Loading...
HomeMy WebLinkAboutHannum,Wagle & Cline, Engineering/Engr/ADDITIONAL SERVICES $25,000 Hannum. Waele Cline, Engineering Department of Engineering 2011 Appropriation #2009 Bond Fund; P.O. #27497 Contract Not To Exceed $25,000.00 ADDITIONAL SERVICES AMENDMENT TO e AGREEMENT FOR PURCHASE OF GOODS AND SERVICES A l► THIS AMENDMENT TO THE GOODS AND SERVICES AGREEMENT "Agreement") entered into by and between the City of Carmel and Hannum, Wagle Cline, Engineering (the "Vendor"), as City Contract #100610.07 shall amend the terms of the Agreement by adding the additional services to be provided by Vendor consistent with the Scope of Work attached hereto and incorporated herein as Exhibit "A The terms and conditions of the Agreement shall not otherwise be affected by his Additional Services Amendment and shall remain in full force and effect. IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment as follows: CITY OF CARMEL, INDIANA HANNUM, WAGLE CLINE, ENGINEERING by and through its Board of Public Works and Safety By: By: i r A_AIL al ames Brainard, Presiding Officer Authorized Signatur.- Date: Printed Name M.ry An :urke, Member Date: —2 r R. 5 t tir Title Lori S. Wa son, bar FIDITIN: 3S! &O 3 4 S Date:/ It SSN if Sole Proprietor: ATTEST: Date: a 1 1 titt.d I'.na Cordray, IAMC, Cle'F'reasurer Date: 4 FZ1wsd,hufuwocJ Sv.xC 0.14S,nxie Form vtddnwol Mound Good- A Smxu.docL171O;; 12.1.7 1M; 2x x'1 9 '.�.p O a.1l �l a W l Y� p CI February 17, 2011 1 i 0-! ARMEL JAMES BRAINARD, MAYOR Mr. Edward Jolliffe Hannum, Wagle Cline 151 N. Delaware Street, Suite 800 Indianapolis, IN 46204 RE: Additional Service Amendment #1, P.O. #27497 Dear Mr. Jolliffe: As we discussed, the City of Carmel has a need for additional professional services and pursuant to our current contract with Hannum Wagle Cline, Contract #100610.07 dated October 6, 2010, I have requested and received from you the proposed scope of services and fee estimates for the following work task: Additional Service Amendment #1— Village of Mount Carmel Drainage Improvements; 10 -08D Construction Inspection Supplement See "Attachment A" Not to Exceed: $25,000.00 Per our contract procedural requirements, 1 hereby approve these Additional Professional Services estimates, and request that the Board of Public Works ratify the above referenced Contract Amendment. PLEASE NOTE Please be advised that "Additional Services" performed on City contracts must be billed separately from the original contract and other additional services. More importantly, the invoice must reference the appropriate Additional Service and P.O. shown above. Invoices received without the Additional Service referenced will be returned for proper identification. Thank you for your continued assistance in providing the City of Carmel with your professional, quality services. If you should have any questions, please give me a call. Sincerely, 7 W Michael T. McBride, P.E. City Engineer Rev' -._and approv- a by: C. Engelki Director of Administration DFPARTmFNT OF ENGINFI ?RING ONF Civic SQUARE, CA10II I., IN 46032 OFFICE 317.57 1.2441 FAX 317.571.2439 Exhibit E%IAIL enginecring«ccmel.in.gov trZ HANNUM, WAGLE CLINE e n. g i n e ex ill g February 14, 2011 Michael T. McBride, PE City Engineer City of Carmel, Indiana One Civic Square Carmel IN 46032 Re: Village of Mount Carmel Stormwater Drainage Improvements Additional Services Dear Mr. McBride, The schedule for completing the construction of the retrofit storm sewer system at Village of Mount Carmel has exceeded the original timeframe established in our contract signed on October 6, 2010. Based on conversations with Gary Duncan it is our understanding the project requires another 4 -5 weeks of work and our inspection services will be needed through completion. In addition, we the time we had originally allotted to prepare final as- builts has also been utilized in the field due to the schedule change. HWC will continue to perform all services within our previous contract during this time, which are as follows: 1. Provide a resident construction inspector to inspect work performed by the contractor, confirm work performed meets the requirements and intent of the plans and specifications, verify quantities of work and materials in accordance with the unit price bid schedule, review contractors pay requests, review /provide recommendations related to change orders and other related duties 2. Complete As -built Record Drawings in AutoCAD format based on markups developed in the field by our staff and the contractor. Please note that it is assumed AutoCAD design files will be provided by others. 3. Conduct a pre -final inspection of all project work areas develop a 'punch list' of outstanding work items and prepare a 'Certificate of Substantial Completion' for issuance to the contractor. We have developed a fee based on estimated hourly rates assuming the inspection portion of this project is completed in less than 5 weeks. The hourly not to exceed fee for these activities, as -built plans and general coordination by our engineering staff is $25,000. HWC is excited to continue to assist the City of Carmel with this project. Thank you again for this opportunity. Sincerely, li I Jamie Ford, P.E. Business Development Manager 151 N. Delaware. Suite 800, Indianapolis, Indiana 46204 317-347-3663 Exhibit v