HomeMy WebLinkAbout0002.96 CorrespondenceRN THOMPSON'& ASSOC. -.TEL:1-317-353-0684 O F. 19,94 14:08 No.003 P_02,
TORS CO.
234 S. FRANKUN ROAD
INDIANAPOUS, IN 46219
(317) W6.2461
October 19, 1994
Mr. David Clark
Regional President
zaring Homes, 'Inc.
11711 North Meridian street
suite 200
Carmel, IN 46032
Dear Dave,
Please let this letter serve as official notification from the
Architectural Control Committee of the Sutton Place Section I
Community granting you approval to build the attached homes
pursuant to the terms and conditions of the contract between taring
Homes and Sutton Place Joint Venture and the architectural
guidelines attached as, Exhibit "AM as part of that contract. The
following homes are approved for construction in Section I subject
to the above and following conditions:
AapMvad Homes•
Meridian Huntington Delray
Bradbury Harrison
This approval is also subject to the following conditionsc
I. All homes shall utilize a side load ,garage entry unless
specifically agreed by the sutton Place Architectural control
Committee.
2. Any further homes which taring wishes to offer in the Sutton
Place section I iC6=munity must also be approved by the
Architectural Control Committee prior to their construction.
3. Final color schemes shall be submitted prior to the
construction of _ttie first home for approval by the
Architectural control Committee whose approval will not be
unr@asonably withheld.
4. Zaring agrees. to follow the mailboxes which are utilized as
standard mailboxes -in Button Place Section 1.
S. Prior to the, closing of the first home in the community,
Zaring shall submit dusk' to dawn lights for approval by the
Architectural Control Committee.
RN'THOMPSON 8 ASSOC, ' TEL:1-317-353-0684 0"t. 19.94 14:09 No_003 P.03
6. Ali ohimneys on Zaring homes must be brick.
7. Siding must be wood, wood oomposite or; stucco material, no
aluminum to be allowed.
B. Developer understands and agrees that builder will construct
speculative or market houses; in the community. These homes
will be finishad,on the outside while the inside will remain
at the frame stage.
9. Standard landscape plansiwill be approved prior to the initial
' closing of the lots and, shall be consistent with the
architectural guidelines aa,attached as Exhibit ^A."
As long as the above conditions are met, these homes are approved
construction within the Sutton Place sect on Community:. Should
you have any, further questions or comments, please do not hesitate
to contaet'me at our office. please note that the most up-to-date
architectural guidelines have bebm attached as Exhibit "A" to this
approval., Please sign below 'to indicate your acceptance and
agreement.
$oat Sincerely,
David M. Compton
Project coordinator
Sutton 'Place Joint Venture
AGREED AND ACCEPTED:
cc: file
DGrke
060 _