Loading...
194167 02/03/2011 CITY OF CARMEL, INDIANA VENDOR: 357899 Page 1 of 1 0 ONE CIVIC SQUARE F K CONSTRUCTION INC CARMEL, INDIANA 46032 2055 w 150 S CHECK AMOUNT: $4,750.00 FLORA IN 46929 CHECK NUMBER: 194167 CHECK DATE: 2/3/2011 DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION 206 R4237001 21378 2 4,750.00 106TH ST PATH CONSTRUCTION PROJECT INVOICE DATE: January 18, 2011 COMPANY NAME: F K Construction, Inc. AND ADDRESS 2055 W. 150 S. Flora, IN 46929 TELEPHONE NO.: (574) -967 -4543 FAX NO.: (574)- 967 -3934 PROJECT NAME: 106 Street Path from Westfield Boulevard to Keystone Parkway PROJECT NO.: 09 -09 INVOICE NO.: 2 Construction pay items as per Progress Pay Estimates No. 2 as shown on the attached invoice for work completed between the dates of December 1, 2010 to December 31, 2010. TOTAL PAY THIS ESTIMATE: $4,570.00 MINUS 10% RETAINAGE: N/A TOTAL NOW DUE: $4,570.00 Submitted by CrossRo d Engineers, PC Project Repr'e ntative signed name ate Andrew Wolf 1/18/2011 Project Representative 7 printed name Date 1 of CITY OFC*RMEL 108th Street Path Westfield Boulevard »n Keystone Pu,kway8- SaUetnVVhionOak PROJECT NO. oV'V9 PROGRESS PAY ESTIMATE NO. 02 For work done during the period of: 1211110 through 12J31n0 I Mobilization I Demobilization LS LS $29.000.00 2 Maintenance of Traffic LS LS $4.500.00 3 Clearina Riqht of Way LS LS $6 4 Tree Removal LS LS $21 00000 5 Linear Ditch Grading LIFT LFT $5-00 6 DELETED 8 Inlet, Type J EA EA $1,400,00 __2_ Manhole, Type C EA EA S1,600.00 10 Manhole. Type K EA EA $2.900.00 11 Concrete Pipe Catch Basin. 18" EA EA $1 12 4" PVC, SCH 40 LIFT LFT $25.00 14 12" RCP LIFT LIFT $2500 15 15" RCP LFT LIFT $86.00 16 24" RCP LIFT LIFT S4ZOO 17 12" Concrete Pipe End Section EA EA $860.00 18 15" Concrete Pipe End Section EA EA $870.00 19 Reinforced Concrete Headwall LS LS $25.400.00 20 Handrail LFT LIFT $145.00 24 Storm Manhole, Adjusito Grade EA EA $345,00 25 Water Meter, Adjust to Grade EA EA $850,00 26 Water Valve, Adjust to Grade EA EA $235.00 27 HMA Surface. Type A TON TON $95.00 28 HMA Intermediate, Type A TON TON $64.00 29 Surface Milling, 1-112" SYS SYS $4.00 30 Compacted Agg, o. 53, Base TON TON $19.00 31 Concrete Curb Ramp, Type G SYS SYS $75.00 33 Erosion Control Blanket SYS SYS S2,00 34 Erosion Contra[ Measures LS LS $4,200,00 35 Topsoil (Undistributed) CYS CYS $13,00 36 Pipe. Remove LFT 84.00 LFT S15.00 $1,260,00 37 !Structure Backfill, Type 1 CYS 56.00 CYS $45.00 $2,520.00 38 Structure BaCkfill, Type 3 CYS 113.76 CYS $30.00 $3,412.80 39 HMA Surface, Type C TON TON $560.00 40 PCCP, 12 IN SYS 55.12 SYS $9500 $5,236. 41 Rip Rap Class 2 TON 62.54 TON $28.00 $1.751.12 42 Wingwall SPT 294,30 SIFT $57.00 $16,775.10 43 Pipe, Reinforced Concrete, 36 IN- LFT 88A0 LIFT $65.00 S5745.00 44 Pipe End 36 114 EA 1.00 EA $1,420,00 $1 T 420,00 �6 Road Closure Sign Assembly EA 4.00 EA $400,00 $1,600.00 47 Detour Route Marker Assembly EA 18.00 EA S150.00 $2.70&00 48 Consl.ructbn Siqn, A EA 6.00 EA $220,00 $1.320.0a 49 Barricade. 111-B LFT 48.00 LFT $14,00 $672.00 80 Linear Grading for Path LIFT Cl: $6.00 51 Water Hydrant, Adjust to Grade EA EA $950.00 52 Straight Concrete Curb LIFT LFT $35.00 53 Concrete Curb andLGutter LIFT LFT $3500 '54 Compacted Agg, No, 53, Base TON TON $20.10 '55 HMA Intermediate, Type A TON TON $12700 winterization LS LS $3,745.00 '57 Concrete Curb Ramp, Type G SYS SYS $144.72 '58 Wingwall Dewatering 1.001 LS 1 100 L $4,320.00 $4,320.00 S4,320.00 '59 Concrete Cr die too 1 1.00 $250,00 $260,00 S25000 *60 Water Main Backfill Compaction LS L S4,19000 $4,57000 $54,750.68 TOTALS AND PAY ESTIMATE CALCULATIONS zor2 CITY OF CARMEL 106th Street Path Westfield Boulevard to Keystone Parkwayll_aSalle to White Oak PROJECT NO. 09 -09 PROGRESS PAY ESTIMATE NO. 02 Forwork done during the period of: 1211110 through 12131?1a Item Description Quantity this Total Quantity Unit Total °Pay Total Pay 1 Estimate to Date Price this.�stimate to Date TOTAL PAY THIS ESTIMATE $4,570.00 TOTAL PAY TO DATE 554 DEDUCT 10% RETAINAGE I DEDUCT PREVIOUS NET PAY ESTIMATES s5o,lsa.ss i� NET PAY ESTIMATE NO. 01 $4,570.00 CrossRoad Engineers. PC Inspecting Firm v i2 F K Construction Cornracicr 3y Dale t Prescribed by State Board of Accounts ACCOUNTS PAYABLE VOUCHER City Form No. 201 (Rev. 1995) CITY OF CARMEL An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc. Payee F &K Construction Purchase Order No. 2055 W. 150 S. Terms Flora, IN 46929 Date Due Invoice Invoice Description Amount Date Number (or note attached invoice(s) or bill(s)) Vi 8M 11 2 culvert mplacernen't along JVWL11 k vvestfelud to Key) 4 A,570.00 *see Change Order through Utilities Total I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited sarrso"o ce with IC 5- 11- 10 -1.6. 20 Clerk- Treasurer VOUCHER NO. WARRANT NO. F&K Construction ALLOWED 20 —2055 W. 150 S. IN SUM OF Flora, IN 46929 $4,750.00 ON ACCOUNT OF APPROPRIATION FOR Department of Engineering Board Members PO# or INVOICE NO. ACCT #!TITLE AMOUNT DEPT I hereby certify that the attached invoice(s), or 21378 2 206- R42370 1 is (are) true and correct and that the materials or services itemized thereon for which charge is made were ordered and received except 20 Signature t) Title Cost distribution ledger classification if claim paid motor vehicle highway fund