Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Cover Sheet.pdf
SPINE O.R. ROOM RENOVATION/BUILD-OUT CONSTRUCTION DOCUMENTS 26 JANUARY 2011 CARMEL HOSPITAL 13500. N. MERIDIAN STREET CARMEL, INDIANA 46032 CONSTRUCTION DOCUMENTS 26 JANUARY 2011 BSA #04610072.00 COVER SHEET A100 -FIRST FLOOR PHASING PLAN AND DEMOLITION PLAN A101 -FIRST FLOOR ARCHITECTURAL PLAN AND REFLECTED CEILING PLAN A600 -INTERIOR ELEVATIONS, DOOR SCHEDULE, DETAILS, & EQUIPMENT SCHEDULE IF110 -FIRST FLOOR FINISH PLAN HP1 -MECHANICAL SYMBOLS, SCHEDULES, AND DETAILS H110 -HVAC DEMOLITION PLAN H210 -HVAC PLANS P110 -FIRST FLOOR DEMOLITION PLUMBING PLAN P310 -FIRST FLOOR PLUMBING PLAN E001 -ELECTRICAL SYMBOLS AND GENERAL NOTES E100 -FIRST FLOOR ELECTRICAL DEMOLITION AND LIGHTING PLANS E200 -FIRST FLOOR POWER, SYSTEMS, AND CONDUIT PLANS E300 -PARTIAL FIRST FLOOR ELECTRICAL PLAN, SCHEDULES, AND DETAILS B1 -BERCHTOLD DRAWINGS B2 -BERCHTOLD DRAWINGS M1 -MEDTRONIC NAVIGATION DRAWINGS M2 -MEDTRONIC NAVIGATION DRAWINGS