Loading...
HomeMy WebLinkAboutTS0010.91DOOR SCHEDULE 0 1 OOR 1�RAME HARDWARE REMARKS SIZE MA'I''l,. 1 YP. MATT_ Typ. (;I S. 1,CK. S'I'P. 1 3' 0" x H' 4" WI) S 1 1) 1 IM S'Fl) L 2 s 2 J3()'x84" 3 WI) STD IIM S'fl) L2 S O" x W 4" WI) WI) S' I i) IIM STD L 2 S 4 3' -O" x 8' -4" S"1 I) 1 IM STD L2 s 5 3' I)" x 8' 4" WI) S I I) 1 IM SI'I) L 2 s 6 3' -O" x 8' -4" WI) S I I) IIM Si'I) L 2 S 7 3' x K-4" WI) S II) IIM S•li) L2 S Qg'cp ?cu. IN4 c FLOOR PLAN ELECTRICAL PLAN L L rc 4 Col, K1ri rZ ilk 4 1�Atr( G►-E G02 p-I2 P' OF 4W-7 ,�A, 1.,40 071 -1542. L .4. 1 a, LIGHTING PLAN FINISH PLAN KEY PLAN SECOND FLOOR EXTENT OF REMODEL LOCK SCHEDULE L1 TENANT ENTRY LOCK L2 PASSAGE SET L3 PRIVACY LOCK L4 OFFICE LOCK NOTE: ALL HARDWARE TO BE BUILDING STANDARD. 1.1 1.14 COLOR SCHEDULE A. BUILDING STANDARD PARTITION "TAUPE B. APHAA 30X -J.P. STEVENS "WHISPER BLUE" #10. SCOPE DOCUMENTS THE DOCUMENTS ARE INTENDED TO INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF DESIGN CONCEPT, DIMENSIONS, AND MAJOR ARCHITECTURAL ELEMENTS. THESE DOCUMENTS DO NOT NECESSARILY DESCRIBE OR INDICATE ALL WORK REQUIRED FOR FULL PERFORMANCE AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE INDICATED OR DESCRIBED. EACH TRADE CONTRACTOR SHALL FURNISH AND INSTALL ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THIS WORK. 1.0 THE DRAWINGS AND SPECS. ARE AN INSTRUMENT OF SERVICE AND ARE THE SOLE PROPERTY OF THE ARCHITECT. ANY RE -USE OR DUPLICATION OF THESE DOCUMENTS IS PROHIBITED WITHOUT THE EXPRESSED WRITTEN CONSENT OF THE ARCHITECT ALL WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH ALL APPLICABLE CODES, LAWS, AND ORDINANCES. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR SECURING ALL REQUIRED PERMITS AND THE PAYING OF ALL REQUIRED FEES. 1.16 ALL INTERIOR FINISHES SHALL BE IN ACCORDANCE WITH CHAPTER 42, UBC -1989 EDITION. WALL LEGEND 1 NI EXISTING WALLS TO REMAIN. EXISTING WALLS TO BE REMOVED. NEW WALL CONSTRUCTION TENANT PART ;TIQN: GB 350 DEMOUNTABLE SYSTEM. PREVINYLED PANEL, BOTH SID- 3 OR ALTERNATE. SEE FINISH SCHEDULE. NEW WALL CONSTRUCTION: CORRIDOR PARTITION 2 1/2" METAL STUDS AT 24" O.C. WITH 1/2" GYPSUM BOARD. INSULATION WITH FIELD APPLIED VINYL CORRIDOR SIDE FIBERGLASS BATT INSULATION ABOVE 2' -0 "EACH DIRECTION. LIGHTING PLAN 2 x 4 LAY -IN FLUORESCENT FIXTURE NEW R I 2 x 4 LAY -IN FLUORESCENT FIXTURE REMOVED OR RELOCATED. ELECTRICAL LEGEND WALL SYMBOL FINISH COLOR FLOOR SYMBOL FINISH COLOR FINISH SCHEDULE NOTE: 2 x 4 LAY FLUORESCENT FIXTURE EXISTING TO REMAIN. EXIT LIGHT WITH BATTERY °ACK WALL MOUNTED SWITCH. SPRINKLER STRIP DIFFUSER RETURN AIR GRILL WALL MOUNTED DUPLEX OUTLET WALL MOUNTED TELEPHONE OUTLET COMPUTER OUTLET ALL FINISHES MAY NOT APPLY. 1 BUILDING STANDARD GB -250 DEMOUNTABLE SYSTEM WITH PUTTY COLOR, STANDARD BASE AND VINYL WALL BOARD UTILIZING 48" PANELS. 2. DRYWALL, TAPE, AND SPACKLE TO BOTTOM OF EXISTING METAL ROOF DECK PAINT OR WALL COVERING BY TENANT. 3. DRYWALL, TAPE, AND SPACKLE TO UNDERNEATH SIDE OF FINISH CEILING AND STANDARD BASE.* PAINT OR WALL COVERING BY TENANT 4. PAINTED DRYWALL AND STANDARD BASE.* 5. FIELD APPLIED VINYL AND STANDARD BASE. 6. CARPET, PAD INSTALLATION 7. CARPET, GLUE DOWN INSTALLATION. 8. VINYL TILE. 9. SEALED CONCRETE. BUILDING STANDARD VINYL COVER BASE TO BE 2 1/2" V.P.I. "SANDCASTLE" UNLESS OTHERWISE NOTED. 1.17 ALL EXIT DOOR LOCKS SHALL BE IN ACCORDANCE WITH SECTION 3304, UBC -1989 EDITION. 1.23 ALL PLUMBING WORK SHALL BE IN ACCORDANCE WITH THE UPC. 1.24 ELECTRICAL CONTRACTOR SHALL CONTACT THE UTILITY COMPANY DURING BIDDING PROCESS. ELECTRICAL CONTRACTOR SHALL COORDINATE AND VERIFY LOCATION OF ALL PAD MOUNTED TRANSFORMERS. ELECTRICAL CONTRACTOR SHALL PROVIDE ALL CONDUITS AND OTHER ITEMS AS REQUIRED BY THE UTILITY COMPANY. 1.25 VERIFY WITH EATON LAUTH ALL "BUILDING STANDARD" MATERIALS AND SYSTEMS. 4 4 z U CC Z 0 U 0 N w 1-- 5 0) F— Jaw w F-- z ED EC C w 1 0 z co L() 0 0 N CD d" z 0 z 1 0 z 0 z AM A LArL- 1/07/91 1201 CONSTR. DWGS.