HomeMy WebLinkAbout0935.00lEQUIP\AENT SCHEDULE
ALL EQUIPMENT BY CARRIER UNLESS OTHERWISE NOTED.
UNIT
TYPE
FAN COIL
KW
A/C
LOSS
T
GAIN
C2
FA4ANF030
20
38CKCO30 -3
57415
28785
WH -1
QM2543NW
0.75
Q MARK
EF -1
676
GROAN
Unit C2
1st Floor
0
r
C1 6X12X7
100 CFM
14x14
LSW
RAG
6x1 2x7
125 CFM
uQ
9x7x7 WYE
6 "o UP
4x10x5
25 CFM
6"0 UP
Unit C2
2nd Floor
6x10x6
100 CFM
6x10x6
100 CFM
PLAN
NOTES:
1. SEE EQUIPMENT SCHEDULE FOR EQUIPMENT SPECIFICATIONS.
2. ACCEPTABLE EQUIPMENT MANUFACTURER, CARRIER. THE MECHANICAL ENGINEER MUST APPROVE ALL OTHERS.
3. DUCTWORK IN RECREATION AREA OF BUILDING 2A TO GALVANIZED SPIRAL PIPE AND FITTINGS. SURFACE OF PIPE
TO BE APPROPRIATE FOR PAINTING. SURFACE PREPARATION AND PAINT BY PAINTER.
4. DUCT IN APARTMENT UNITS SHALL BE CONSTRUCTED OF UL LISTED FIBERGLASS DUCTBOARD WITH BRANCH RUNS
CONSTRUCTED OF FLEXIBLE DUCT.
5. BATH EXHAUST FANS TO BE VENTED TO THE NEAREST SIDEWALL OR ACCEPTABLE ROOF AREA. VENT THAT ARE
INACCESSIBLE SHALL BE RUN IN GALVANIZED METAL
6. DRYER VENT SHALL BE VENTED TO THE NEAREST SIDEWALL VENTS THAT ARE INACCESSIBLE SHALL BE RUN IN
GALVANIZED METAL NO SCREWS ALLOWED.
7. DUCTWORK SHALL BE INSTALLED AS SHOWN ON DRAWINGS. ANY CHANGES TO DUCT SYSTEM AS A RESULT OF
UNFORESEEN STRUCTURAL LIMITATIONS SHALL BE APPROVED BY THE MECHANICAL ENGINEER.
8. FURNACE FILTERS SHALL BE INSTALLED DURING CONSTRUCTION AND REPLACED DURING FINAL INSPECTION.
9. ALL WORK SHALL COMPLY WITH STATE AND LOCAL CODES GOVERNING THIS PROJECT.
10. SUBMITTALS MUST BE APPROVED BY MECHANICAL ENGINEER PRIOR TO START OF WORK. (10 SETS)
11. CONTRACTOR IS RESPONSIBLE FOR COORDINATING HIS WORK WITH ALL OTHER TRADES.
12. RETURN AIR PULLED THROUGH LOUVERED DOOR IN APARTMENT UNIT UNLESS OTHERWISE SPECIFIED ON DRAWINGS.
12"
4x10x6
75 CFM
Unit C2
3rd Floor
75 CFM Water 75 CFM
Heuer JJ
Z
r
W
W
Z
cn
V W
Z 0
W
W
o i)
0
00 cy
Lo
COoN-
d I N
1
MIN
W
J
z
0
w
0
0
1
w
0
Z
W
0
0
a.
\O- Rpro
No.
860351
SHEET NO.
STATE OF 4
•••••""1 4 L
DATE: G/Z 8/d/
REV:
0
z
W
o W
o z
2
z
W