HomeMy WebLinkAboutCCM-01-03-11 CRC REPORT NO COUNCIL MEETINGCRC Meetings Financial Matters: CRC Public /Private Partnerships: 2. The Palladium (Parcel #7 -A)\ CARMEL REDEVELOPMENT COMMISSION January 3, 2011 CITY COUNCIL REPORT (Prepared for Bill Hammer 12/17/10) The CRC held their regularly scheduled public meeting on Wednesday, December 15, 2010 at 6:30 p.m. Upcoming Meetings: o Tuesday, December 28, 2010 Special Meeting o Wednesday, January 19, 2011 Regular Meeting The end of month November CRC Operating Balance is $18,141,767 1. City Center CRC /Pedcor LLC. (Parcel #5) a. Please see attached report from Signature Construction (Distributed at 12/15/10 CRC meeting). a. Exterior finish work is moving ahead to complete the pavers, drives and sidewalks. Streetscape on 3rd Ave and City Center Drive is moving toward completion, subject to weather. b. Sod has taken root and should survive until Spring. Final landscaping on the west, south east sides will be completed in. Spring 2011. North side landscaping will be completed under City streetscape contracts. c. Retaining wall limestone covering is nearly complete. Interior final finish and punchlist items are being completed in all the adjacent support spaces. d. Work is underway on Feinstein's office and display space on the third floor. Contractors are making an effort to have it finished by the Grand-Opening. Furniture and fixtures are arriving daily. 1 e. Artec continues to make adjustments in equipment and training of the Palladium staff. Tuning concerts continue on a regular basis with the public buying tickets in person so they can look at the Hall. 3. The "Green" (Parcel #7 -B) (The "Green" is the green space between the Concert Hall and the Main Stage Theater /SEP Office building to the south.) a. Please reference attached REl Project Manager's report. b. Construction Manager Meyer -Najem advises that the loop road that comes off 3rd Avenue and serves both The Palladium and supporting theaters was completed for Office Building #1 tenant (SEP) to move in by December 1, 2010. c. Temporary sidewalk has been poured to connect the 7 -C Garage to the Palladium across Center Green. d. City IT and Communications staff are studying wi -fi installation for the campus. e. The "Green" surface will be ready for Palladium events with final landscaping complete in Spring 2011. All contracts for work have been awarded. 4. Energy Center (Parcel #7 -C) a. Construction work is nearing completion to add the additional pumps and modules to serve the Main. Stage Theater, Office Building #1 and Office Building #2 with the necessary capacity that will serve existing city buildings to include City Hall, police department and fire station. Work was substantially completed in October 2010. b. Survey work has been completed to establish routes to run hot and chilled water lines to the city buildings. Final engineering documents will be bid to establish construction costs of running lines to city buildings. Consulting engineers have worked up a cost estimate to rework the 20- year -old heating and cooling systems in the existing city buildings, especially police headquarters. All construction and piping extension for the three buildings are scheduled to be completed by January 1, 2012. c. City Utilities will start operating and maintaining the Energy Center on January 1, 2011. The CRC will fund all operating expenses for the Energy Center. 5. Main Stage Theater CRC, REI and. Pedcor LLC (Parcel #7C -1) a. Construction is moving forward at a fast pace. Structural steel is about 100% complete with adjacent masonry shaft for the elevator and stairs completed. b. Contracts have been awarded for shell and core and are below budget. 2 c. Masons are completing the enclosure wall around the Theater interior space. The architects have submitted the proposed Theater color schemes and finishes to the CRC Plan Review Panel, and received approval by the committee. Samples of Theater seating have been submitted for approval. d. Main Stage Theater is set for completion in June 2011 and the Studio Theater could be ready by March 2011. e. Bids for Theater equipment have been received and appear to be below budget. Theater interior finishes bids have been received and are being evaluated. Artec, Civic Theater and Steven Libman are reviewing theater equipment lists. 6. Studio Theater Office Building #1 (Parcel #7C) a. Interior construction of the Theater space is well underway with all trades installing walls, ceilings, structural supports and mechanical and electrical rough -ins. b. Theater equipment and sound systems have been ordered and will start to be installed by the end of December 2010. c. Construction Manager has had Civic Theater and Steven Libman sign off on theater and sound equipment lists. d. Studio Theater general construction will be substantially complete December 31, 2010. 7. North Office Building #1 CCDC (Parcel #7C -3) a. The building shell has been entirely enclosed. All glass and frames have been installed on the east and north wall. Masonry is going up on the east and north side of the building. Interior cores spaces are being completed with mechanical and electrical work complete on the top two floors. b. The SEP tenant space is complete with SEP moving into the building January 3, 2011. c. Building elevators and lobbies are open to the public. 8. Parking Structure CRC (Parcel #7C -3) a. The garage construction Substantial Completion document was issued November 30, 2010. Construction Manager has received from City agencies the Certificate of Occupancy dated November 30, 2010. b. Contractor has completed repairing topping slabs -on all floors. Contractors have completed the concrete slabs at grade except for Civic rehearsal space due to plumbing rough -in work. Concrete contractor has completed the underground storm water retention area under the south end of the garage. The storage space under the ramp at the first floor will be shared with both theaters and Farmers Market equipment. 3 c. Framing and glass infill at stair towers along with architectural grillwork are now complete. d. The garage security system as well as the controlled entry points have been resolved with security consultants as the building relates to both the Theater and Office Building. e. The garage was open to the public on December 1, 2010. 9. Arts District Lofts Shoppes CRC /Keystone Development (Parcel #47) a. Contractor has basically completed the underground garage with installation of utilities for drainage, water and power. Utility companies are running power from across the street (north side of 1st Street NW) into the electrical load center in the garage. Final transformer and meter panels have been resolved with Duke Energy. Street cut for utilities is being coordinated with City agencies. b. Additional carpentry and drywall labor is being added to the job for interior finish. Good weather has helped the schedule. c. Mansard roofing is complete with full roofing completed October 2010. Material suppliers are arriving daily to keep up with the construction. d. Building exterior masonry is complete on the east, north, west and south side of the building. Developer has submitted minor exterior changes to the CRC Plan Review Panel for upper floor wall vents and penetrations. e. Trade contractors are constantly being reminded not to park on City streets and to park at the old City Street Department site. Contractors will soon be able to park in the lower levels of the garage. f. Bids for streetscape and road work were received on July 14, 2010 and rejected. Construction Manager recommended rejecting bids and re- bidding with more alternates based on Commission's comment that the costs are over budget. Bids were opened on September 8, 2010, 8:00 a.m. at a CRC special meeting and taken under advisement with the Construction Manager making recommendations at the September 15 regular meeting to award contracts to Gibraltar Construction for all streetscape and 2nd Ave rebuilding to include storm water provisions and Monon Trail repairs on east side of trail. 10. Arts Design District Parking CRC (Parcel #62) a. The site behind the Chaos building has been filled with gravel on a temporary basis to fill in where old garages were demolished to allow-for proper drainage away from buildings. b. Existing CRC parking area has been re- striped to provide a more orderly and effective visitor parking area. 4 c. The CRC is reminding merchants and their staff that they should be parking in the Carmel Lions Club Parking lot to maintain available parking for shoppers. Arts Design District Update: 1. News and Events a. A new Italian restaurant, Donatello's Italian, will be opening at 9 W. Main Street in the Arts Design District in late December. b. The Indiana Design Center recently announced new first floor retail showroom tenants, Holder Mattress and Santarossa Mosaic Tile Co. Currently 80% of the Design Center is leased. 5 Carmel Redevelopment Fund (902 Vow 2010 CRC Month!] ..g acted Sources Review December 10, 2010 .:aaI 1 050.E.1 L January February ��71 S SE 1��0 1 RECEIPTS: I 71F Revenue 479,850 4,955,709 4 9,702.7 t5: 10384532 5.057 247 15,552,139 MEI Other Receipts; Reimbursements lanlar =NMI 8.500 coo 18500,000 9.509000 Mill Sale of peseta ./16 l1NT Shops II Pend 21 Luna Bugnp Cables 100 000 160000 100 009 arts 92 /poatdc Church 1,02..000. 0 1022009 Ee■rQy Co. Developer-71F Interest Miseekoneous revenue 62.769 99,122 560 61,400) 5..3 22,585 10,834 32,672 26367 42,270 L28,712 CRC DepositS 79,242 79212 7 9,2 1 2.. Thud revenues 543 820 11 534 637 30 sa.riv 32,321 4,991051 4,975,705 18011,030 32,897 79 319 26,370 11.234.171 6,725,056! 16.367.153 57,P75:4.09 21215,13:9 Land APouisitions and teases 731.720 Dthef Projects 000 92 38.000 26,731 19,000 19.000 19,000 5. In ,c54 157,000 100.000 Parcels 4811 Intern Fees 19. 19360 Parcel 9-31 Chaos 2,435 2,436 11490 2,436 3270 2,436 2,430 767 34 27,706 .92 Pared 10 31250 90 Pmcels 14 Head Properly Purchase 16,000 10,000 20.000 10,003 10003 10,000 10,000 10.030 10,603 10,600 40.0004 106,009 126003 126000 Leasee.OTS,CRC,waadsotre, &J 41,935 53320 80,901 52.819 41,918 6 31,423 16.180 45,186 9,169 14,206 31.25% 459.2 51 Construction Protects F und 902 85,315 116,488 101063 605,170 122.446 104,208 637,791 805.675 1.200,523 560,826 652,446 4,113,704 4.796.993-. 2,955003 Construction Prgeds: RPAC 3200,161 157,619 5799.593 1,932,045 1,448979 1.140,910 2,345,726 1057,022 2,184,992 1169.913 2.764,532 2.331,000! 21,587,453 26,6729W, Envoy Center proceeds used m pay PAC PAC Profession./ Fen PAC Consultant Rik 1 350.955 000 °Potations and M.A. O Operations 130 1,019,789 X96 75:909 Manteti Communications 2,951 13.457 35.147 45.148 4,314 11.159 7,030 45 369: 172039 I 75.139• 300,000 Mark u 1 era Lope( 36,754 68719 14,981 16,395 36951 49,975 42.913 11.657 sa.mo 272033 3:1990., 600000 ArcivEn neon 29556 30575 4 193 60 669 164 921 109 117 34012 34177 45 635 .1003 529...81., 495.030 Accounting Fe. 72,543 2350,000 Administrative and other 150125 laseellaneouS 25.934 28.361 30, 5.7� 000. 3.221 032 6900030 e.. .17on-PAC L1.1 Service 187916 1,127, 500 t.b05: 7"s ?.Y36806 2005 PAC Lea» fi9W,306 0 C ordred PUmAE.6e P eymems 125,000 2 2a.00e 12,891 173,273 601898 7.231;aT1{ 2.52'i 615 5.00;.209 3" 2,704200 kemi8vn Cou Taxes 6 0 TIF Peyrnentsdntereal 239,991 753,408 1 1,522,178 t'32175 Tw{e 861 503 597009 6.3619410 2,759039 2,441,841 2604,59] /000031 1J.686, 211./ 19,671,281 S1.SSL65a- 19,0.13,000 ENpNG OPERA73NG BALANCE ].439,]69 1,376,297 4,255,907 1,523639 4,077.739 fi,1a9,832 1f.989;5aT: rmw,n ra cmna e+Yerreu 90 {1,503000) 8admarun mom, rnew 3 (3000,0001 29oe7uma ernes can serxu merw {1389,190) (1339190) (13J9190) (1,3J9.i901 (1339,490) (1,339490) (1,339,190] UNRESERVED ENDING BALANCE 1 I10,4J. 15080,631 1 For internal administration use only; should not be used by others for any purpose. See assump14ons. Actual results may vary and Inc differences may be malarial. ignature onsfruction, LLC City Progress Report 12/9/10 Signature Construction is pleased to provide a brief list of highlighted activities being completed in Carmel within the last month for Carmel City Center Building A, Building B, P111 Waterproofing and Pavers, Village on the Green Parking Garage, Village on the Green Theater, and Tenant information at Indiana Design Center as well as Carmel City Center Buildings A B. 1. Parcel 73 Streetscape Project Cast in place retaining wall work at the northeast corner continues. The northwest patio paver work is approximately 90% complete. The radius ramp pavers at the City Center Drive storefront and parallel parking along Rangeline Road are 75% complete. Tree installation has begun along Rangeline Road and City Center Drive. 2. P -111 Waterproofing, Mud Slab and Pavers Installation of the decorative jersey barriers along Veterans Way continues. The installation of the expansion joint assemblies at the walkways continues. Paver installation at the walkways along Hanover continues. Waterproofing applications continue. 3. Carmel City Center Building A Parcel 5 At the south east turret area, contractors completed rough in and sheathing at these areas, the EFIS contractor has built scaffold and tented in areas so they can commence with base and finish coats. Cold temperatures at this time have prevented installation of these items. At the north east corner, final granite deliveries adjacent to the Parcel 73 lower staircase have arrived to the jobsite and installations have continued. At the parking garage, the balance of the coiling doors and fans have been drop tested and certified by the installer. All elevators on site have been certified by the state of Indiana. Punch/completion lists have been issued to contractors, and are actively being completed. 4. Carmel City Center Building B Parcel 5 Drury Simmons tenant fit out work has continued since the last report. The ceiling grid is completed. Ceiling tile installations have begun. Wood trims, wood door jambs, crown, and trim have commenced on site as well. Cabinet installations have continued as well as flooring and carpeting installations. 5. Village on the Green Parking Garage Parcel 7C -3 Pedcor Design Group has provided a punch list in which the contractors will complete as weather permits. The formal completion date is 12/1/10. The substantial completion letter is out for contractor and owner signatures. 6. Village on the Green Theater Parcel 7C -1 We are scheduled to complete the last of the CMU walls at the Auditorium (at West side access point) by the end of next week. Veneer masonry wall work continues at both the North and East elevations. Exterior CFS wall framing is complete at the South elevation and the sheathing is nearly complete as well. CFS exterior wall framing continues at the West elevation and should be complete within the next few weeks. This West elevation is the last elevation left to complete with respect to exterior walls. The high overhead ductwork within the Auditorium is scheduled to be complete yet this week. In addition, we continue to work on installing ductwork above the 2 11d floor mech. rm. and have started installing ductwork at the V' floor East side. The steel above the stage has been set in place and detail work is currently in progress. The detail work at the roof and grid iron levels is complete and the remaining detail work (at catwalk levels) is scheduled to be done by the end of next week. Steel work above the Auditorium area is scheduled to resume the week of 12/20. The air handling units have been delivered to the site and set in place. We continue to install overhead conduit at all three (3) floors. In addition to the 1 floor East and South sides, we have started some interior wall framing at the 3` floor as well. We have started installing sprinkler piping at various areas of the bldg. Weather permitting, we are scheduled to start installing the roofing system at certain areas (i.e. at N end and above 2 fir. mech. rm.) within the next few weeks. 7. Indiana Design Center Tenant Spaces The total leasable square footage for Indiana Design Center is 82,975 square feet. Currently, 64,437 square feet is leased. 8. Carmel City Center Tenant Spaces The total leasable space for Carmel City Center Phase 1 is 78,427 square feet. Currently, 26,371 square feet is leased. r k r mgt% »2e- m0 7 r�� s` Major Progress Items •Certificate of Occuptancg received an 11/24 for the Garage +Certificate of Occupancg received on 12/1 for the Office Building •Certificate of Occupa.ncg received on 12/1 for the SEP space floors 3 4 "Black Box; Sprun6 wood floor has been instedled. Cab lin6 installation 01160 •Theater: Rough In, Structural Steel and Catwalks, Ductwork installation, and mechanical room. 'i R 5��. The Arrival _dxperience CONSTRUCTION a( Arrival Experience Tile Arrival Expen t w:► nee a l y tT. i Tile Arrival Expen t w:► nee Exiting the Office :.wilding u ni 04.2 AO AO lac_c tox Progress Sprung Floor Suspension Grid and House Lights Tarkington Theater Interior Progress Certificate of Occuyanc City of Carmel #rownship BUILDING PERMIT NUMBER: 091 10056 DATE OF CERTIFICATE: 12/01/2010 THIRD AVE SW THE COMMERCIAL NEW STRUCTURE AT THE ABOVE REFERENCED LOCATION HAS BEEN INSPECTED FOR COMPLIANCE WITH THE LAWS AND ORDINANCES OF THE CITY OF CARMEL l CLAY TOWNSHIP, HAMILTON COUNTY, STATE OF INDIANA; AND IS HEREBY ISSUED A FULL CERTIFICATE OF OCCUPANCY. BU DING COMMISSIONER THE BUILDING OFFICIAL 15 PERMITTED TO SUSPEND OR REVOKE THIS CERTIFICATE OF OCCUPANCY BASED ON ANY OF THE FOLLOWING: f WHEN 77-15 CERT IFICATE HAS BEEN ISSUED IN ERROR: 2. WI-1EN 77-15 INCORRECT INFORMATION 1S SUPPLIED, 3. WHEN 77-15 BUILDING IS IN VIOLATION OF THE CODE. Certificate of Occupoen Y`` City of Carmel Ctay Township THIRD AVE SW 3RD AND 4TH FLOORS BUILDING PERMIT NUMBER: 10070028 DATE OF CERTIFICATE: 12/01/2010 0 I. BUILDING COMMISSIONER Su THE COMMERCIAL TENANT FINISH AT THE ABOVE REFERENCED LOCATION HAS BEEN INSPECTED FOR COMPLIANCE WITH THE LAWS AND ORDINANCES OF THE CITY OF CARMEL l CLAY TOWNSHIP, HAMILTON COUNTY, STATE OF INDIANA; AND IS HEREBY ISSUED A FULL CERTIFICATE OF OCCUPANCY. THE BUILDING OFFICIAL IS PERMI7TED TO SUSPEND OR REVOKE THIS CERTIFICATE OF OCCUPANCY BASED ON ANY OF THE FOLLOWING: 1 WHEN THE CERTIFICATE HAS BEEN ISSUED IN ERROR: 2. WHEN T7-IE INCORRECT INFORMATION IS SUPPLIED,' .3_ WHEN THE BUILDING /5 IN VIOLATION OF THE CODE. Certficate of Occuyancy City of Car»ieC/ Clay ?awnship BUILDING PERMIT NUMBER: 09090097 DATE OF CERTIFICATE: 1 1/24/2010 881 THIRD AVE SW THE INSTITUTIONAL NEW STRUCTURE AT THE ABOVErREFERENCED LOCATION HAS BEEN INSPECTED FOR COMPLIANCE WITH THE LAWS AND ORDINANCES OF THE CITY OF CARMEL CLAY TOWNSHIP, HAMILTON COUNTY, STATE OF INDIANA; AND IS HEREBY ISSUED A FULL CERTIFICATE OF OCCUPANCY. A k kia\CMOMICL BUILDING COMMISSIONER THE BUILDING OFFICIAL IS PERMITTED TO SUSPEND OR REVOKE THIS CERTIFICATE OF OCCUPANCY BASED ON ANY OF THE FOLLOWING: 1. WHEN THE CERTIFICATE HAS BEEN ISSUED IN ERROR; 2. WHEN THE INCORRECT INFORMATION ISSUPPLIED. 3. WHEN THE BUILDING IS I N VIOL477ON OF THE CODE