HomeMy WebLinkAbout1384.97xHOUSE NAME ELEV.
SET NUMBER
PLAN JOB NUMBER
RIGHT BAND OR LEFT HAND
AMA NON -STD. CHANGES?
FRONT OR SIDE LOAD GARAGE
STD., ENLARGED, OR FULL BSMT.
(IN SET
FIREPLACE OPT.
(OPT. 293) (OPT. 295)
ALL SIDING OR BRICK FRONT
(IN SET (OPT. 490)
BSMT. WINDOW OPT. QTY.
(MARK LOCATION(5) ON PRINT
FRONT PORCH WALL HT. TO BE
ABOVE TOP OF FTN. WALL
ABOVE W/ 11 1/8" 1st FLR T.J.i.'8 6" ABOVE W/ 14" 1st FLR. T.J.f.'s
NOTE: INSTALL BRICK LEDGE ON MASONRY FIREPLACES
BU!LDING PERMIT NUMBER
LOT ADDRESS
TOWNSHIP
CHECKLIST
SUMP PUMP LOCATION MARKED
EJECTOR PIT LOCATION MARKED
MARK OUT ALL +AUNCNES NOT USED
MARK IN FRONT PORCH WALL
IF NOT ON PRINTS
PRE-START CHECKLIST TURNED IN
BASEMENT
PROJECT INFORMATION
ATTACH SELECTION SHEET TO WALL
CONTRACTOR. PRINTS
ATTACH PLOT PLAN AND STAKE SHEET
TG EXC4 `.':.TOR PRINT. MAKE SURE THEY 11 TCI-4
EACH OTHER AND SELECTION SHEET
I.e. 55TANDARG OR R .VERSE D
MARK -UP ALL NON- STANLD4RD C:N4NGE:a I•-+C.:E.;
EXTENSIONS, 4ND GARAGE E.-,
BEAM LAKE -OFF 5kEE T COMPLETE AN1=. TURQ1'�` i!<
10 FQUNU>4TION SUPERVISOR
(TO BE COMPLTED EVEN IF NO BEAMS REQ'.a ;RF
ADD T Tu aS'`^T. STEEL BEAMS ON WAL.< OUT
5, ASEMENTS r :Ii ;.;:ALL.'-: `.7Ep DOWN
BA3E1' ENT wI>tii'.Ck' LOCATIONS DO NOT I`I I ERFER:_
OR BAY WINDOWS
SUPER VISOR
MASONRY
PRE -FAB
FOUNDATION CHECKLIST
SEWER AND WATER SLEEvE
LOCATIONS MARKED (3' W/ 4' SEWER
COUPLER, 5' UP 1 1/2' SLEEVE)
NiGPLIG-4T ALL BEAM POCKETS
H IGHL 1GI-kT ALL PAD FTG. L 0 0 4 7 1 0 N 5
MARK ONE OR TWO GARAGE DOORS
BSMT. BATH ROUGH -IN LO, 4T O S
DO NOT INTERFERE WITH FuRn1ACE
STANTION POST LOCATIONS
1
HOUSE NAME ELEV.
SET NUMBER
PLAN JOB NUMBER
RIGHT HAND OR LEFT HAND
ANY NON -STD. CHANGES?
FRONT OR SIDE LOAD GARAGE
ALL SIDING OR BRICK FRONT
(IN SET
FIREPLACE OPT.
WORKSHEET Ry
SLAB
PROJECT INFORMATION
(OPT. 490)
NOTE: INSTALL E3RfCK LEDGE ON MASONRY FIREPLACES
BUILDING PERMIT NUMBER
LOT ADDRESS
TOWNSHIP
CHECKLIST
MASONRY
PRE -FAB
MARK OUT ALL HAUNCHES NOT USED
MARK IN FRONT PORCH WALLS IF NOT ON PRINTS
WATER SLEEVE LOCATION MARKED
HIGHLIGHT ALL L THICKENED SLAB FOOTINGS
t- 4ICGNLIG+ -4T ALL PAD FOOTING LOCATIONS
BEAM TAKE -OFF SHEET COMPLTE AND TURNED IN
TO FOUNDATION SUPERVISOR
(TO BE COMPLTED EVEN IF NC BEAMS REQUIRED)
MARK ONE OR TWO GARAGE DCCRS
ATTACH PLOT PLAN ANn S7 {,KE SHEET
TO EXCAVATOR PRINT. MAKE SURE T +;E MATC
EACH OTHER AND SELECTION SHEET
Le. STANDARD OR R'✓ERSED
ATTACH SELECTION SHEET TO 5LOCK
CONTRACTOR PRINT
MARK -UP ALL NON -STANL 4RD OHAN ES, HOUSE
EXTENSIONS, AND GARr°;GE EX T ENSIONS
PRE-START CNE CK. IST TURNED `N
REVISED i0/1/91
1. GARAGE
GARAGE DOOR OPENING FRAMED TO CORRECT SIZE: T HT., 8' OR 16 WIDE.
GARAGE ATTIC ACCESS FRAMED TO CORRECT SIZE AND LOCATION.
NAILERS AT ALL CORNERS OF GARAGE AND CEILING.
GARAGE STEP FRAMED AND KICK PLATE UNDER DOOR
BOW STUDS
STRAW ANCHOR NAILED CORRECTLY
EQUAL RISER HEIGHT AT GARACGE STEPS (8 1/4" MAX.)
PRINT HUNG ON NAIL IN GARAGE
C4 -BECK FOR LOAD BEARING POINTS AND PROPER LOAD TRANSFER
2. BASEMENT AND HOUSE
CI -1ECK BASEMENT STAIR AND 2nd FLOOR STAIR INSTALLATION
HALF -WALL 42" FROM FLOOR AND SAME PITCH AS STAIRS 11/2" PAST STRINGER
CB PANELS HAVE BLOCKS ON ENDS
CHECK FOR LOAD BEARING POINTS AND PROPER LOAD TRANSFER
STRAP ANCHORS SECURED IN HOUSE
STAIRWAY SHIMMED (MAX. 1/2" GAP EACH SIDE)
HANDRAIL BLOCKS INSTALLED 32" FROM STAIR NOSING AND LOFT NEWELL POSTS
SAFETY BOOTS AND RAILS INSTALLED 3 1/2" FROM STRINGER
BARRICADE BACK DOOR IF STEP 15 GREATER THAN le"
SQUASH BLOCKS INSTALLED PER PLAN AND T.J.I. DETAIL SHEET
CRAWL. SPACE AND BASEMENT CLEANED OUT
FILL GAPS W/ PLYWD. WHERE T.J_;.'s MEET IN CORNERS AND FIREPLACE CANT.'s
3. HOUSE
CHECK FOR BOW STUDS
CHECK FOR NAILERS
MARK DOOR SWING DIRECTION AND SIZE
CHE :,K FOR CASING ROOM (MIN. 2" ON EACH SIDE)
CHECK CENTERLINE OF KITCHEN WINDOW
CI -4ECK BULKHEAD DIMENSIONS (2" LONGER AND 2" WIDEN THAN CABINETS)
CHEC: WALL SIZES IN RELATION TO CABINET SPACE
CHECK VANITY SIZES IN RELATION TO WALL SPACE
CHECK VANITY DEPTH TO DOOR OPENfNG (MIN. 24 1/2"
CHEC..K DOOR OPERATION AND INSTALLATION
CHECK WINDOW OPERATION AND INSTALLATION
PETC RAIL WALL INSTALLED 1/2" BELOW STRINGER AND 1 1/2" SNORT
TUB ATFOR!'1 BUILT CORRECTLY 16 1/2" HT., 38" X 51" INSIDE
NAILERS FOR FIBERGLASS TUBS AND CASING AROUND TUBS INSTALLED.
MEA•t'.RE VINYL AREAS FOR SQUARE
It ANC 2nd FLOORS LINE UP IN STAIR WELL
NO GAS ABOVE STAIRWAY DRAFTSTOP
STAIRWAY DROP CEILING DONE CORRECTLY (CHECK PRINTS)
FLOC>R S+- 4EATNING NAILED PER SPEC.'S
FALL F'ROTECTION INSTALLED AT STAIR WALL OPENINGS
EYEBOLT AND ANCHOR POINT IN PLACE
AFL CRAP STOP INSTALLED ON CHASE AND BAND
PERI^'IETER AND PANELS GLUED
INTERIOR WALLS GLUED DOWN
INTEF. :I R AND EXTERIOR WALLS NAILED INTO I- JOISTS BELOW
5E TUBS INTO ROOM AND WIPE -OUT
�•T i'' -CCE55 INSTALLED IN 1 -40USE PER PRINT
JOIST -I .LAGERS NAILED FRONT AND SIDES
ALL (:2;RDER TRUSSES NAILED PER ENGINEERING
4. EXTERIOR
ALL T /ECK STAPLED IN -PLACE EXTERIOR
ALL 4()LES PA T C;4ED IN INSULATION BOARD
ALL -,ir,• INSTALLED F'ER PRINT
3 1/2' ;'IT'S /2 SHEATHING INSTALLED ON CORNERS
ALL JINDOW5 TAPE-7D ON TOP AND GLUED ON FOUR SIE ES,
ALL. r) OR`s TAPED ASUVE
ALL ...)!NiDOWS INSTALLED PER PRINT, ELEVATION AN')
SITE u .E r) UP AND PUT IN PILE EACH D AY
2 1ND TO OF CHIMNEY i I /2" FAST CNIMN ='Y FLAT
TRUSSES NAILED PER ENGINEERING
IX4 E T EN51ON5 INSTALLED AT ':ONT =:'OOR AND U�IN: ow SURROUNDS
'NE T.ALLED UNDER FRONT DOOR AND GARAGE RETUSN UJAL!
FRAME PUNCH -OUT CHECK LIST
51DE5