 107 Laundry 111 Mudroom 112 Water Softener 115 Garage 116 Toilet 109 Foyer 100 Dining Room 101 Living Room 102 Margot's Office 119 Powder 120 Guest Hall 117 Vest. 118 Guest Bath 122 Guest Bedroom 123 107-1 109-1 107-2 108-1 111-1 112-1 114-1 123-1 123-2 123-3 122-1 121-1 119-1 119-2 119-3 119-5 119-4 103-1 102-5 102-4 102-3 102-2 102-1 103-2 103-4 103-3 105-1 105-2 107-A 108-A 110-A 109-A 110-B 111-A 115-A 112-B 112-A 116-A 114-A 104-A 103-B 103-A 100-1 117-A 123-B 122-A 122-B 120-B 120-A 119-A 118-A 119-B 100-A hdwd. tile hdwd. tile tile hdwd. tile cpt. stone hdwd. hdwd. tile103-5 slope 1/8 : 12 First Floor PlanScale: 1/4"=1'-0" 1A2.1 1A4.0 First Floor Floor Plan General Notes: A. Contractor shall adjust framing layout to accommodate light fixtures, plumbing fixtures, and HVAC supply and return locations. Coordinate with electrical plans. B. Install Smoke Detectors (110 V hardwired with battery backup) per all applicable codes. C. See Window and Exterior Door Schedule for designated egress windows. D. All elevations are relative to First Floor Subfloor of 100'-0". E. Refer to structural plans S2.1 for typ. header and post sizes -U.N.O. F. Refer to Interior Elevations for specific blocking locations for coat hooks, towel bars, etc. G. Use tempered safety glass @all doors, sidelites and windows (within 24" of the arc of adjacent door and with a bottom exposed edge of glazing less than 60" above the floor). Use tempered safety glass for all glazing below 18" A.F.F. as well as all shower doors &/or bathing enclosures (or any glazing within 36" horizontal edge of tub or compartment and less than 60" above drain inlet). Refer to Door & Window schedule. H. Provide sound batt insulation in all interior stud & floor spaces @all toilet, mechanical, office & bedroom spaces -typ. Refer to Specs. First Floor Plan Drawing Notes: 1. Verify wall opening dimension w/cabinet supplier. 2. Pull-down attic access stair. See Specs. 3. Drip dry rod. See Interior Elevations. 4. Limestone cap. 5. Coordinate centerline of tub w/filler valve & window treatment. 6. Provide HVAC supply into closet. 7. Flat frame stud walls. 8. Stone paved stoop on concrete slab. 9. Flush hearth. 10. Min. 2" clear between masonry chimney & combustible materials. 11. See detail 7/A5.1 for wall framing notes. 12. Set floor drain below drip dry rack. See Specs. 13. Built-in bench. See Interior Elevations. 14. Wood shelves. See Interior Elevations. 15. Ash dump. See specs. 16. Approx. route of combustion air duct. Coordinate w/Architect. 17. Bench seat. See sheet A7.3. 18. Darker filled walls indicate load bearing condition. 19. Coordinate w/roof framing plan on sheet S2.2 & Building Section. 20. Pad wall out to align with interior. 21. Metal stud framing at fireplace. Refer to section 6/A5.1 22. Gas log lighter. 23. Build low wood shlef in closet just above wall outlets. Coordinate w/Architect. 24. Fill stud spaces w/sound batt insulation between Kitchen & Living Room. See specs. A7.2 10 13 11 12 A7.2 5 A7.1 4 3 1 2 A7.0 9 10 7 A7.1 5 46 A7.0 13 14 A7.016 17 A7.0 15 8 A7.0 6 57 A7.0 12 A7.2 6 9 7 8 8'-0" Vanity 116-3 116-1 116-2 DN (1) 7" R DN (1) 6" R 2A4.0 1A4.2 2A4.2 6A5.1 3A5.0 1A5.0 sim. 2A4.1 1A4.1 1 3 2stone cpt. H.B. H.B. DS DS DS DS DS DS DS DS DS H.B. H.B. DS DS DS DS DS DW 36" Ref. M/W Oven D/W SD SD SD SD SD Arched Overhead Door Arched Overhead Door Arched Overhead Door 5A5.1 7A5.1 1111 5 12 6 13 7 14 14 17 4 106-2 106-5 8 8 34 80 gyp. opening 116 80 gyp. opening 10 15 16 16 9 18 18 18 19 19 0' 4' 8' 16' N n o r t h 2A5.0 sim. H.B. 20 21 21 3A4.1 11 A7.0 A7.2 15 14 Shower 121 22 101-2 DS 101-1 101-3 SD23 106-1 106-6 106-3 24 106-4 Structure Review: 09/20/10 Permit Set: 10/25/10 Pricing Set: 11/12/10 1 1 1 A7.2 1 4 2 3 Rev. 1 Set: 12/20/10 1