HomeMy WebLinkAboutCorrespondenceConn, Angelina V From: Mindham, Daren Sent: Thursday, January 20, 2011 10:31 AM To: Conn, Angelina V Subject: RE: Jan. 25 BZA item Pilgrim Lutheran Church I just got a call from Eric at Wiehe and some power lines maybe changed.thatwould affect the landscaping. Plus, he has made at least one change so :that a revised plan is yet to be submitted. Daren Mindham Urban Forester City of Carmel Department of Community Services One Civic Square Carmel, Indiana 46032 Office: 317 -571 -2283 *The true meaning of life is to plant trees, under whose shade you do not expect to sit. Nelson Henderson From: Conn, Angelina V Sent: Thursday, January 20, 2011 9:53 AM To: Mindham, Daren Subject: RE: Jan. 25 BZA item Pilgrim Lutheran Church Thanks! -Angie Conn, Planning Administrator From: Mindham, Daren Sent: Thursday, January 20, 2011 8:11 AM To: Conn, Angelina V; Duncan, Gary R; Littlejohn, David W Cc: 'Greg R. Noyes'; 'David Lucas' Subject: RE: Jan. 25 BZA item Pilgrim Lutheran Church All is good in forestry. Daren Mindham Urban Forester City of Carmel Department of Community Services One Civic Square Carmel, Indiana 46032 Office: 317 571 -2283 From: Conn, Angelina V Sent: Tuesday, January 18, 2011 3:49 PM To: Duncan, Gary R; Littlejohn, David W; Mindham, Daren Cc: 'Greg R. Hoyes'; 'David Lucas' Subject: Jan. 25 BZA item Pilgrim Lutheran Church *The true meaning of life is to plant trees, under whose shade you do not expect to sit. Nelson Henderson 1 Conn, Angelina V From: Greg R. Hoyes Greg .Hoyes @hamiltoncounty.in.gov] Sent: Tuesday, January 18, 2011 4:23 PM To: Conn, Angelina V; Duncan, Gary R; Littlejohn, David W; Mindham, Daren Cc: David E. Lucas Subject: RE: Jan. 25 BZA item Pilgrim Lutheran Church Angie No major BZA issues for us either. We still have some construction issues to work out. but nothing major. es, ae, e i C' 'e Plan Reviewer Hamilton County Surveyor's Office From: Conn, Angelina V f mailto:Aconncarmel.in.govl Sent: Tuesday, January 18, 2011 3:49 PM To: Duncan, Gary R; Littlejohn, David W; Mindham, Daren Cc: Greg R. Hoyes; David E. Lucas Subject: Jan. 25 BZA item Pilgrim Lutheran Church Thank you! Angie Conn, Planning Administrator City of Carmel Planning Zoning Division 1 Gentlemen this item will be at the BZA on Jan. 25. Are there any major outstanding issues that I should add to the dept. report, which will be released this Thursday? The item is: Pilgrim Lutheran Church The applicant seeks the following special use amendment and development standards variance approvals: Docket No. 10110009 SUA Ordinance Chptr 5.02: Church in 5 -1 district Docket No. 10110010 V Ordinance Chptr 5.04.01: maximum building height The 19 -acre site is located at 3650 W. 106` Street and is zoned S1 /Single Family Residential. Filed by Gerald Powell of Pilgrim Lutheran Church of Indianapolis, Inc. Conn, Angelina V From: Duncan, Gary R Sent: Tuesday, January 18, 2011 3:56 PM To: Conn, Angelina V; Littlejohn, David W; Mindham, Daren Cc: 'Greg R. Hoyes'; 'David Lucas' Subject: RE: Jan. 25 BZA item Pilgrim Lutheran Church No comments for the BZA hearing. We are still working through some engineering issues on the construction side of things, but it is headed in the right direction. From: Conn, Angelina V Sent: Tuesday, January 18, 2011 3:49 PM To: Duncan, Gary R; Littlejohn, David W; Mindham, Daren Cc: 'Greg R. Hoyes'; 'David Lucas' Subject: Jan. 25 BZA item Pilgrim Lutheran Church Gentlemen this item will be at the BZA on Jan. 25. Are there any major outstanding issues that I should add to the dept. report, which will be released this Thursday? The item is: Pilgrim Lutheran Church The applicant seeks the following special use amendment and development standards variance approvals: Docket No. 10110009 SUA Ordinance Chptr 5.02: Church in 5 -1. district Docket No. 10110010 V Ordinance Chptr 5.04.01: maximum building height The 19 -acre site is located at 3650 W. 106 Street and is zoned S1 /Single Family Residential. Filed by Gerald Powell of Pilgrim Lutheran Church of Indianapolis, Inc. Thank you! Angie Conn, Planning Administrator City of Carmel Planning Zoning Division 1 Conn, Angelina V From: David E. Lucas David .Lucas @hamiltoncounty.in.gov] Sent: Tuesday, January 18, 2011 3:53 PM To: Conn, Angelina V; Duncan, Gary R; Littlejohn, David W; Mindham, Daren Cc: Greg R. Hoyes Subject: RE: Jan. 25 BZA item Pilgrim Lutheran Church Angie, We continue to coordinate with the Church on the 106 Street and Shelborne Road project. Thanks, Dave From: Conn, Angelina V (mailto:Aconn@carmel.in.Qovl Sent: Tuesday, January 18, 2011 3:49 PM To: Duncan, Gary R; Littlejohn, David W; Mindham, Daren Cc: Greg R. Noyes; David E. Lucas Subject: Jan. 25 BZA item Pilgrim Lutheran Church Gentlemen this item will be at the BZA on Jan. 25. Are there any major outstanding issues that I should add to the dept. report, which will be released this Thursday? The item is: Pilgrim Lutheran Church The applicant seeks the following special use amendment and development standards variance approvals: Docket No. 10110009 SUA Ordinance Chptr 5.02: Church in 5 -1 district Docket No. 10110010 V Ordinance Chptr 5.04.01: maximum building height The 19 -acre site is located at 3650 W. 106 Street and is zoned S1 /Single Family Residential. Filed by Gerald Powell of Pilgrim Lutheran Church of Indianapolis, Inc. Thank you! Angie Conn, Planning Administrator City of Carmel Planning Zoning Division 1 JAMES J. NELSON CHARLES D. FRANKENBERGER JAMES E. SHINAVER LAWRENCE J. KEMPER JOHN B. FLATT FREDRIC LAWRENCE JAMES A. NICKLOY CHRISTOPHER A. FERGUSON Angie Conn City of Carmel One Civic Square Carmel, IN 46032 Dear Angie: NELSON FRANKENBERGER A PROFESSIONAL CORPORATION ATTORNEYS AT LAW 3105 EAST 98TH STREET, SUITE 170 INDIANAPOLIS, INDIANA 46280 PHONE: 317- 844 -0106 FACSIMILE: 317- 846 -8782 January 14, 2011 Re: Pilgrim Lutheran Church 3650 West 106 Street Docket Numbers: 10110009 SUA 10110010 V JANE B. MERRILL, Of Counsel JON C. DOBOSIEWICZ, Land Use Professional RECEIV DOGS Enclosed you will find 9 copies of the informational brochure for the above referenced item to be heard by the Board of Zoning Appeals on January 25, 2011. A CD with a digital copy of the booklet has also been provided. Enclosures Ltr to A Conn 13 011411 Should you have any questions regarding this, please do not hesitate to call. Very truly yours, NELSON FRANKENBERGER, P.C. Jon C. Dobosiewicz Land Use Professional 7 Conn, An elina V From: Sent: To: Subject: Angie, Approval for Pilgrim Lutheran Church from Daren. Thank you, Eric Eric A. Carter, R.L.A., ASLA Project Manager, Commercial Development Weihe Engineers, Inc. 317(846 -6611 weihe.net Daren Mindham Urban Forester City of Carmel Department of Community Services One Civic Square Carmel, Indiana 46032 Office: 317 571 -2283 Eric Carter [cartere @weihe.net] Tuesday, January 11, 2011 10:43 AM Conn, Angelina V FW: Docket No. Assignment: Pilgrim Lutheran Church #10110009 SUA 10110010 V) Original Message From: Mindham, Daren jmailto:dmindham@carmel.in.gov] Sent: Tuesday, January 11, 2011 9:05 AM To: Eric Carter Subject: RE: Docket No. Assignment: Pilgrim Lutheran Church #10110009 SUA 10110010 V) Eric, The plans look good. Please submit a revised set of landscape plans if anything changes. One thing I would like to note is that if a revision is needed, I would like to see some shrubs on the east and west sides of the dumpster which is on the north border to screen the brick structure. *The true meaning of life is to plant trees, under whose shade you do not expect to sit. Nelson Henderson From: Eric Carter fmailto:cartere(&weihe.netl Sent: Monday, January 10, 2011 12:49 PM To: Mindham, Daren Cc: jandlaNF- LAW.COM; gapowell@indy.rr.com; Charlie Frankenberger; Jamie Shinneman; Conn, Angelina V Subject: RE: Docket No. Assignment: Pilgrim Lutheran Church (#10110009 SUA 10110010 V) Daren, See attached revised Landscape Plans. I have addressed the following comments. We are still working with CTRWD on the sanitary sewer location. This might affect locations of some of the trees more than likely. We are also working with IPL on pole relocations. This too might affect tree locations. 1 !NDIANP DEPARTMENT OF COMMUNITY SERVICES January 10, 2011 Mr. Eric Carter Weihe Engineers 10505 College Ave Indianapolis, IN 46280 RE: Pilgrim Lutheran Church Dear Mr. Carter: City of Carmel The following letter represents comments for this project specifically addressing the area of alternative transportation. I have reviewed the drawings submitted on January 10, 2011 and the comments from the alternative transportation review have been satisfactorily addressed. We request that all responses to our comments be provided in writing. Failure to provide written responses may result in delay of the review process. It is critical that this office he made aware of all modification made on the plansbeing re- submitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans indicating all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, Special Studies or other committee meetings. The Department of Community Services reserves the right to provide additional comments based on subsequent reviews. If you have questions, please contact me at 571 -2417. Sincerely, David Littlejohn Alternative Transportation Coordinator Department of Comm unity Services cc: Angie Conn, Department of Community Services Engineering Department Review Project File ONE CIVIC SQUARE Page 1 CARMEL, INDIANA 46032 317/571 -2417 Conn, Angelina V From: Sent: To: Cc: Subject: Attachments: Daren, See attached revised Landscape Plans. I have addressed the following comments. We are still working with CTRWD on the sanitary sewer location. This might affect locations of some of the trees more than likely. We are also working with IPL on pole relocations. This too might affect tree locations. I will get you an updated plan as needed. Thank you, Eric Eric A. Carter, R.L.A., ASLA Project Manager. Commercial Development Weihe Engineers, Inc. 317 1 846 6611 weihe.net Eric Carter [cartere @weihe.net] Monday, January 10, 2011 12:49 PM Mindham, Daren jond @NF- LAW.COM; gapowell @indy.rr.com; Charlie Frankenberger; Jamie Shinneman; Conn, Angelina V RE: Docket No. Assignment: Pilgrim Lutheran Church (#10110009 SUA 10110010 V) 2011 -01 -10 response letter Daren Mindham.pdf; L201 Landscape details and specs.pdf; L102 Landscape Plan 2.pdf; L101 Landscape Plan 1.PDF Original Message From: Mindham, Daren fmailto:dmindham@carmel.in.gov] Sent: Monday, November 22, 2010 1:40 PM To: iond @NF LAW.COM; gapowell @indy.rr.com; Charlie Frankenberger; Jamie Shinneman Subject: Docket No. Assignment: Pilgrim Lutheran Church #10110009 SUA 10110010 V) Jamie, The following email represents comments for this project specifically addressing the area of urban forestry. I have reviewed the drawings and offer the following comments: URBAN FORESTRY REVIEW COMMENTS 1) I would like to have the attached Carmel planting details used in City of Carmel projects. However, the submitted details will suffice. 2) The MaS, PcH and Pn will need to be replaced with different genus'. These are on the Carmel not recommended list. A different variety of crabapple will suffice for the MaP (see approved list attached) I would like to recommend Bald Cypress, White Pine for the other replacements. 3) Is it possible to plant a few bald cypress in between the two pipelines. I think this would add to this desolate area and the overall look of the property. Will this wetland area be left to grow natural? Also see note #4. 1 Conn, Angelina V From: Sent: To: Cc: Subject: Attachments: «2011 -01 -10 response letter David Littlejohn.pdf» «C102 Site Plan.PDF» David, please see attached responses to your comments. Thank you, Eric BE WEIHE ENGINEERS Land 3tenievin��j !Civil Engendering 3nd p€ .As. tecturr fl d r.' idea r.e" Eric A. Carter, R.L.A., ASLA Project. Manager, Commercial Development Weihe Engineers, Inc. 10505 N. College Avenue Indianapolis, Indiana 46280 317 1 846 -661 1 800 1 452 6408 317 1 843 0546 fax weihe.net Eric Carter [cartere @weihe.net] Monday, January 10, 2011 12:53 PM Littlejohn, David W Conn, Angelina V; Jamie Shinneman; Jon C. Dobosiewicz (E -mail) Pilgrim Lutheran Church 2011 -01 -10 response letter David Littlejohn.pdf; C102 Site Plan.PDF This message and any files transmitted with it are confidential, may contain privileged information which is intended solely for the receipt, use and benefit of the intended recipient of this email. If you are not the intended recipient, be advised that dissemination, distribution, printing or copying of this message is strictly prohibited and may result in legal liability on your behalf. If you receive this message in error, or are not the named recipient, please notify the sender at either the email address or telephone number above and delete this email from your computer. Thank you. 1 JAMES J. NELSON CHARLES D. FRANKENBERGER JAMES E. SHINAVER LAWRENCE J. KEMPER JOHN B. FLATT FREDRIC LAWRENCE JAMES A. NICKLOY CHRISTOPHER A. FERGUSON Angie Conn City of Carmel One Civic Square Carmel, IN 46032 (P RE: PLI -Ltr to A Conn 010711 NELSON FRANKENBERGER A PROFESSIONAL CORPORATION ATTORNEYS AT LAW 3105 EAST 98TH STREET, SUITE 170 INDIANAPOLIS, INDIANA 46280 PHONE: 317- 844 -0106 FACSIMILE: 317- 846 -8782 January 7, 2011 Pilgrim Lutheran Church of Indianapolis, Inc. Docket Nos. 10110009 SUA and 10110010 V Carmel BZA scheduled for January 25, 2011 Planning /Zoning Department review comments: \JANE MERRILL, Of Counsel JON C. DOBOSIEWICZ, Land Use Professional Please make checks payable to the City of Carmel. The fees have been paid. Feel free to bring color and material samples to the BZA meeting. Thank you. Below please see the response to the questions included in your review of the above referenced matter dated November 22, 2010. Please provide copies of your correspondence with the TAC members and their correspondence with you. All Correspondence from TAC members has been copied to DOCS via e -mail. Make sure the public notice meeting time to the newspaper and neighbors reads 6 PM. It is suggested to send the notice to the Indianapolis Star newspaper by Noon, two days prior to the printing deadline (317- 444 -7163 or email: publicnotices @indystar.com). Notice has been made and the affidavit will be provided on January 21 Provide a copy of the Official List of Adjacent Property Owners from Hamilton County Auditor's Office from Indianapolis /Marion County. This will be submitted with the proof of publication on January 21 Please provide filled out and notarized Placement of Public Notice Sign affidavit. This will be submitted with the proof of publication on January 21st. PLI Ltr to A Conn 010711 Provide the filled out Petitioner's Affidavit of Notice of Public Hearing form. This will be submitted with the proof of publication on January 21 Provide the filled out Notice of the Public Hearing before the BZA form. This will be submitted with the proof of publication on January 21 Please provide proof of notice from the Indy Star. This will be submitted with the proof of publication on January 21 Please provide green signed return receipts. This will be submitted with the proof of publication on January 21 Side yard building setbacks for a church are 25 -ft, per zoning ordinance chapter 26.02.08. Please add this to the site layout plan sheet C102. This has been updated. Please see sheet C102. Per the C3 Plan, Pedestrian and Bike Plan map, please show /label a 10 -ft wide path along 106 St. (Please work with David Littlejohn, Alternative Transportation Systems Coordinator, on, the details of this.) See sheet C102 for this. The City of Carmel is currently constructing this. Please label the 40 -ft half road right of way along 106 Street. Right now, it is only labeled as 40'. (A 60 -ft proposed r/w is not required, but please verify this with the Carmel Engineering Dept.) 40' is the existing and 50' is proposed. This has been labeled more clearly on sheet C 102. Prepare an estimated construction cost to comply with the Thoroughfare Plan Alternative Transportation Plan; contact the Engineering Dept. for more details. Per a meeting and discussions with Carmel Engineering and confirmed in an e -mail from Gary Duncan, no other improvements are necessary for 106 Street. Do you propose any fencing? If so please provide details on the fence design location. Fencing will be provided around the playground. Details will be added to the plans. Please consider using additional LEED or `green' building practices, such as a white membrane roof, solar panels, skylights, pervious pavers in all or part of the parking area, etc. List is attached. Rain gardens and some native plants are proposed. Please show future parking areas on the landscape plan, too. (The Forestry Dept will review /approve'the landscape plan.) See additional future parking identified on plans. Is there a reason why some of the drive aisle widths within the parking area are 36 -ft wide? Can you reduce them down to 25 -ft wide? Stacking for patron drop off is being provided in this area making it necessary to provide 36 feet. Please label the mechanical equipment locations on the site plan and provide details on how they are screened from view. This includes electric and gas meters. The building is sited in a way that it blocks the view of the gas panels. Landscaping has also been added to screen the mechanicals. In addition screen walls are also being provided. 7°• Ground sign base needs to be landscaped. See sign ordinance chapter 25.07.02 -7. See updated plantings on the Landscape Plan. Please make sure that all exterior light fixtures have flat lenses and 90- degree cut offs, and have shields on the sides that face residential neighborhoods. The photometric plan and fixture cut sheets will show 90- degree cut offs for the parking lot lights. Please provide more detail on the bell tower noise, dB, range, etc. Also, see City Code 6 -158 Noise Regulations for further detail: http: /www.amlegal.com/carmel in/ We have no additional information at this time. No specific system has been selected. We have received the information on the City of Carmel Noise Regulations and will comply with those standards. ,2 You might need to seek a waiver from the Engineering Dept for not having curbs in some of the parking area. See ordinance chapter 27.03. Per Gary Duncan the Engineering Department is satisfied with the elimination of curb in certain limited locations due to this being a result of implementing water quality measures. Please Should you have any questions regarding this, please do not hesitate to call. Very truly yours, NELSON FRANKENBERGER, P.C. Enclosures PLI Ltr lo A Conn 010711 Jon C. Dobosiewicz Land Use Professional January 3, 2011 Mr. David Littlejohn City of Carmel Department of Community Serives One Civic Square Carmel, IN 46032 317 -571 -2417 RE: Pilgrim Lutheran Church Dear Mr. Littlejohn: This letter is in response to your comment email dated December 9, 2010 for the above referenced project. We have prepared the following responses to the plan review comments listed below. Review Comments 1 11 WEIHF, ENGINEERS Land Surveying !Civil F_ngineer Landscape 'Architecture Build will, confidence`." 1. Comment: The City of Carmel Parking Ordinance requires that all developments include bicycle parking at a rate of five (5) bicycle parking spaces per one hundred (100) required automobile parking spaces. Please see the City of Carmel's Parking Ordinance in order to determine appropriate locations, specifications and construction details for the above. Response: Please see Sheet C102 for required bicycle parking. 2. Comment: The Bicycle and Pedestrian Plan requires the construction of a 10' path along 106th St. Please revise the plans to include and label this facility. Response: Please see added path that is currently being constructed by Carmel. 3. Comment: Please consider providing a sidewalk on both sides of the entrance drive. Response: Right now only one sidewalk is being proposed on the West side of the drive. In the future phase, a sidewalk could be installed on the East side. 4. Comment: Please indicate ADA compliant crosswalks at all pedestrian crossings. Response: Please see sheet C102 for ADA crossing locations. Should you have any further questions or requests for additional information pertaining to this project review, please contact me at 317 -846 -6611. Sincerely, G„_< Eric Carter, R.L.A. Project Manager, Commercial Development I -I:\ 2004 \w040542 \docs\Responscs\2011 -01-03 comment letter David Littlejohn.doc Pilgrim Lutheran Church January 3, 2011 Page 2 of 2 Conn, Angelina V From: Conn, Angelina V Sent: Wednesday, December 15, 2010 10:37 AM To: 'Jon Dobosiewicz' Cc: 'Charlie Frankenberger'; Mindham, Daren Subject: Pilgrim Lutheran Church dumpster enclosure Jon I took another look at the dumpster enclosure and while painted split face block is not the number one choice of the department, it is acceptable. Brick, Brick veneer or Quick brick would be better though, if you could please look into using that material instead. And with a second look a t the landscape plan, the dumpster should probably have plantings around its base, for screening. See zoning ordinance chapter 25.01.02.C.2 as a guide. Also, 1 could not find the architectural building elevations for the maintenance shed, but I did see architectural elevations for a chiller enclosure. Thanks, Angie Conn, Planning Administrator City of Carmel Planning Zoning Division Dept. of Community Services 1 Civic Square, 3rd Fir. Carmel, IN 46032 0: 317 571 -2417 I F: 317- 571 -2426 I E: aconn@carmel.in.aov W: www.carmel.in.gov /services /DOCS /DOCSDOPZ.htm Please consider the environment before printing this e -mail 1 December 14, 2010 Mr. Eric Carter Weihe Engineers 10505 North College .Avenue Indianapolis, IN 46280 RE: Pilgrim Lutheran Church Project Review #1 Dear Mr. Carter: JAMES j3RAINARD, IVIAYOR The City received your constructionplans on November 19, 2010: The'project is scheduled for review at the December 15, 20 10 Technical,Advisory Committee meeting. We'offer the following comments: GENERAL INFORMATION 1. These comments represent the "Department of Engineering's first review of the preliminary development plans for this project.. 2. We request that all :responses to our comments be provided in writing and be accompanied by a drawing reflecting the requested revisions. Failure to provide written responses may result in the delay of the review process. 3. It is critical thatthis office be made aware of all modifications made on the plans being re- submitted, particularlyyif any such changes are considered new Or fall outside of our previous reviews Please provide revised plans including all, revisions. Please notify us of any changes and specifically state any changes, includitig resulting from Plan Commission BZA: committee meetings. 4. We have engaged Crossroad Engineers, PC to review all drainage, plans and drainage calculations submitted to this office for review. If you have not`alreadydone so, please provide a set, of drainage plans and calculations to their office-for review. We will share Crossroad's comments as they are received. 5. Final drawings will not be approved for construction until: a. All Engineering Department and Utility Department and Hamilton County Surveyor issues have been resolved. b. All bonds and perforinance guarantees are posted. c. All Board of Public Works and Safety approvals and any other governing agency approvals (if required) are obtained. d. All off -site easements necessary to install utilities to serve the development are secured. e. SWPPP isapproved. f. All fees are paid. 6 The Department reserves the right to provide additional comments based upon subsequent reviews. 7. An approved -Storm Water Management Permit is required prior to commencing any earth disturbing activity. Please contact Mr. John Thomas regarding storm water quality requirements. 8. An approved :right -of -way permit is required prior to commencing work in the public right -of -way. 9. If it will be necessary to relocate existing utilities, the costs for:such relocation shall be borne solely by the developer. Any utility poles requiring relocation shall be relocated to within one -foot of the outside edge of the' proposed right of 10. The Department requires that the construction drawings be developed in with the City of Carmel digital submission standards and that all required submittals for primary plat, DEPAR NIF: r <.)r ENGINt- ERiNc. ON1: Cwic -Sc,n :\RE. C:�k�1i 1. 1N -16032 Orsx:r 317.571.24-41 FA 317.571.2439 EMAIL en neerinOt -car mrl.in i. ov Mr: Eric Carter. December 14, 21110 RE: Pilgrim Lutheran Church Project, Review #1 Page 2 of 4 secondaryplat, and construction:drawings`be made. The digital files must be;subinitted to the Department of Engineering prior to'the approval of the construction plans. Please contact the City GIS Department for the requirements. 11. Jurisdictions: a. The project site is located within current -City of Carmel Corporate Limits,. b. Perimeter Street and Right-of-Way'— City'of Carmel (106 Street) c. Water— City of Carmel Utilities d Sanitary Sewers Clay Township, Regional Waste District e. Storm Sewers/Drainage:— City of Carmel. f Legal`Drains —Hamilton County Surveyor's Office 12 Drawings submitted for approval: a. The design engineer must certify all drawings submitted for final approval.. b. This office will require 9•setsof drawings for approval after all issues have been resolved. The-drawings will be stainped as;approved and signed by the City, Engineer and by Carmel Utilities. The Owner will receive 3: sets, one of which:must he maintained on the construction site atalf times. Ifthis project is subject to review and approval by the Hamilton County Surveyor's Office, a total of 11 sets will be required for final. approval. 13. Carmel Utilities will provide'separate.reviews of this project for water issues: Please assure that copies of all drawings are sent to: Paul Pace Paul Arnone Carmel Utilities Distribution Carmel: Utilities Collection 3450 West 131" Street 901 North Range Line Road Westfield, IN 46074 Caring!, 'IN 46032 14. 'Cannel Utilities subscribes to: "Holey Moley" who should be contacted directly for ail water main,locations.. 1 s: The following items will be sent electronically upon,request this correspondence and project: :a. Project-Approval Checklist b. Performance /Maintenance Guarantees c. Utility Jurisdictions /Right of Way Permits `d. Availability (acreage) Fees BOARD OF PUBLIC. WORKS AND SAFETY 16. A schedule for.Board of Public ;Worts' and Safety meeting dates and agenda deadlines will: be sent electronically for your use upon request: Please use the Engineering•Department deadlines for submissions to the .17. Any stibmissionto the Board requires prtor;a'pprovalby the Carmel Clay Plan Commission and /or the Board Appeals (if applicable) and completion of review by the Technical Advisory Committee: All written requests to be `plaeed.on, the Board's agenda muslin lude: approp_riate:Docket,Number and the. date (or:dates).of approval by the Plan Commission and /or the.Board of Zoning Appeals (if applicable):.. l8: Water Availability and Sanitary`Sewer approval. from the Board will be required. This is an. EDU approval, based upon the propo u of the site Referen Items #33 to' #35 below for additional details!explanations. Please note that if an entryway or:other irrigation system is planned for thi development, additional Water Availability Approval from the Board will he required and additional. Water Connection Fees- will be assessed based upon the size and usage of the as: det e rm ined by the Director of:Carmel :Utilities. 19: Commercial Curb Cut Approval. `Please provide'8' /�'z 1;1 exhibits with,therequest:for approval: Provide ;all pertinent information including lane widths, overall width, radii, lane markings, location of opposing drive s ,'or 'streets, relationship to. the. Ideation of previous curb .cut; etc. iMr. Eric Carter. .December 14,. 2010 RE: Pilgrim Lutheran Church Project Review #1 Page 3 of 4 20. Temporary Construction Entrance Approval. It appears the planned construction entrance is located at the site of a permanent curb cut planned on 106 Street. Therefore, a separate approval from the,Board will not be required. 21. The installation-of any permanent, privately owned and/or maintained improvement (signs. decorative street walls, streetlights, etc.) within dedicated right of way or dedicated easements requires the execution of a Consentto Encroach Agreement between the Owner and the City. of Carmel. Such agreements are executedby Board of Public Works and Safety. 'The`City Engineer mayapprove irrigation system agreements. 22. Secondary Plat approval if applicable. All performance guarantees must be posted prior to submission of secondary plats for Board of Public Works and Safety approval. 23. Dedication ofright -of -way if not platted. This is based upon the City. of Carmel 20 -Year Thoroughfare Plan requirements. Dedication documents are available: upon request: Please be advised that all Right -of- -Way Dedications must be accompanied bya Sales Disclosure Agreement completed by the owner.for the property being dedicated, to the City. The dedication document cannot be recorded without a completed Sales Disclosure. The form is available upon request, 24. Any open paveinehecuts of 106'h Street, other than those required for the curb and median cuts, will require Board approval. BONDING REQUIREMENTS 25. Please contact Mr. Dave•Bartes to review perfonnanceguarantee .requirements. Please contact Mr.. John Duffy to review water and sanitary sewer bonding requirements. 26. The amount of the Perfonmance Guarantee is based upon a certified Engineer's Estimate for 100% of the.costof labor.and.materials to construct the individual improvements, to be provided by'the.design engineer. Please provide detailed Engineer's Estimates for each improvement including quantities, unit costs, pipe sizes,. and materials, etc. 27. Upon completion and :release of individual Performance Guarantees, a three -year Maintenance Guarantee will be required (see Street Sign comments above). The Maintenance Guarantee amount is based upon 15% of the Performance amount for Streets and Curbs and 10 of the Performance amount for all other improvements. 28. Perfonmance.Guarantees may be •Perfornance or Subdivision Bonds or hrrevocable Letters of Credit. 29. Please reference the available enclosures for more detailed explanation of our procedures. RIGHT OF WAY PERMIT AND BONDING 30. Any work in the dedicated right -of -way will require an approved Right-of-Way Permit and a License Permit Bond. 31. The bond amount is determined by our Right -of -Way Manager. However, if work is included•iit the scope of work of a required and posted Performance Guarantee, the Performance Guarantee may be used to satisfy the bond requirements of the Right -of -Way Permit. 32. Please contact our Right of -V,'av Manager, Fred Glaser, to arrange right -of -way permitting and bonding. AVAILABILITY AND CONNECTION FEES 33. We defer to Carmel Utilities regarding this issue: 34. if an entryway or overall site irrigation system is planned for this development, :additional Water Connection Fees will be assessed based upon the and usage of the system and upon the recommendations of the Director of Carmel Utilities. 3S These fees are required: to be paid prior to final approval of construction plans by Engineering' and prior to issuance of building pennits by Building Codes Services. Pease confirm these fees and calculations with Carmel Utilities. Mr. Eric Carter. December 14, 2010 RE: ;Pilgrim Lutheran Church Project Review Page4of4 CONSTRUCTION DRAWING REVIEW COMMENTS 36. General- Comments a. This project is subject to the City's Storm Water Management and Storm Water Quality Ordinances. b: Please add the following note to. the°drawings: "IF IT WILL BE- NECESSARY TO RELOCATE EXISTING UTILITIES, THE EXPENSE OF SUCH RELOCATiON SHALL BE THE RESPONSIBILITY OF THE- DEVELOPER. ALL UTILITY POLES SHALL BE LOCATED WITHIN ONE FOOT OF THE PROPOSED RIGHT -OF- WAY. 37. Please add note stating "NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT" to construction set. 38. All wales on site must have sub surface pipe installed. Pipe to conform to requirements of Storm Water. Technical Standards and shall be double wall, HI -Q pipe. 39. Please omit Sheet L101, Landscape Plan; Sheet L102..Landscape Plan; and Sheet L201, Landscaping Details from construction sets to be submitted for review by this department. The Department of Engineering does not have, approval authority over landscape plans or photometric plans. 40. Sheet C102. a. The word "signs" is misspelled in the note in the lower right corner of the sheet. 41. The width of the entrance does: not comply with the city standard, which is included on sheet C202. Please reduce the width of the entrance to a maximum of30 feet.. If you have questions, please contact me at 571 244.1.. Sincerely, Nicholas J. Redden, P.E. Plan; Review, coordinator Department of Engineering cc: Angelina Conn, Department of Community Services John Duffy, Cannel Utilities Paul Pace, Carmel Utilities Paul Arnone, Carmel Utilities Greg Hoyes: Hamilton County Surveyor's Office Greg ilho; CrossroadEngineers..PC issvrapps\user data\,_: \shrucd \DHI LL\PROJRE VI 0,\PI L(:'e R IMLUTH F RANCH t)RC'HRE V #.1 December 10, 2010 Weihe Engineers ATTN: Eric Carter 10505 North College Avenue Indianapolis, IN 46280 VIA E -MAIL: carterea,weihe.net 7Centon C. `Ward, CYF,'M Surveyor of .Xamilton County (Pho (317) 776 -8495 `Fax (317) 776 -9628 Suite z88 One Jfarnilton County Square ob eiiiiite, 1indiaria 46060-223o RE: Pilgrim Lutheran Church Dear Mr. Carter: We have reviewed the construction plans submitted to the Hamilton County Surveyor's Office on November 19, 2010, for this project and have the following comments: 1. The proposed project falls in the incorporated area and MS4 jurisdiction of the City of Cannel. 2. The proposed project DOES NOT fall in a Carmel Wellhead Protection Zone. 3. The proposed project falls in the Crooked Creek Regulated Drain Watershed. 4. Please submit an outlet permit for the direct discharge to the Crooked Creek Regulated Drain. The application is available on our website at http /www.hamiltoncounty.in.gov /surveyor, under the Forms page. 5. A reconstruction of the English Oak Arms of the Crooked Creek Regulated Drain is currently in the works with the 106' St. and Shelborne Rd. round -a -bout. This is likely to go for a Drainage Board hearing in February and construction will begin in March. Please show these proposed changes, in addition to showing the Carmel path project. The design can be obtained from Jeff Hill at Corradino, having Hamilton County Highway Project Number PR -08 -0002. This may affect the entrance and could cause design changes one or both projects. 6. On sheet L101, the furthest west 2 trees appear to fall in the 75' regulated drain easement and will hamper access to the drain. Please move these trees out of the regulated drain easement. Also show the 75 from TOB RDE on the landscape plans. 7. Please address all comments from Crossroad 8. Please submit final plans and drainage calculations once all TAC review comments have been addressed. 9. Please note that additional comments may be warranted at a later date. Should you have any questions, I can be reached at 317 Sincerely, Greg Hoyes, AC, CFM, CPESC Plan Reviewer CC: Angie Conn Carmel DOCS John Thomas Carmel Engineering Dave Barnes Carmel Engineering Greg Ilko Crossroad Engineers Engineers review letter. 776 -8495. December 9, 2010 Mr. Eric Carter Weihe Engineers 10505 College Ave Indianapolis, IN 46280 RE: Pilgrim Lutheran Church Dear Mr. Carter: ONE CIVIC SQUARE City of Cannel !�rtiaNP% DEPARTMENT OF COMMUNITY SERVICES The following letter represents comments for this project specifically addressing the area of alternative transportation. I have reviewed the drawings submitted for the December 15, 2010 Technical Advisory Committee meeting and offer the following comments: ALTERNATIVE TRANSPORTATION REVIEW COMMENTS 1) The City of Carmel Parking Ordinance requires that all developments include bicycle parking at a rate of five (5) bicycle parking spaces per one hundred (100) required automobile parking spaces. Please see the City of Carmel's Parking Ordinance in order to determine appropriate locations, specifications and construction details for the above. 2) The Bicycle and Pedestrian Plan requires the construction of a 10' path along 106 St. Please revise the plans to include and label this facility. 3) Please consider providing a sidewalk on both sides of the entrance drive. 4) Please indicate ADA compliant crosswalks at all pedestrian crossings. We request that all responses to our comments be provided in writing. Failure to provide written responses may result in delay of the review process. Page 1 CARMEL, INDIANA 46032 317/571 -2417 City of It is critical that this office be made aware of all modification made on the plans being re- submitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans indicating all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, Special Studies or other committee meetings. The Department of Community Services reserves the right to provide additional comments based on subsequent reviews. If you have questions, please contact me at 571 -2417. Sincerely, David Littlejohn Alternative Transportation Coordinator Department of Community Services cc: Angie Conn, Department of Community Services Engineering Department Review Project File DEP.AR I MENT OF COMMUNITY SERVICES Page 2 ONE CIVIC SQUARE CARlMIEL, INDIANA 46032 Carmel 317/571-2417 November 30, 2010 Mr. Eric Carter Weihe Engineers, INC. 10505 N. College Avenue Indianapolis, IN 46280 RE: Pilgrim Lutheran Church Job number: WO9O542 Dear Mr. Carter: The above mentioned project has been received and reviewed. At the present time, I see nothing in the plans that would hamper law enforcement efforts. If we can be of any further assistance to you, please contact us. Respectfully, Michael D. Fogarty Chief of Police MDF:vb cc: Dept. of Community Services 7) 571 -2500 Carmel off ce elpariment 3 Ci ic-.Sg9L are Ca Traci, I[ magna 46032 A Nationally Accredited'Law Enforcement Agency RECEIVED DEC 2 2010 DOCS Fax (317) 571-2512 DEC -01 -2010 08;04 Fr am: PANHANDLE EASTERN 317 733 3204 Panhandle Energy Date: 11/30/2010 Re: Pilgrim Lutheran Church Pages Cover:1 To: Eric Carter Company: Weihe Engineers Fax: 317- 843 -0546 From: Troy Yackle Fax: 317-733-3204 Phone: 317- 733 -3313 To ;843 0546 P.1 Panhandle Eastern Pipe Line Company, LP Trunkline Gas Company, LLC 9371 Zionsville Road, Indianapolis, IN 46268 Phone: (317) 733 3213 Message: After reviewing the construction drawings it was determined that Panhandle has no conflict with the proposed building construction. There is an issue with what appears to be a plan for a baseball diamond to be constructed later. The location of the baseball diamond will encroach upon the pipeline easement and violate restrictions set out in the referenced easement. Please contact me so we can discuss this further. Conn, Angelina V From: Sent: To: Cc: Subject: Attachments: Conn, Angelina V Monday, November 22, 2010 1:15 PM 'Jon Dobosiewicz' Jamie Shinneman; Charlie Frankenberger ;'gapowell @indy.rr.com' Review comments for Pilgrim Lutheran Church #10110009 SUA 10110010 V) Carmel Green Building Checklist.doc Good afternoon, Jon Please reply to each of the review comments for the Pilgrim Lutheran Church applications via email or letter correspondence on or before Jan. 7, 2011. Additional review comments may be voiced at the Dec. 15 TAC meeting. Thank you. Department's Review Comments; please complete the following: 1. Please provide copies of your correspondence with the TAC members and their correspondence with you. 2. Feel free to bring color and material samples to the BZA meeting. 3. Make sure the public notice meeting time to the newspaper and neighbors reads 6 PM. It is suggested to send the notice to the Indianapolis Star newspaper by Noon, two days prior to the printing deadline (317- 444 -7163 or email: publicnotices @indvstar.com). 4. Provide a copy of the Official List of Adjacent Property Owners from Hamilton County Auditor's Office from Indianapolis /Marion County. 5. Please make checks payable to the City of Carmel. 6. Please provide filled out and notarized Placement of Public Notice Sign affidavit. 7. Provide the filled out Petitioner's Affidavit of Notice of Public Hearing form. 8. Provide the filled out Notice of the Public Hearing before the BZA form. 9. Please provide proof of notice from the Indy Star. 10. Please provide green signed return receipts. 11. Side yard building setbacks for a church are 25 -ft, per zoning ordinance chapter 26.02.08. Please add this to the site layout plan sheet C102. 12. Per the C3 Plan Pedestrian and Bike Plan map, please show /label a 10 -ft wide path along 106 St. (Please work with David Littlejohn, Alternative Transportation Systems Coordinator, on the details of this. 13. Please label the 40 -ft half road right of way along 106 Street. Right now, it is only labeled as 40'. (A 60 -ft proposed r/w is not required, but please verify this with the Carmel Engineering Dept.) 14. Prepare an estimated construction cost to comply with the Thoroughfare Plan Alternative Transportation Plan; contact the Engineering Dept. for more details. 15. Do you propose any fencing? If so please provide details on the fence design location. 16. Please consider using additional LEED or `green' building practices, such,as a white membrane roof, solar panels, skylights, pervious pavers in all or part of the parking area, etc. List. is attached. 17. Please show future parking areas on the landscape plan, too. (The Forestry Dept will review /approve the landscape plan.) 18. Is there a reason why some of the drive aisle widths within the parking area are 36 -ft wide? Can you reduce them down to 25 -ft wide? 19. Please label the mechanical equipment locations on the site plan and provide details on how they are screened from view. This includes electric and gas meters. 20. Ground sign base needs to be landscaped. See sign ordinance chapter 25.07.02 -7. 21. Please make sure that all exterior light fixtures have flat lenses and 90- degree cut offs, and have shields on the sides that face residential neighborhoods. 1 22. Please provide more detail ZTihe bell tower noise, dB, range, etc. Also City Code 6 -158 Noise Regulations for further detail: http: /www.amlegal.com /carmel in/ 23. You might need to seek a waiver from the Engineering Dept for not having curbs in some of the parking area. See ordinance chapter 27.03. Angie Conn, Planning Administrator City of Carmel Planning Zoning Dept 1 Civic Square, 3rd Flr Carmel, IN 46032 0: 317-571-2417 F: 317 571 -2426 E: aconnPcarmel.in.gov W: Website Please consider the environment before printing this e mail 2 Conn, Angelina V From: Eric Carter [cartere @weihe.net] Sent: Friday, November 19, 2010 1:05 PM To: Conn, Angelina V Cc: Jon C. Dobosiewicz (E -mail) Subject: FW: Pilgrim Lutheran Church and Turkey Hill Minit Markets HI Angie, TAC comments from Duke They have no objections. (see below) I downloaded the TAC list earlier this week from your website and just looked again today, as Gary said our transmittal address was incorrect. Looks like your TAC list just was updated Wednesday with his new address. I did notice that the Ham. Co. Health Department's address still is outdated. (Unless they moved back into the Courthouse) I'm double checking with the new list to make sure we didn't miss anyone in the TAC distribution. Thank you, Eric Eric A. Carter, R.L.A., ASLA Project Manager, Commercial Development Weihe Engineers, Inc. 317 1 846 6611 weihe.net Original Message From: McNamee, Gary S f mailto:Garv.McNamee duke- enerov.coml Sent: Friday, November 19, 2010 12:10 PM To: Jamie Shinneman Subject: Pilgrim Lutheran Church and Turkey Hill Minit Markets HI Jamie, I have reviewed both of these proposals and based on these drawings, there is no impact on the Duke Energy Transmission line easements. Duke Energy's Asset Protection has no objections. Thanks, GARY MCNAMEE Asset Protection Midwest North Duke Energy Please note my mailing address. The delivery address that was on the drawings was incorrect. 2727 Central Ave. Columbus, IN 47201 812- 375 -2021 1 JAMES J. NELSON CHARLES D. FRANKENBERGER JAMES E. SHINAVER LAWRENCE J. KEMPER JOHN B. FLATT FREDRIC LAWRENCE JAMES A. NICKLOY CHRISTOPHER A. FERGUSON Angie Conn City of Carmel One Civic Square Carmel, IN 46032 Dear Angie: Enclosures Ltr to A Conn 111910 NELSON FRANKENBERGER A PROFESSIONAL CORPORATION ATTORNEYS AT LAW 3105 EAST 98TH STREET, SUITE 170 INDIANAPOLIS, INDIANA 46280 PHONE: 317- 844 -0106 FACSIMILE: 317- 846 -8782 November 19, 2010 Re: Pilgrim Lutheran. Church 3650 West 106 Street December 15 January 25 We will soon be conferring with you to identify any additional variances that may be required. Should you have any questions regarding this, please do hesitate to call. Enclosed you will find applications for Special Use and Variance approval. The engineer has affected the TAC distribution, and our anticipated schedule is as follows: TAC Board of Zoning Appeals (Public Hearing) Very truly yours, NELSON FRANKENBERGER, P.C. Jon C. Dobosiewicz Land Use Professional JANE B. MERRILL, Of Counsel JON C. DOBOSIEWICZ, Land Use Professional TRANSMITTAL Date: 19 November 2010 By: Eric Carter These are transmitted as indicated below: Approved n Approved as Noted Not Approved, Revise and Resubmit Action Not Required Action Indicated on Item Transmitted n For Signature. Return Copies to Us To: Dept of Community Services (DOCS) Project. Pilgrim Lutheran Church One Civic Square, 3 Fir Job W090542 Carmel, IN 46032 Phone: 317-571 -2417 Attn: Angie Conn/ Christine Barton Holmes Fax: 317-571-2426 We are sending you Attached Under- separate cover via Delivered the following items: Shop Drawings Prints Copy of Letter Product Data Specifications Meeting Minutes Samples Change Order(s) Inspection Report Sketches/Drawings Application(s) for Payment Sets Copies Document Date Document Number Description 2 Construction Plans Remarks: Please call with any questions. Thank you. 10505 N. College Avenue Indianapolis, IN 46280 weihc.net WEIHE ENGINEERS Re: TAC Construction Plan Submittal Allan H. R'eihe, 00., L.S. President n For Your Review or Use For Your Review Comment Fl As Requested n For Your Records n For Your Approval cc: 317 1 846 6611 800 452 6408 Fax: 317 RECEIVE Nov 1 9 2010 D OCS 843 0546