HomeMy WebLinkAboutUnited Consulting Addl Serv/ENG/$6,400 United Consulting Engineers Architects
Engineering: Department' 2010
Appropriation #04-13; P.O. #27461
Contract Not To Exceed $6;400.00
ADDITIONAL SERVICES AMENDMENT TO
AGREEMENT. FOR PURCHASE OF GOODS AND SERVICES
APimOV:O AS TO FORM BY_
THIS AMENDMENT TO THE GOODS AND SERVICES AGREEMENT ("Agreement") entered into by and
between the. City of Carmel and United Consulting Engineers Architects (the "Vendor"), as City Contract
#060210.02 shall amend the terms of the Agreement by adding the additional services to be provided by Vendor
consistent with the Scope of Work attached hereto and incorporated herein as Exhibit "A The terms and conditions
of the Agreement shall not otherwise be affected by his Additional Services Amendment and shall remain in full force
and effect
IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment as follows
CITY OF CARMEL, INDIANA UNITED CONSULTING ENGINEERS
ARCHITECTS
by and through its Board of Public
Works and Safety
By: BY:
lei 4
James Brain Presiding Officer Auth• *zed Signet e
Date:
i)A1t L X17 tc H�—
Lai Printed Name
M ..ryAnp :urk Member
Date: -�l p i,i'O`C
Title
;Fe
Lori S. -tse ember FIDiTIN: 35 i 0
Date: 1 1 S t
SSN if Sole Proprietor:
ATTEST:
Date: `)QG 2
aria Cordray, IAMC, Cl ;1 Treasurer
Date: t 1/
(Zl vcd\ mad'Soc. \EaginulmgVA101U)GTED ENG. ARCH AJJdtwlal&moos Ammd./ll.:bc:11/17 /29 3:IU PMQ
1
a n
,,--461
��yy-- v p y� t ypp
r
C 1 November 12, 2010 1 :4 0 ARMEL
JAMES BRAINARD, MAYOR
Mr. Dave Richter, P.E., L.S.
United Consulting Engineers Architects
1625 N. Post Road
Indianapolis, IN 46219 -1995
RE: Additional Service Amendment #1, 2006 Bond PO 27461
Dear Mr. Richter:
As we discussed, the City of Carmel has a need for additional professional services and pursuant to our current
contract with United, Contract #060210.02, dated June 2, 2010, I have requested and received from you the
proposed scope of services and fee estimates for the following work task:
Additional Service Amendment #1— 04 -13; Pedestrian Bridge over Carmel Drive
Construction Inspection Supplement
See "Attachment A" Not to Exceed: $6,400.00
Per our contract procedural requirements, I hereby approve these Additional Professional Services estimates, and
request that the Board of Public Works ratify the above referenced Contract Amendment.
PLEASE NOTE
Please be advised that "Additional Services" performed on City contracts must be billed separately from the original
contract and other additional services. More importantly, the invoice must reference the appropriate Additional
Service and P.O. shown above. Invoices received without the Additional Service referenced will be returned
for proper identification. Thank you for your continued assistance in providing the City of Carmel with your
professional, quality services. If you should have any questions, please give me a call.
Sincerely,
U ■111,...
Michael T. McBride, P.
City Engineer
R- ewed and app .ved by:
S. C. En.' lking
Director of Admini tration
DEPARTMENT OF ENGINEERING
ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317 571 2441 FAX 31 ..l
EMAIL engineerinecar me! .in.gov I 63
AA UNITE
Consulting=
ENGINEERING November 10, 2010
ENVIRONMENTAL
INSPECTION Mr. Michael McBride, P.E.
LAND SURVEYING City Engineer
City of Carmel
PLANNING One Civic.Square
WATER Carmel, IN 46032
WASTEWATER
SINCE 1965 RE: Monon Trail Bridge over Carmel Drive
Supplemental Request
Dear Mr. McBride:
OFFICERS
William E. Hall, P.E.
Dave Richter, P.E., P.L.S. Per our discussion on November 8, 2010, we are requesting additional time to perform the needed
Steven W. Jones inspection for the deck drain system that was added at the final inspection earlier this year. We are
Christopher R. Pope, P.E. requesting this additional funding only as this work was added after the project was finished.
B. Keith Bryant, P.E.
Michael A. Rowe, P.E.
Below is an estimate to complete the inspection of the work in the field and to complete the Change
Order and other records as required by INDOT. We propose to do this work on an hourly basis with a
not -to exceed amount of $6,400.00.
PROFESSIONAL STAFF
Jerry D. Ritchie, P.E.
Andrew T. Wolka, P.E. WNW'S Total
Davin L. Stonier, A.LC.P. Project 4005.0088
Darryl P. Wineinger, P.E.
Adam C. Post, P.E.
Michael S. Oliphant, A.I.C.P. Inspector 2 1
E. Rachelle Pemberton, P.E.
Timothy J. Coomes, P.L.S. :5tr{ps ttnlesjhtp $ALSO SNEAD
Brian W. Craig, P.E.
Jon E. Clodfelter, P.E.
Steven R. Passey, P.E. ;TOIAL
Howard A. Berberick, P.E.
Kurt C. Courtney, P.E.
Brian J. Pierson, P.E. Thank you for your consideration.
Christopher L. Hammond, P.E.
Paul D. Glotzbach, P.E.
Brian S. Frederick, P.E.
Sincerely,
Jay N. Ridens, P.E.
Matthew R. Lee, P.E. United Consulting
William R. Curtis, P.E.
Jeromy A. Richardson, P.E.
John P. Sprague. P.E.
Adam J. Greulich, P.L.S.
Whitney D. Neukam, P.E.
Kelly J. LaVelley, P.E. Brian N. Miller, Manager
Matthew A. Taylor, P.E. Construction Engineering Services
Josh 0. Betz, P.L.S.
1625 N. Post Road Cc: United i08 -314
Indianapolis, IN 46219
Phone: (317) 895-2585
Fax: (317) 895-2596
E -mail: Info @ucindy.com
www.ucindy.com
ga