1. Explanation of requests
2. Aerial photograph location exhibit
3. Colored site plan
4. Building elevations
5. Building perspective renderings
6. Landscape plan and details
7. Signage
8. Lighting plan Photometric plan and fixtures
9. Site and Building details
Window and balcony details,
Dumpster enclosure,
bike racks,
green building checklist
10. Engineered Site Plan
Penn Circle TOC PC 021511
EXPLANATION
GB Developers II, a subsidiary of Gershman Brown Crowley, is the contract purchaser of
the subject site, comprising approximately 6.25 acres and located just south of Carmel Drive and
north of the intersection of North Pennsylvania Road and Old Meridian Street. The site is zoned
Old Meridian District Office and is identified on the aerial photograph included under Tab 2.
By way of general background, in January of last year, a use variance and DP /ADLS
approval were granted, allowing a multi- family community to be developed upon the site. Since
last year when the prior approvals were granted, GB Developers II has become the purchaser of
the site and is desirous now of revising the previously approved plans. These revisions require
two approvals; namely, ADLS amendment by the Subdivision Committee and DP amendment by
the Plan Commission. The request for ADLS amendment will be reviewed by the Subdivision
Committee on February 8, 2011 and the request for DP amendment will be reviewed by the Plan
Commission on February 15, 2011.
The building architecture and landscaping are illustrated by the drawings and renderings
included in this informational brochure. The architecture and site design remain very attractive
and upscale. The view corridor from Carmel Drive has been enhanced. Finally, this request, like
the prior approval, does not seek ADLS approval of the southern corner of the site; when plans
for this southern corner later become more definite, the owner will return to request the required
approvals.
This request is comprehensively illustrated in this informational brochure. The contents
include the following:
Tab 3 Colored Site Plan
Tab 4 Building Elevations
Tab 5 Building Perspective Renderings
Tab 6 Landscape Plan and Details
Tab 7 Signage
Tab 8 Lighting Plan
Tab 9 Site Details, including dumpster enclosure, bike racks, and green building
checklist
As underscored by the contents of this informational brochure, Penn Circle will be a very
upscale apartment community with a site design that is sensitive to the view corridors of
perimeter streets. We look forward to presenting this request to the Plan Commission on
February 15, 2011.
Respectfully submitted,
Charles D. Frankenberger
A I
Jon C. Dobosiewicz
Carmel Green Building /Renovation Checklist
These items are not required by the current Zoning Ordinance or Building Code, but are
strongly recommended by the Department of Community Services. Green building and
design saves energy and money while providing for a more sustainable community.
New Construction
icycle lockers /changing rooms /showers
Best Management Practices for stormwater
ative landscaping/tree preservation
Connectivity to adjacent sites
P edestrian
Vehicular
een roof
White membrane/high albedo roof
'Porous pavers /permeable pavement in parking lot
Recy g areas onsite
ternal recycling areas
External recycling areas
arking islands landscaped to provide shade within 5 years
igh- efficiency lighting inside and outside
Building and finishing materials sourced from within 500 miles
ater efficient fixtures throughout
se of recycled materials in construction and fit -out
Operable windows for cross ventilation and light
igh efficiency HVAC systems
U se of Energy Star or similar appliances
w VOC paints, coatings, and sealants
L t ow-E glass
Ej fow VOC flooring materials
❑Light and motion sensors for lighting and water fixtures
❑Wind turbine and/or photovoltaic panels, placed to maximize efficiency and minimize
visual impact.
Renovation
Same as above plus:
❑Building reuse
['Site materials reuse
❑Increase in green space /landscaping
Reduction of runoff