Loading...
HomeMy WebLinkAboutTS0009.91dJAN. NN, T KEY PLAN SECOND FLOOR STAIRS n T I t 1.1 z SCOPE DOCUMENTS THE DOCUMENTS ARE INTENDED TO INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF DESIGN CONCEPT, DIMENSIONS. AND MAJOR ARCHITECTURAL ELEMENTS. THESE DOCUMENTS DO NOT NECESSARILY DESCRIBE OR INDICATE ALL WORK REQUIRED FOR FULL PERFORMANCE AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE INDICATED OR DESCRIBED, EACH TRADE CONTRACTOR SHALL FURNISH AND INSTALL ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THIS WORK. 1.0 THE DRAWINGS AND SPECS. ARE AN INSTRUMENT OF SERVICE AND ARE THE SOLE PROPERTY OF THE ARCHITECT. ANY RE -USE OR DUPLICATION OF THESE DOCUMENTS IS PROHIBITED WITHOUT THE EXPRESSED WRITTEN CONSENT OF THE ARCHITECT ALL WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH ALL APPLICABLE CODES, LAWS, AND ORDINANCES. 1.14 THE GENERAL CONTRACTOR IS RESPONSIBLE FOR SECURING ALL REQUIRED PERMITS AND THE PAYING OF ALL REQUIRED FEES. 1.16 ALL INTERIOR FINISHES SHALL BE IN ACCORDANCE WITH CHAPTER 42, UBC -1989 EDITION. f 1 1 WALL SYMBOL B FINISH COLOR FLOOR SYMBOL E: FINISH COLOR FINISH SCHEDULE 1. BUILDING STANDARD GB-250 DEMOUNTABLE SYSTEM WITH PUTTY COLOR, STANDARD BASE AND VINYL WALL BOARD UTIUZING 48" PANELS. 2. DRYWALL, TAPE, AND SPACKLE TO BOTTOM OF EXISTING METAL ROOF DECK. PAINT OR WALL COVERING BY TENANT. 3. DRYWALL, TAPE, AND SPACKLE TO UNDERNEATH SIDE OF FINISH CEIUNG AND STANDARD BASE.* PAINT OR WALL COVERING BY TENANT. 4. PAINTED DRYWALL AND STANDARD BASE.* 5. FIELD APPUED VINYL AND STANDARD BASE.* 6. CARPET, PAD INSTALLATION. 7. CARPET, GLUE DOWN INSTALLATION. 8. VINYL TILE 9. SEALED CONCRETE. NOTE: ALL FINISHES MAY NOT APPLY. BUILDING STANDARD VINYL COVER BASE TO BE 2 1/2" V.P.I. "SANDCASTLE" UNLESS OTHERWISE NOTED. COLOR SCHEDULE B. SHAW COMMERCIAL CARPETS CYPRESS POINT II #68661, TOBASCO. DURASAN VINYL WALLCOVERING "SEASCAPE SHELL. VERIFY FINISHES W/ EXISTING. 1.17 ALL EXIT DOOR LOCKS SHALL BE IN ACCORDANCE WITH SECTION 3304, UBC 1989 EDITION. 1.23 ALL PLUMBING WORK SHALL BE IN ACCORDANCE WITH THE UPC. 1.24 ELECTRICAL CONTRACTOR SHALL CONTACT THE UTILITY COMPANY DURING BIDDING PROCESS. ELECTRICAL CONTRACTOR SHALL COORDINATE AND VERIFY LOCATION OF ALL PAD MOUNTED TRANSFORMERS. ELECTRICAL CONTRACTOR SHALL PROVIDE ALL CONDUITS AND OTHER ITEMS AS REQUIRED BY THE UTIUTY COMPANY. 1.25 VERIFY WITH EATON LAUTH ALL "BUILDING STANDARD" MATERIALS AND SYSTEMS.