HomeMy WebLinkAbout10039_ASI 3 2.3.11 1 of 2.pdfArchitect's
Supplemental Instructions
AIA Document G710
PROJECT: Carmel Health & Living DaVita Dialysis Clinic ARCHITECT'S SUPPLEMENTAL
(name, address) 118 Medical Dr INSTRUCTION NO: THREE (3)
Carmel, IN 46032
DATE OF ISSUANCE: 2-3-11
OWNER: DaVita ARCHITECT: WJE Healthcare Architects
203 Cedar Woods Way 8207 Melrose Drive, Suite 145
Canton, GA 30114 Lenexa, KS 66214
TO: Scott Tucker ARCHITECT'S PROJECT NO: 10039
(Contractor) 47 Woodlawn Ave
Fort Mitchell, KY 41017
CONTRACT FOR: General Construction Work, Including, Plumbing, Heating, Ventilation and Air Conditioning, Fire Protection
and Electrical Work
CONTRACT DATED:
The Work shall be carried out in accordance with the following supplemental instructions issued in accordance with the Contract
Documents without change in Contract Sum or Contract Time. Proceeding with the Work in accordance with these instructions
indicates your acknowledgment that there will be no change in the Contract Sum or Contract Time.
Description:
OWNER
ARCHITECT
CONSULTANT
CONTRACTOR
FIELD
OTHER
[ ]
[ ]
[ ]
[ ]
[ ]
[ ]
Architectural
• Sheet COV: Reissue to show new project square footage.
Reissue to show new occupant load/exit requirements.
Reissue to show modified code footprint.
• Sheet A1.0: Reissue to show expanded demolition area to include existing patient room and bathroom.
• Sheet A1.1: Reissue to show expanded reflected ceiling demolition area to include existing patient room and bathroom.
• Sheet A1.2: Reissue to show expanded floor plan to show the expansion of Office 1-114 and the addition of Break 1-114B,
Teammate Toilet 1-114C, Patient Toilet 1-112, and Infectious Waste Storage 1-112A.
Reissue to show the addition of Elevations 1-5/A1.2.
• Sheet A1.3: Reissue to show expanded reflected plan to show the expansion of Office 1-114 and the addition of Break 1-114B,
Teammate Toilet 1-114C, Patient Toilet 1-112, and Infectious Waste Storage 1-112A.
Reissue to show the addition of an 1-Hr Rated wall around the Office 1-114 , Break 1-114B, Teammate Toilet 1-114C,
Patient Toilet 1-112, and Infectious Waste Storage 1-112A.
Reissue to show the new locations of sound batt insulation for the expansion of Office 1-114 and the addition of
Break 1-114B, Teammate Toilet 1-114C, Patient Toilet 1-112, and Infectious Waste Storage 1-112A.
• Sheet A1.4: Reissue to show the expansion of carpet in Office 1-114 and field VCT (VCT-1) in Break 1-114B,
Teammate Toilet 1-114C, Patient Toilet 1-112, and Infectious Waste Storage 1-112A.
• Sheet A1.5: Reissue to show the expansion of accent paint(P-3) in Office 1-114 and field paint (P-1) in Break 1-114B,
Teammate Toilet 1-114C, Patient Toilet 1-112, and Infectious Waste Storage 1-112A.
• Sheet A1.6: Reissue to show the addition of two new corner guards in Office 1-114, high impact panels to underside of cabinets
in Break 1-114B, high impact panels to 52" A.F.F. in Teammate Toilet 1-114C and Patient Toilet 1-112, and 52" A.F.F.
FRP wainscot on walls mounted on top edge of rubber base with continuous clear sealant bead and corner guard in
Infectious Waste Storage 1-112A.
• Sheet A3.1: Reissue to show the addition of three new doors and related hardware on the Door Schedule.
Reissue to show the addition of three new rooms and related finishes on the Room Finish Schedule.
• Specifications: 10050 Toilet Accessories
Addition of specification section that includes toilet accessories.
Mechanical/Plumbing/Electrical
• Sheet PD1, “Plumbing Demolition Plan, 1/PD0
Additional water closet and sink removed in existing room. Reference revised sheet PD1.
• Sheet P1, “Below Grade Plumbing Plan, 1/P1”
Additional waste piping for new patient and teammate toilets, 1-112 and 1-114C. Reference revised sheet P1.
• Sheet P1, “Above Grade Plumbing Plan, 1/P1”
Additional cold water, hot water and vent piping for new patient and teammate toilets, 1-112 and 1-114C. Reference
revised sheet P1.
Additional plumbing fixtures, water closet and lavatory, added to floor plan and plumbing fixture schedule. Reference
revised sheet P1.
• Sheet P1
Revised and added notes as necessary for plumbing modifications.
• Sheet ME1, “Mechanical Mechanical / Electrical Roof Plan, 1/ME1 ME1”
Added vent thru roof. Reference revised sheet ME1.
Added exhaust fan “EF2” and associated electrical circuit. Reference revised sheet ME1.
• Sheet MD1, “HVAC Demolition Plan, 1/MD1”
Additional supply and return air ductwork being modified. Reference revised sheet MD1.
• Sheet M1, “HVAC Plan, 1/M1”
Added exhaust fan “EF2” ductwork serving new infectious waste storage, patient and teammate toilet rooms.
Reference revised sheet M1.
Added supply air serving new toilet rooms. Reference revised sheet M1.
• Sheet M1, “Exhaust Fan Schedule”
New exhaust fan “EF2” added.
• Sheet ED1, “Electrical Demolition Plan, 1/ED1”
Additional existing electrical devices within existing room being removed. Reference revised sheet ED1.
• Sheet E1, “Lighting Plan, 1/E1”
Revised lighting layout, added additional fixtures as necessary for modified floor plan layout. Reference revised sheet E1.
Modified circuitry to occupancy sensors in storage 1-119A and water room 1-119. Reference revised sheet E1.
• Sheet E1, “Power Plan, 2/E1”
Additional receptacles and circuits for modified floor plan. Reference revised sheet E1.
Added Nurse Call system to monitor new patient toilet 1-112. Reference revised sheet E1.
Additional visual fire alarm devices added to toilet rooms 1-112 and 1-114C. Reference revised sheet E1.
• Sheet E1:
Added detail “4/E1” Nurse Call System Riser. Reference revised sheet E1.
Added notes for new plan modifications. Reference revised sheet E1.
• Sheet E2:
Revised Circuit Breaker Panelboard Schedule for panel “LP1” for new plan modifications. Reference revised sheet E2.
Added light fixture type “A5” to “Light Fixture Schedule” and modified schedule notes for new fixture. Reference
revised sheet E2.
• Specifications: 10050 Toilet Accessories
Revised section 15B-5 to include water closet connections.
Revised section 15B-10 to include water closet seats.
Attachments: Architectural Sheet Set COV-3.1
MEP Sheet Set PD1, P1, ME1, M1, ED1, E1, E2
Architectural Specification Section 10050 Toilet Accessories
MEP Specification 15B-5 and 15B-10.
ISSUED BY: WJE Healthcare Architects