Loading...
HomeMy WebLinkAbout0935.00lEQUIP\AENT SCHEDULE ALL EQUIPMENT BY CARRIER UNLESS OTHERWISE NOTED. UNIT TYPE FAN COIL KW A/C LOSS T GAIN C2 FA4ANF030 20 38CKCO30 -3 57415 28785 WH -1 QM2543NW 0.75 Q MARK EF -1 676 GROAN Unit C2 1st Floor 0 r C1 6X12X7 100 CFM 14x14 LSW RAG 6x1 2x7 125 CFM uQ 9x7x7 WYE 6 "o UP 4x10x5 25 CFM 6"0 UP Unit C2 2nd Floor 6x10x6 100 CFM 6x10x6 100 CFM PLAN NOTES: 1. SEE EQUIPMENT SCHEDULE FOR EQUIPMENT SPECIFICATIONS. 2. ACCEPTABLE EQUIPMENT MANUFACTURER, CARRIER. THE MECHANICAL ENGINEER MUST APPROVE ALL OTHERS. 3. DUCTWORK IN RECREATION AREA OF BUILDING 2A TO GALVANIZED SPIRAL PIPE AND FITTINGS. SURFACE OF PIPE TO BE APPROPRIATE FOR PAINTING. SURFACE PREPARATION AND PAINT BY PAINTER. 4. DUCT IN APARTMENT UNITS SHALL BE CONSTRUCTED OF UL LISTED FIBERGLASS DUCTBOARD WITH BRANCH RUNS CONSTRUCTED OF FLEXIBLE DUCT. 5. BATH EXHAUST FANS TO BE VENTED TO THE NEAREST SIDEWALL OR ACCEPTABLE ROOF AREA. VENT THAT ARE INACCESSIBLE SHALL BE RUN IN GALVANIZED METAL 6. DRYER VENT SHALL BE VENTED TO THE NEAREST SIDEWALL VENTS THAT ARE INACCESSIBLE SHALL BE RUN IN GALVANIZED METAL NO SCREWS ALLOWED. 7. DUCTWORK SHALL BE INSTALLED AS SHOWN ON DRAWINGS. ANY CHANGES TO DUCT SYSTEM AS A RESULT OF UNFORESEEN STRUCTURAL LIMITATIONS SHALL BE APPROVED BY THE MECHANICAL ENGINEER. 8. FURNACE FILTERS SHALL BE INSTALLED DURING CONSTRUCTION AND REPLACED DURING FINAL INSPECTION. 9. ALL WORK SHALL COMPLY WITH STATE AND LOCAL CODES GOVERNING THIS PROJECT. 10. SUBMITTALS MUST BE APPROVED BY MECHANICAL ENGINEER PRIOR TO START OF WORK. (10 SETS) 11. CONTRACTOR IS RESPONSIBLE FOR COORDINATING HIS WORK WITH ALL OTHER TRADES. 12. RETURN AIR PULLED THROUGH LOUVERED DOOR IN APARTMENT UNIT UNLESS OTHERWISE SPECIFIED ON DRAWINGS. 12" 4x10x6 75 CFM Unit C2 3rd Floor 75 CFM Water 75 CFM Heuer JJ Z r W W Z cn V W Z 0 W W o i) 0 00 cy Lo COoN- d I N 1 MIN W J z 0 w 0 0 1 w 0 Z W 0 0 a. \O- Rpro No. 860351 SHEET NO. STATE OF 4 •••••""1 4 L DATE: G/Z 8/d/ REV: 0 z W o W o z 2 z W